subordinate phase 中文意思是什麼

subordinate phase 解釋
第二階段
  • subordinate : adj 下級的,次級的,副職的;從屬的;服從的 (to)。 a subordinate clause 【語法】從句。 subordina...
  • phase : n 1 形勢,局面,狀態;階級。2 方面,側面。3 【天文學】(月等的)變相,盈虧;【物、天】相,周相,...
  1. Phase i : 1950s 1980s. in this phase, humans ’ limited cognition of nature laws, increasing demands caused by population explosion and unreasonable utilization of natural resources lead to the sharp decrease of runoff volume and shrink of the lake area. the ebinur lake area change converses from the condition subordinate to nature to human activity

    即第一階段: 20世紀50 80年代末,此階段由於人類對自然規律認識的局限性,以及人口增長造成的需求增長,不合理利用水土等自然資源,導致入湖水量劇減,艾比湖呈現急劇縮小的趨勢,湖面變化從受控于自然條件向受控於人類活動方向轉變。
  2. Author also stressly calculates plane deformations of skew girder bridge due to the actions of the subordinate phase dead load, temperature changes, shrinkage and creep of concrete and vehicle loads in different places, and thereby analyses the characteristics of plane movement for the skew girder bridge

    作者還著重對斜梁橋的二期恆載、混凝土收縮、徐變、溫度變化和不同位置汽車荷載作用下的平面變形進行計算分析,由此分析斜梁橋的爬移特點。
  3. The company serves content around project early days, metaphase, later period each phase, cover earth to build, each major such as adornment, installation, municipal, gardens, traffic, irrigation works ; especially : service of representative of invite public bidding permeates reconnaissance, design, inspect manage, construction, equipment, material, purchase wait for each domain ; cost seeks advice use current the most advanced tsinghua si weier is three - dimensional system of software calculating an amount, control to the project executes the spot to be mirrorred in real time and undertaking cost dogs ; the adroitness in project management uses fidic term and conditions of contract, the mature construction on international project management pattern introduces in management of domestic construction project ; company of software of subordinate path be in harmony is with advanced science and technology rely on, foot of client of prep close behind leads the market, dedicated the development at project software, apply with promotion

    公司服務內容圍繞工程建設前期、中期、後期各階段,涵蓋土建、裝飾、安裝、市政、園林、交通、水利等各專業;特別是:招標代理服務滲透到勘察、設計、監理、施工、設備、材料、采購等各領域;造價咨詢採用當前最先進的清華斯維爾三維算量軟體系統,對工程實行現場實時反映並進行造價跟蹤控制;項目管理中熟練運用fidic合同條件,將國際上成熟的建設項目管理模式引入到國內建設項目管理中;下屬道融軟體公司以先進科技為依託,緊隨客戶步調引領市場,專注于工程建設軟體的開發、運用與推廣。
  4. Secondly author calculates and analyses normal stress and shear stress of the girder for a assembling post - tensioned concrete skew girder bridge with a span of 40 m due to the actions of the dead load, temperature changes, shrinkage and creep of concrete and live loads, and calculates and analyses normal stress and shear stress of diaphragms due to the actions of the subordinate phase dead load, temperature changes, shrinkage and creep of concrete and live loads

    其次重點對跨徑為40m標準設計的裝配式后張預應力混凝土斜梁橋在恆載、溫度變化、混凝土收縮和徐變、活載作用下主梁的正應力、豎向變形和恆載、活載作用下主梁的剪應力進行計算分析。計算分析橫隔板在二期恆載、溫度變化、混凝土收縮、活載作用下的正應力、剪應力。
分享友人