stress meter 中文意思是什麼

stress meter 解釋
應力計
  • stress : n 1 壓力,壓迫,緊迫,緊張。2 【語音】重音;重讀;【詩】揚音;語勢,著重點。3 重要(性),重點,...
  • meter : n. 1. 測量儀表,計量器;計,表。2. 計量人;計量官。vt. 用表計算[測量、記錄]。n. 〈美國〉= metre.
  1. Frost was not only a metrist but a poet who gloriously manhandled meter, making it stress fine shadings of speech and thought

    弗洛斯特不僅是一個格律詩人,他還有力推動了格律的發展,使格律強調話語和思想的精妙背景。
  2. In this paper, features of decadal variability and the possible mechanism of sea - air system in the pacific are investigated by using upper - ocean temperature, heat storage and wind stress data, the main results are as follows : the most pronounce decadal sign exists at about 160 meter in depth in the western pacific. there are significant decadal abrupt changes in temperature from surface to deep in the subsurface at about 1980. with different depth in the subsurface, there exist 4 types of abrupt change modes, their generation is closely related to the decadal sign which originates from the east of north pacific and propagates along the south - west subduct ion route

    研究表明,太平洋次表層海溫最強的年代際信號在熱帶西太平洋約160m深處,此信號在1980年前後從上至下,先後經歷了一次顯著的年代際突變過程,而且隨深度的不同存在著四種不同的空間突變模態,這四種模態的形成與北太平洋海溫異常的西南潛沉路徑有著密切的聯系。
  3. The principal stress value arised alteration, the magnitude of stress closed to 25 ~ 32mpa, its influence scope was within the scope outside of tunnel opening 10 ~ 15 meter, maximum tense focused at vault and middle of floor about half meter. shearing stress focused at corner of vault and wall, always been sheared

    主應力量值也發生了較大改變,壓應力可達25 32mpa ,其影響范圍在隧道邊墻外10 15m ;拉應力集中在拱頂和底板中部約0 . 5m范圍內,最大可達10mpa ;在拱腰和墻腳常為剪應力集中區,易發生塑性剪切破壞。
  4. If the inputted accelerations are velocity - zeroized and the damage value is calculated according to shear stress " extrema, as to 100 - meter - high earth dam, multi - point effect is not distinct ; but as to 240 - meter - high earth dam, in the part where permanent displacement and damage value is originally bigger the response is less tenser than that by one - point input, and in the part near basement the maximal shear stress and damage value is bigger, that is the multi - point effect in time domain

    若同時進行了多點地震動速度歸零化和採用基於極值的損傷值計算方法,對於100米高的土石壩,多點輸入與單點輸入反應十分接近。對於240米高的超大型土石壩,壩體內永久位移和損傷值較大的部位多點輸入的反應量較小,這是多點輸入反應的特點或說多點效應。另外,多點效應也包括壩基部位的最大動剪應力和損傷值偏大這一效應。
  5. Analysis was made on the fracture of pipe fittings and screw cap which connected water meter by the flaw theory and metal mechanics after stress accounting and microstructure analysis of the broken position

    摘要通過對斷裂位置的應力計算及斷裂位置的微觀組織分析,應用裂紋理論及材料力學相關方法,對自來水表管接頭及螺母斷裂進行了分析研究。
  6. It is not always good at increased the cement ratio ; sometimes it is even harmed to the strength of the pile. the strength of the pile must matches the strengths of the origin soft foundation. improved fixing methods of strain meter and how to calculate the deformation modulus, the load transfer behavior of cement - soil pile, the compound foundation bearing capacity, pile - soil stress ratio with the increasing of the load are analyzed and studied

    本文通過分析和試驗分析,提出樁間土天然地基承載力標準值的取值方法、樁間土承載力折減系數取值方法,這和實測結果很接近;並得出提高復合地基置換率是提高復合地基承載力有效途徑,並具體比較了單樁復合地基和三樁復合地基提高天然地基的承載力的數值,並驗證樁體強度應和天然軟基相匹配,指出盲目提高樁體強度是不可取的,有時甚至偏於不安全,這對于當前的建設是很有意義的。
  7. On the premise of satisfying all constraint conditions stipulated in the codes with the pipe thickness spacing, height and thickness of stiffener rings as variables and the total steel quantity per meter of pipe as objective function, the program is developed for structural stress computation and comparison of total steel quantity used so as to select the alternative with smallest total steel quantity per meter of pipe

    該程序在滿足規范規定的各種約束條件下,以管壁厚度、加勁環間距、高度和厚度等作為變量,以每米鋼管的總用鋼量為目標函數,進行結構應力計算和工程量比較,從中選出用鋼量相對最小的設計方案。
  8. The research effort offers favorable condition for future research of the shape meter closed - loop computer control system. stress signal generator which can generate the voltage signal similar with rolling tension stress signal is be designed. with the signal generator, testing shape meter control system will be very convenient and its development cycle will be significantly shorten

    另外,利用微機和pcl - 812pg數據採集卡等設計並研製出了可以產生符合軋制張力要求的張力信號源,利用張力信號源為板形儀控制系統的實驗、調試提供了方便,可大大縮短板形儀的研製周期。
分享友人