survey control 中文意思是什麼

survey control 解釋
測量控制
  • survey : vt 1 眺望,俯瞰,環顧。2 審視;通盤考慮[考察],觀察(形勢);概括,綜合評述。3 測量(土地),勘查...
  • control : n 1 支配,管理,管制,統制,控制;監督。2 抑制(力);壓制,節制,拘束;【農業】防治。3 檢查;核...
  1. During construction of donghai bridge of yangshan deep - water port, bedrock bench mark, which is an important surveying datum mark, played an important part in control survey and elevation transmission

    摘要基巖標是重要的測量基準設施,在洋山深水港東海大橋的工程建設中發揮了控制測量與高程傳遞的重要作用。
  2. Based on the situation of demand exceeds supply in the market, the author would like to find out the constraints of the water chestnut development by use of pra ( participatory rural appraisal ) in a survey to carry out stakeholder analysis including the water chestnut farmers, government and processing companies. also, the author applied a tool of system theory to analyze the constraints of water chestnut plant production development. the results are as following : the study shows that a main factor that restricts the plant yield ( per unit yield ) and quality ( product quality ) of water chestnut is the low level of prevention and control of water chestnut culms damping - off ; a disease of the water chestnut

    針對賀州市荸薺產業發展中的「銷大於產」的突出矛盾,筆者通過運用pra (參與式農村評估)方法,對荸薺種植區的農戶、政府機構、加工流通企業等進行了調查研究,並運用系統科學的方法對荸薺種植系統的不同組成因子的制約因素進行分析,得出研究結論如下:農戶對荸薺稈枯病害的綜合防治水平偏低,制約其荸薺種植的產量(單產)和質量(商品質量) 。
  3. Fourth, the paper treats two kinds of hoisting projects of high alititude construction in bulk and member assembly, hositing machine and plan layout, setting up scaffold and joints, and installing trunks, branches and joints etc. then in detail discusses the method which applys total station to measure three - dimensional coordinate of dendriform structure, including selecting survey sign points, creating survey system and converting survey coordinate system etc. the paper also deep research on the welding performance, welding method, welding process, welding stress and control, welding strain and rectification, weld defects analysis and weld quality inspection, and so on complicated heterogeneity steel weld proplems

    接著系統的論述了高空散裝法和分單元安裝法兩種樹狀結構吊裝方案,樹狀結構吊裝機械及平面布置,樹狀結構胎架及節點的搭設,以及樹狀結構樹干、樹枝和節點的吊裝工藝等諸多工藝問題。詳細的論述了採用全站儀對樹狀結構進行空間三維坐標測量的方法,包括測量標志點的選取、測量系統的建立及測量坐標的轉換等問題。深入地研究了樹狀結構可焊性、焊接方法、焊接工藝、焊接應力及控制、焊接變形及矯正、焊接缺陷分析及焊接質量檢查等復雜的異種鋼焊接問題。
  4. Practice of survey of flood control engineering in qujiang county

    曲江縣城防洪工程測量實踐
  5. The world health organisation scientist in vector control, dr chang moh - seng, accompanied by the director, visits ma wan to examine the ovitrap survey

    世界?生組織病媒防治科學家曾茂成博士訪港,在署長陪同下,實地視察馬灣誘蚊產卵指數調查。
  6. According to this idea, this paper first introduces the basic technology to design the instrument. it includes the theory of the laser, measures to survey distance with laser, the theory of the step - motor, subsection technology of the step - motor, the working theory of the single - chip, expansion of the single - chip orderly. the following are the design of the control system of the planimeter according to the principle of the context. it consists of two parts

    最後根據前文介紹的知識先對單片機控制系統進行了硬體電路框圖設計,依據夠用原則對元器件、設備的選擇進行計算、說明、選定,使系統成為擁有完整的包括a d採集、數據存儲器、 8155擴展的鍵盤顯示、 p1口及8155的pa口輸出控制的單片機硬體控制系統電路。
  7. Based on the terszige and biot theory, initially analyze the economical of this experiment, directly save investment 22 % after compute. after that, computing the settlement of highway foundation, comparing the computing and survey value, the predict formula of vacuum - heaped load combining precompression for designing, this formula show that the distortion law of consolidation progress. at the same time, based on the position and room experiment, analyzes the intension transformation in soft soil and criteria of stabilization control

    在太沙基和比奧固結理論的基礎上,先分析了此次試驗的經濟性,經核算直接節約投資22 ,經濟效益十分明顯;隨后對真空堆載聯合預壓法加固軟土路基的沉降量進行了估算,並與實測值作對比分析,得出了真空堆載聯合預壓下的沉降量估算公式,能反映「真空」加固過程的變化規律;同時根據現場和室內試驗,分析了軟土強度的變化,以及給出並驗證了工后沉降控制標準。
  8. Usually for a precise survey control points are established by triangulation.

    通常對于精確的測量,控制點是根據三角網來定位的。
  9. This text more and more psychological problems such as envy, wilful, unsociable and eccentricking, against returning to psychology and even committing suicide, crime, etc. to teenagers student, adopt new student carry on psychological general survey, set up student psychological consultation room, good sports study psychology person who educate method and means when entering school, improve all students ' psychological quality, develop its psychological latent energy, strengthen adaptive capacity, prevent, rescue student psychological problem behavior, facilitate student in life take care of oneself, examine oneself, automatic control at the psychology from law, appraisal in the action, emotion happy, promote perfecting development of student ' s personality finally

    本文針對青少年學生越來越多的心理問題如嫉妒、任性、孤僻、逆返心理乃至自殺、犯罪等,採用新生入學時進行心理普測、設立學生心理咨詢室、良好的體育學習心理教育等方法和手段,提高全體學生的心理素質,開發其心理潛能,增強適應能力,預防、矯治學生心理問題行為,促成學生生活上自理、行動上自律、評價上自省、心態上自控、情感上自悅,最終促進學生人格的健全發展。
  10. According to the characters of the vibration of internal combustion engine and on bases of the theory of active vibrantion control which is carefully analyzed, the corresponding mathematical model suitable for the vibration of internal combustion engine is developed and the fuzzy control techniques are adopted. a new active vibration control system is developed w hich conclude mcu, the key part, and the equipment used to survey the vibrative acceleration of internal combustion engine

    本文根據內燃機振動的具體特點,在仔細分析了振動主動控制原理的基礎上,建立了適合內燃機整機振動的數學模型和採用了模糊控制方法,提出了一種新的內燃機整機振動主動控制減振系統,該系統以微控制器為核心,配以測加速度和控制機電轉換執行機構組成。
  11. According to the engineering practice, the theoretical basis and method that survey directly the horizontal distance and height difference by the total station system as fourth grade and below fourth grade control network are put forward instead of surveying slant distance and zenith distance

    摘要根據工程實踐,提出了用全站儀直接測量平距、高差來代替測斜距、天頂距作四等及四等以下控制網測量的理論依據和方法,並以張河灣抽水蓄能電站施工控制網為例進行了比較計算。
  12. We could have it as the foundation for the aerial survey camera redesign. the performance of the collectivity is analysed finally, the effect of forward motion compensation is estimated. the equivalent residual image motion of the compensation control system is very small

    最後,本人利用tms320f240dsp處理器的部分資源,對前向運動補償控制系統的軟體實現方法進行了研究和探討,取得了較為滿意的控制效果,為今後航空攝影機電控系統的設計工作打下了基礎。
  13. The paper introduces the construction technique and quality control of the concrete ground container, the project uses the small machine - constructing method which vibrates beam and the vibrating spear unify, through example of key working procedure : the construction survey, the ground basic roller compaction, two ash zone constructions, the steel bar construction, the template construction, the concrete surface layer construction craft and the quality control, the small machine construction method prove to meet the project needs

    摘要介紹了混凝土集裝箱堆場施工工藝與質量控制,工程採用振動梁和振動棒相結合的小型機械法施工,通過對關鍵工序如:施工測量、場區基層碾壓、二灰層施工、鋼筋施工、模板施工、混凝土面層的施工工藝與質量控制,表明小型機械法施工能滿足工程需要,工程完成後符合驗收標準,滿足了業主的使用要求,對于同類工程的施工具有借鑒意義。
  14. The content in this paper comes from chinese academy of sciences second innovation item named the technical study in fine tracking system with high bandwidth inferior servo control and fast - steering mirror, includes several parts below : firstly, this paper introduces a survey of fast - steering mirror development at home and abroad, analyzes the mechanical structure and function of some foreign shaftless reflectors and some domestic axiferous reflectors, explains at some length the formation theory of the fsm, puts forward a specific design proposal of shaftless fast - steering mirror

    介紹了國內外快速控制反射鏡的發展概況。通過分析幾種國外反射鏡及國內有軸系反射鏡的機械結構及性能,對快速控制反射鏡的組成原理做了詳細的闡述,提出了一種柔性軸快速控制反射鏡的具體設計方案。
  15. This is the fourth of such surveys undertaken biennially since 1999, basically to monitor and establish the cross - boundary travel trends. the survey will be undertaken at all cross - boundary control points

    今次已經是自1999年起第四度每兩年進行一次的同類調查,主要是為了監察和確定跨界旅運的趨勢。
  16. Through analyzing the structure of open caisson, and according to sinking stress principle, the paper introduced in the open caisson construction process sinking, correcting error, survey control as well as peculiar circumstance processing technical measure, such as in open caisson construction the inner - mold for sanding, framework supporting and steel binding, and concrete casting ; in open caisson sinking - control the sand in edge foot inner - mold, sand - pumping sinking, and pressure hydraulic monitor breaking and pressure - blowing sinking by air pressure blower etc

    摘要根據下沉受力原理,分析了沉井結構,介紹了沉井施工過程中的下沉、糾偏、測量控制以及特殊情況處理的技術措施,如沉井製作中的填沙內模,模板支設和鋼筋綁扎,混凝土澆注;沉井下沉控制中的刃腳內模沙土,抽沙泵抽沙下沉,高壓水槍破壓、空壓機吹壓下沉等。
  17. Survey control network

    測量控制網路
  18. The survey control networks provide the essential reference points for all types of land and engineering surveys

    測量控制網路為各類土地及工程測量提供必需的參考點。
  19. A geodetic survey information system has been set up to facilitate the co - ordination and dissemination of survey control information. the office produces a variety of maps

    該處收錄的?星訊號數據,可供市民使用,並且設立了大地信息系統,利便測量控制信息的協調及發布。
  20. The survey and mapping office of the lands department defines the boundaries of land developments, establishes and maintains survey control networks, produces maps of hong kong at various scales and themes for land administration, engineering and legal purposes, and manages a computerised land information system

    地政總署的測繪處界定土地發展的界線,設立及管理測量控制網路,繪制各種比例和不同主題的香港地圖,供土地管理、工程和法律用途,同時又負責管理一個電腦化的土地信息系統。
分享友人