supporting pile 中文意思是什麼

supporting pile 解釋
支承樁
  • supporting : adj. 1. 起支持[支撐]作用的。2. 協助[配合、支援]的;起配角作用的。3. 可提供證據的,證實的。
  • pile : n 1 軟毛,絨毛;毛茸。2 (布、絨的)軟面。vt 使起絨。adj d 有絨毛的。n 痔瘡;〈pl 〉痔。 blind pi...
  1. In the process of work, according to complex geological conditions such as huge thick soft clay in site and top surface of possible pile foundation supporting course fluctuating in large amplitude, we adopted many advanced exploratory methods ( just as high accuracy exploration of shallow earthquake, crosshole wave velocity test, vane shear test, pressuremeter test, etc. ), we found out that there is an ancient groove of yangzi river in former plant site, therefore we suggested in time that plant site should properly be moved eastwardly, only this item saved nearly about 50 million for pile foundation project cost

    在工作過程,根據廠址區軟粘土厚度大、可能作為樁基持力層頂面起伏變化大等復雜地質條件,採取了多種先進的勘探手段(如高精度淺層地震勘探、跨孔波速試驗、十字板剪切試驗、旁壓試驗等) ,查明了原廠址區存在一個長江古凹槽,並及時建議廠址適當東移,僅次一項就節省樁基工程費用近5000萬元。
  2. Bored pile - jet grouting supporting structure

    鉆孔灌注樁與噴射注漿組合支護結構
  3. In order to find out an economical, practical and reliable supporting method, some relevant technical personnel and i, based on successful experiences and project instances, designed the pre - stress anchor board supporting system, which is to exert pressure on the anchors and to independently support slopes. this system has successed and replaced the pile - anchor supporting system used in past

    為探索一種經濟、實用、可靠的支護方法,結合一些成功的經驗和工程實例,筆者與有關技術人員一起設計了預應力錨板墻支護技術,在錨桿上施加預應力,主動、獨立支護邊坡,取代了過去了常用的樁?錨支護體系,並實施成功,成為島城近年來深基坑支護主要技術之一。
  4. Secondly, based on the theoretical analysis of the chosen anti - slipping scheme, anti - slipping stress test, strength test of sealed - cover concrete, anti - floating test of cofferdam, stress test of supporting pile and stress test of stability are processed respectively, which proves that the new scheme presented in this paper is feasible

    然後對選定的抗滑方案進行理論分析,分別進行抗滑受力檢算、封底混凝土強度檢算、鋼圍堰抗浮檢算、支樁受力檢算和穩定受力檢算,從理論上驗證本方案的可行性。
  5. Impact of bottom settlings and mud cake on vertical supporting capacity of large - diameter predrilled cast - in - place pile

    樁底沉渣與樁周泥皮對大直徑鉆孔灌注樁豎向承載力的影響分析
  6. Secondly, compared with specification jgj 120 - 99, the problem of method which be using was pointed out base on a great number of numerical simulation, the interaction between pile - anchor supporting and soil nailing was analyzed

    其次,針對現行樁錨復合土釘支護設計方法,在大量數值模擬的基礎上,通過與規程進行對比,指出現行方法中存在的一些問題,並分析了土釘支護與樁錨支護二者之間的相互作用。
  7. Application of the combined pile - anchor supporting in reinforcement of high sandy gravel slope

    樁錨聯合支護在砂礫石高邊坡加固中的應用
  8. Discussion on the pile foundation parameter of driven cast - in - place file supporting course in slightly dense gravelly beds

    稍密狀礫砂層作沉管灌注樁持力層的樁基參數確定探討
  9. Analysis based on a large amount of data about the load - settlement, pile soil stress ratio and stress distribution obtained from the model tests shows that in the horizontal - vertical multiple reinforcing system, the horizontal reinforcing function of the geocell reinforced gravel mattress, the vertical reinforcing function of the gravel pile, the system of load transfer and supporting formed through interaction and working together mechanism between gravel pile composite foundation and geocell reinforced gravel mattress are the main mechanism of its load capacity improvement, settlement and asymmetrical settlement reduction

    試驗結果分析表明:在土工格室碎石墊層碎石樁復合地基這一水平向豎向多元復合地基共同作用的加固體系中,結合了土工格室碎石墊層的水平向增強體作用和碎石樁的豎向增強體作用;土工格室碎石墊層和碎石樁復合地基相互作用,共同工作構成的荷載傳遞和支撐體系是其提高承載力,減少沉降和差異沉降的主要機理。
  10. Through the algorithm of ann, the author has made out the three - layers and four - layers bp nets to intelligently study and reason, supporting decision on the detail reasoning, such as piles " capacity and pile cap ' s bearing pressure

    根據神經網路的學習演算法,編制了三層及四層bp網路的學習及推理程序。該程序在某些細部問題(如確定樁的承載力、承臺反力等)上提供輔助決策。
  11. C ) according the difference of geological condition and construction condition, this thesis select the best support among cantilever supporting pile, one - anchored supporting pile and soil nails support

    C )根據不同的工程地質和施工條件,優選懸臂支護樁、單層錨桿支護樁、土釘支護系列中的一種支護方案。
  12. Considering the difference of geological condition and construction condition, the thesis select the best form to save the money and make the work in security. a ) the pile support : according cantilever supporting pile, one - anchored supporting pile, the thesis compile a series of program with the method of criterion

    本文針對黃土地區懸臂支護樁、單層錨桿支護樁、土釘支護等不同的支護方案,優選了支護方法和結構形式,考慮了不同的地質條件和施工條件情況下,採用相應較合理的支護方案以達到安全可靠和經濟的目的。
  13. Through these studies and analysis, following conclusions could be drawn : ( 1 ) it is necessary to study on harness engineering of landslide and dangerous rock since the main representations of this geological hazard are landslide and dangerous rock through geological investigation ; ( 2 ) it can be concluded though stability analysis that the dingzhuang landslide is stable naturally, which is identical to the in - situ investigation ; ( 3 ) through stability analysis, the landslide would slide if the water level dropped down from 175. 10m to 156. 0m and it rained successively after the three gorges reservoir work. ( 4 ) according to the results of calculation and the characteristic of the landslide, it is suggested that such measures as unloading at upper part, anchorage and pile supporting system and drainage system should be used on the landslide. ( 5 ) according to geological investigation, there are three kinds of dangerous rock in the engineering, those are failing - down rock, collapsing rock and sliding rock

    因此有必要對滑坡進行治理; ( 4 )根據滑坡推力計算結果和本滑坡屬牽引式滑坡的特點,滑坡體上部相對較穩定,中下部處于基本穩定或不穩定狀態,因此建議此滑坡治理採用上部削坡減載與錨拉抗滑樁、擋墻進行支擋結合的處理方法,同時結合截排水等措施進行綜合治理; ( 5 )根據地勘資料,通過對危巖體的形態、規模、基座和底界層及分佈特點和分析,將本工程危巖體失穩崩塌的方式歸納為墜落式、傾倒式和滑塌式三種類型並分別提出相應的穩定性計算方法; ( 6 )分別對本工程中的危巖體進行了穩定性計算,並且發現其都處于不穩定狀態,因此根據實際情況分別提出相應襯砌支撐和清理等加固治理措施,最後還對加固后的危巖體進行了校核計算,滿足要求。
  14. Thickness of supporting layer and depth of pile in the rock are two important aspects considered in pile design in karst area

    巖溶地區基樁的持力層頂板厚度和嵌巖深度問題,是樁基設計時考慮的重要方面。
  15. Design and application of concrete grout pile with extrusion and ex tension supporting tray

    擠擴支盤混凝土灌注樁的設計與應用
  16. Application of the drill superfluid concrete pile for supporting in a deep foundation ditch

    鉆孔壓灌超流態混凝土樁在深基坑支護中的應用
  17. Furthermore, the pressure of soil can be exerted on anchor boards, so the stressed anchor can balance the pressure of soi1 through the anchoring. before the trench displaces, the anchoring pressure begins to work through the exertion of pre - stress. meanwhile, the stress pressure of anchor changes and is adjusted through shot concrete and its stressed steel. so the whole supporting system, which is similar with the pile - anchor supporting system, is finally formed, and it can limit the displacement of trenches

    錨桿的錨固力在基坑出現位移前,通過雨應力的施加即得以發揮作用,錨桿的受應生變化並通過噴射硅及其中的受力筋得以調整,從而形成一個與樁一錨結構近似的整體支護系統,起到限制基坑位移的作用。
  18. According to test results, author analyses deformation characters and its rules of prestress anchor cable composite soil nail supporting and pile anchor composite soil nail supporting, studies work mechanism of prestress anchor cable composite soil nail supporting structure, explores change regularity of inner force of soil

    三、對預應力錨索復合土釘支護結構進行了大量全方位的現場原位測試試驗。根據試驗測試結果來研究分析預應力錨索復合土釘支護結構和樁錨式復合土釘支護結構的變形特徵及規律。
  19. The distance between routine piles foundation is oversized in order to use soil ' s supporting capacity and think over the pile - soil ' s combined supporting capacity. this pile foundation is called composite pile foundation

    為了發揮樁間土的承載能力,考慮樁土共同承擔荷載,常規樁基的樁距被加大,這種樁基稱為復合樁基。
  20. According the data of actual project and integrating the approximately earth pressure of loess area, this thesis compile a series of lanzhou loess area support program with c + + and the method of criterion. analyzed and calculated many actual projects with the program, monitoring the procedure and collecting the data in some works to perfect the program and work hard to make it to sale. according cantilever supporting pile, one - anchored supporting pile and soil nails support of loess area, this thesis select the best support method and structure form

    本文從實際工程出發,根據規范中的極限荷載設計法結合黃土地區深基坑的近似實際土壓力分佈情況,用c + +語言編制一套適合蘭州地區黃土深基坑支護的計算機輔助設計程序,用本程序分析計算了多個實際工程,並在這些實際工程的基坑開挖過程中實行信息監測,收集有關數據以回歸檢驗研究成果以及完善這套程序,使其能真正的應用到實際工程,并力爭使其商品化。
分享友人