take charge of a project 中文意思是什麼

take charge of a project 解釋
掌管一項工程
  • take : vt (took; taken )1 (用手)拿,取,抓,握,捕,捉,逮捕;俘虜;攻取,占領;【牌戲】吃掉,勝過。...
  • charge : vt 1 填;裝(子彈);充(電);使飽和;使充滿;堆積,裝載。2 命令;促;諭示,指令。3 責備;告誡。...
  • of : OF =Old French 古法語。
  • a : an 用在以母音音素開始的詞前〉 indefinite art 1 〈普通可數名詞第一次提到時,冠以不定冠詞主要表示類...
  • project : vt 1 投擲,拋出;發射(炮彈等);噴射。2 使突出,使凸出。3 設計,規劃,計劃,打算,籌劃。4 投影;...
  1. Our company has provided the security for this project for 2 years, at present park area have four neighborhoods centers ( expensive all, east shi dou, new city, lake and so on neighborhood centers ), our company takes charge of after to take over control this project, beforehand existence vehicles burglary phenomenon drops obviously, and captures the burglary member many times, retrieves a loss for the general customers to gain the high praise from customers. the item dispatches 40 security

    本公司已為該項目提供保安服務2年,目前園區四個鄰里中心(貴都、師惠、新城、湖東等鄰里中心) ,我司在接管該項目后,以前存在的車輛盜竊現象明顯下降,並多次抓獲盜竊分子,為廣大顧客挽回損失,並得到業主和顧客的高度表揚;該項目共配備保安40名。
  2. Finished the following important consulting projects in recent years : ( 1 ) to take charge of and participate in the design of the project of 25 thousand - ton petrol and gas quays of the jiangyin petrol company. ( 2 ) to take charge of and parricipate in the design of the project of 25 thousand - ton petrol and gas quays of zhang jia gang hada company. ( 3 ) to organize the feasibility study on the coastal engineering test hall construction project of nhri. to take charge of and participate in the design of the hall ( a large - size wave basin, 70m long and 50m wide. was constructed in it ). ( 4 ) to organize the project feasibility study of the laboratory of nhri for the basic law research on sediment transport, to take charge of the design of the project, and to participate in the design of the wind and wave flume ( 180m long ), in which the scientific research projects of waterway training works and coastal engineering structures can be carried out under the combined action of wind, wave and current

    近幾年來主要完成以下幾項重大工程: 1 .主持並參與江陰石油公司2 . 5萬噸級油氣碼頭的設計; 2 .主持並參與張家港哈德公司2 . 5萬噸級油氣碼頭的設計; 3 .編寫了南京水科院海岸工程試驗廳可行性研究報告,主持並參與該試驗廳的工程設計,在該試驗廳內建有70米長50米寬的大型波浪水池; 4 .編寫了南京水科院「泥沙運動基本規律研究實驗室」工程可行性研究報告,並主持該項工程設計,參與完成180米長風浪水槽設計,該水槽建成后,可在風、浪、流綜合作用下進行航道整治和海岸工程的科學研究。
  3. Whereas dealerships service management experience is out of date, no transparent service charge, unreasonable allocation of staff wages and salaries and the workshop resources, time control management system is a project that can take every repair item as a unit, to calculate the service time accurately

    現代項目管理已成為一種系統的管理理論和技術。我們應用項目管理的理論和技術為奧迪特許經銷商開發「維修工時管理系統」 。一汽大眾為經銷商提供包括技術,軟體,管理模式的支持。
  4. To meet the extremely tight schedule and enormous scale of the project, experts from four mainland provincial institutes, namely hebei provincial institute of cultural relics, henan provincial institute of cultural relics and archaeology, shaanxi archaeology institute, and institute of cultural relics and archaeology of guangzhou were invited to form a joint archaeological team to take charge of the rescue excavation

    由於工程迫切和發掘規模較大,本處邀請了河北省文物研究所、河南省文物考古研究所、陜西省考古研究所及廣州市文物考古研究所四個考古機構,組成聯合考古隊進行搶救發掘。
  5. In short, my suggestion is to let a foundation or board of directors formed by members of the arts community take charge of the development and operation of the whole cultural district project. more importantly, the assessment process must be transparent and involve representatives of the arts community who should keep things confidential if requested

    總括而言,建議應由藝術界所組成的基金會或董事會負責發展及營運整個藝術區,更重要的是,審批標書的小組必須有藝術界中有廣泛代表性的人士參與,審批過程亦必須具透明度,保密的要求可要求藝術界人士遵守。
  6. As a member of project group leaded by my supervisor, i take charge of diagnosing the current situation of employee performance management in citc corporation and designing a new employee performance management system

    筆者作為導師帶領下的項目小組成員,負責對citc公司員工績效管理現狀進行診斷,在此基礎上設計出citc公司員工績效管理系統。
分享友人