supply reservoir 中文意思是什麼

supply reservoir 解釋
供應罐
  • supply : vt ( plied) 供給;供應;配給;補充,填補,彌補(不足、損失等)。 Cows supply us (with) milk ...
  • reservoir : n. 1. 貯藏所;貯氣筒;貯水池,水庫;貯水槽,水槽;貯存器;貯油器,油筒,油箱;貯墨管;【解剖學】貯液囊。2. (知識、精力等的)貯藏,蓄積。vt. 貯藏;在…設貯藏所[貯水槽]。
  1. The following are the large projects undertaking by haifeng company : crude oil electricity plant project of north china oil field hydroelectricity factory, apartment ( 22 stories ) of yuanda real estate company of dalian shipping group, helios hotel of helios group in dalian development zone, tilt aqueduct bridge of shanxi hongqi reservoir ( total span : 267m ), supply and sale building and city construction building ( both are antique architectures ) of shanxi heyang city, sea drainage pipe of hainan fudao fertilizer factory ( 1520 ), 8 oilgas docks of hainan haiyan oilgas company, basha condensable gas transfer station of haiyan company, 10, 000m3 oilgas storage tank of arco company ( usa ) in hainan nanshan, gas pipe and fuel gas installation project of hainan nanshan electricity co., ltd, base and accessory project of hainan gas company, bei da huang cereal and oil market in harerbin, hainan cross island pipe, changhuajiang river pipe crossing project, taihangshan mountain earthwork project ( the 19th section of west - to - east gas transmission project )

    海南海峰公司承建大的工程項目:華北油田水電廠原油發電站工程;大連船泊集團遠達地產公司的遠達公寓( 22層) ;大連開發區香港太陽神集團的太陽神大酒店;陜西紅旗水庫斜拉渡槽工程(全跨267m ) ;陜西合陽供銷大樓及城建大樓(均為仿古) ;海南富島化肥廠排海管線( 1520 ) ;海南海燕油氣公司八所油氣碼頭;海燕公司白沙液化氣中轉站;海南南山美國阿科公司儲油氣萬立米大罐工程;海南南山電力股份有限公司天然氣管線及燃氣安裝工程;海南南海天然氣有限公司基地及配套工程;哈爾濱北大荒糧油批發市場;海南環島管線;昌化江穿越工程;西氣東輸十九標段,太行山土石方工程。
  2. From roundwood reservoir in county wicklow of a cubic capacity of 2, 400 million gallons, percolating through a subterranean aqueduct of filter mains of single and double pipeage constructed at an initial plant cost of 5 per linear yard by way of the dargle, rathdown, glen of the downs and callowhill to the 26 acre reservoir at stillorgan, a distance of 22 statute miles, and thence, through a system of relieving tanks, by a gradient of 250 feet to the city boundary at eustace bridge, upper leeson street, though from prolonged summer drouth and daily supply of 12 1 2 million gallons the water had fallen below the sill of the overflow weir for which reason the borough surveyor and waterworks engineer, mr spencer harty, c. e., on the instructions of the waterworks committee, had prohibited the use of municipal water for purposes other than those of consumption envisaging the possibility of recourse being had to the importable water of the grand and royal canals as in 1893 particularly as the south dublin guardians, notwithstanding their ration of 15 gallons per day per pauper supplied through a 6 inch meter, had been convicted of a wastage of 20, 000 gallons per night by a reading of their meter on the affirmation of the law agent of the corporation, mr ignatius rice, solicitor, thereby acting to the detriment of another section of the public, selfsupporting taxpayers, solvent, sound

    但是由於夏季久旱,再加上每天供水一千二百五十萬加侖,水位已降到低於排水口。都市監察官兼水道局技官土木工程師斯潘塞哈蒂奉水道局的指示鑒于有可能會像一八九三年那樣被迫利用大運河和皇家運河那不宜飲用的水,除了飲用外,下令一律禁止使用市裡供應的自來水。尤其是南都柏林濟貧院,盡管限定用六英寸的計量器,每個貧民每日配給十五加侖水,然而在市政府法律顧問辯護律師伊格內修斯賴斯的監督下,經查表證實,每夜要浪費兩萬加侖水,從而使院外的社會各階層也就是自費並有支付能力的納稅者們蒙受損害。
  3. Additionally in 1939, the government added filter beds to the aberdeen lower reservoir. due to these improvements, the network of water supply was further widened and even remote areas, such as ap lei chau, could receive fresh water

    政府並於1939年,在鴨利洲及香港仔下塘各增建濾水池,使水塘的供水能伸延至鴨利洲一帶的偏遠地區,供水網路得以擴張。
  4. In 1897, the government built a matching water system and three filter beds for the reservoir. during the drought period, private reservoirs helped the government to supply water to hong kong residents, thus easing the problem of water shortage

    1897年,政府更為該塘興建一個配水庫及三個濾水池。在天旱期間,私人水塘曾協助政府,提供食水予香港居民,紓緩香港食水短缺的問題。
  5. As the valley was situated in a high area, the water supply scheme utilised gravity flow. however, the reservoir had a small capacity of just 27 million gallons, only 38 % the size of its pokfulam counterpart

    由於峽谷位處高地,供水方法仍可以利用水向低流的原理,讓水塘存水順勢流往山下區域,省去興建抽水站的工程。
  6. Nilometer is widely used in the system of automatic detection and automation in many water supply such as oil industry, chemical industry, metallurgy industry, electric power, irrigation works, reservoir, bulk plant, pumping station, towns water and so on. and it is a important tool in these fields

    水位、閘位計廣泛應用於石油、化工、冶金、電力、水利、水庫、油庫、泵站、城市供水等領域的自動檢測和控制系統中,是這些領域不可缺少的一種重要工具。
  7. The result of a case study demonstrates that the proposed flood limit water level of biliuhe reservoir can go up suitably, along with the step - by - step raise of water supply

    計算結果表明,隨著大連市用水量的增加,碧流河水庫汛限水位可適當抬高。
  8. The tai po water treatment works together with the butterfly valley primary service reservoir in kowloon and the 12km long treated water aqueduct connecting the two waterworks form the tai po water scheme. this is one of the biggest water supply projects that the water supplies department ( wsd ) has undertaken in recent years

    大埔濾水廠連同九龍的蝴蝶穀食水主配水庫,以及連接濾水廠和配水庫的十二公里長食水輸水管道,組成大埔濾水廠供水計劃,是水務署近年來進行的其中一項最龐大的供水工程計劃。
  9. In this paper the present situation of water supply source and the existing problem in shangzhou city is analyzed, and the countermeasure is advanced to intensify the unified management of water resource, to develop the surface water of erlongshan reservoir and improve the utilization efficiency of water resource

    本文分析了目前商州市城區供水水源現狀及存在問題,並提出了加強水資源統一管理、開發二龍山水庫地表水、提高水資源利用率等解決對策。
  10. The plover cove reservoir opened in 1968. during the period from 1968 - 1969, an average daily supply of 39, 000, 000 gallons was provided for public use. by 1970, the supply had increased to 200, 000, 000 gallons per day

    水塘於1968年年底開始使用, 1968 1969年間平均每日供水量約3 , 900萬加侖, 1970年代增至2億加侖。
  11. Also speaking at the ceremony, the director of water supplies, mr william ko chan - gock, said the service reservoir was planned and designed in - house by wsd. " this new service reservoir serves to provide the balancing storage and the breakdown storage including the fire - fighting reserve to its supply zone, " mr ko said

    高贊覺說:新的配水庫既可提供儲水量以緩沖用水量的波幅,亦可儲存應急供水,為供水區內的用戶供應食水,包括后備消防供水。
  12. The heiquan reservoir is the key project for the irrigation of huangshui river base and the water supply of xinin city

    黑泉水庫是為解決湟水流域灌溉和西寧市供水問題而興建的大型水利樞紐工程。
  13. And from the end of the reservoir, a 3 - mile long aqueduct would gravitate water to the shenzhen reservoir. from the reservoir, water further gravitates to hong kong. the dongshen water supply scheme started at the qiutou (

    東深工程運河起自廣東省東莞市橋頭縣,流經司馬、旗嶺、馬灘、塘廈、竹塘、沙嶺、上埔、雁田及深圳等地,全長83公里,主要建設包括6座攔河閘壩和八級抽水站。
  14. As they were situated directly in the proposed reservoir site, they were resettled in tai long wan, a western coastal area of lantau island and a resettlement area in tsuen wan. others, whose land was included as part of the catchment area, or affected by the construction of the catchwaters, faced a different situation. among them, the residents of pui o including lo wei village and sun wei village, ham tin, law uk, san shek wan, upper cheung sha and lower cheung sha village, tong fuk and shui hou village suffered from disturbance to their natural water supply

    一些被興建引水道影響或被辟為集水區的村落,如貝澳老圍村、新圍村、咸田村、羅屋村、散石灣、長沙上村、長沙下村、塘福村及水口村,原來流經村落的河流及地下水源,因主要水流被引水道堵截,農田無足夠水灌溉,早造開耕嚴重不足,居民須往他鄉運水,以應付日常生活急需及維持灌田。
  15. Sprayed concrete applied to inlet consolidation of water supply tunnel in dongfeng reservoir reservoir

    噴射混凝土在東風水庫輸水洞進口加固工程中的應用
  16. The three - gorge reservoir is the biggest base of freshwater source and the water source supply base to realize middle schema of southern water to north after its establishment. the water environment of three - gorge reservoir directly influences economy development of yangtze river band and the sustainable development of china

    三峽水庫建成后是全國最大的淡水水源基地,是實現南水北調的中線方案的水源補給地,水環境安全直接制約長江經濟帶乃至全國經濟的可持續發展。
  17. The existing reservoir water - supply operation rules focuses on the single water supply, paying little attention to multipurpose water supply with different priority and reliability

    摘要已有的水庫供水調度規則研究偏重於單一目標供水,對于有著不同優先級和保證率的多個供水目標的研究不足。
  18. But for the reservoir water - supply system, the reservoir whose oam cost is low and flow into the reservoir is more may be selected to be taken advantage of the storage capacity of this kind of increase to regulate some water yield more and in order to substituting the water supply of the other water supply projects whose oam cost is comparatively higher, so that to achieve the goal of the oam saved, that is to say, that can utilize this regulation capacity increased of the reservoir to optimize operation between the raw water systems so that to save the oam of the system. namely, it can obtain a certain economic benefits to utilize this kind of difference between water supply ability and reality water - using levels existing for a long time

    從長春市供水系統長期規劃和目前供水現狀研究得出,在目前和今後的長時期內長春市供水系統的供水能力總是大於實際用水水平。這種長期存在的差別對松花江供水只意味著減少抽水量。但對水庫工程供水系統則可挑選運行費用低的、入庫水量較多的某個水庫,利用這種增加的調節庫容多調節出一些水量,以替代運行費用較高的供水工程的供水。
  19. The object to study in this paper is the electric heat reservoir boiler, which is used to supply heat water and bask for the resident population. the use of the system define the character of the output medium with the lower request on quality and parameter, at the same time, it ask the boiler should has the higher character on the respect of the cost, reliability, economy, and so on. hence, the paper carefully design and study the system for the choice and design of the boiler core heating componet, the lay of the heat exchanger, the working status of the heat reservoir equipment, the adjustment and control mode of to supply heat water. the study work mainly include underside some contents, forexample : 1. to confirm the heat medium parameter to adapt the requirements of the most of the heating equipments and to design the instruction of the boiler and heat reservoir as simple as possible

    圍繞上述原則,本文從電熱鍋爐核心加熱元件的選型及設計、換熱面的布置、蓄熱設備的運行工況、供熱的調節方式以及控制方法進行了較細致的研究和計算,具體研究工作有以下幾個方面: 1 .根據使用要求,確定適用於多數採暖設備的熱介質參數,設計在結構型式上盡可能簡單的鍋爐和蓄熱器; 2 .對製造加熱元件電熱管的各種材料進行了對比和分析、在結構尺寸上進行了仔細的分析和計算,根據實際使用條件給出合理的設計,使其具有較高的可靠性和使用壽命; 3 .對不同換熱面布置形式進行傳熱分析。
  20. The second stage of the uprating engineering works were implemented after the signing of the agreement in august 1979 endorsing the planning report for the second stage extension of the dongshen water supply system. the main works were to extend the pumping facilities at matan, tongxia, zhutang, shaling, shanpu and yantian, and to increase the height of the main dam of shenzhen reservoir by 1 metre. the new works included the construction of a new pumping station - the dongjiang pumping station at the intake point at the riverbank of dongjiang to increase the volume of supply

    第二期工程於1979年8月簽訂《東江深圳供水工程第二期擴建規劃報告》協議后進行,主要是再擴大原工程在馬灘、塘廈、竹塘、沙嶺、上埔及雁田的抽水站,加高深圳水庫主壩1米,新建的工程則包括于新開河口興建東江抽水站,提高供水數量。
分享友人