tank station 中文意思是什麼

tank station 解釋
給水站。

  • tank : n 1 罐,槽;箱;櫃〈盛液體或氣體的大容器〉;(火車頭的)水櫃;(船上的)液體艙;〈美、英方〉水堰...
  • station : n 1 站,臺,車站;航空站,機場。2 派出所;署,局,所。3 【無線電】電臺,電視臺。 4 駐地,部戍地,...
  1. Such as : the liner of coal bunker of power station, the lining of dust cyclone and classifying cyclone, the liner of chemical storage tank and warehouse for corrosion material, the floor material for chemical plants and low friction vehicle testing surface etc

    玄武巖鑄石板主要用於襯砌火電廠煤倉,各種規格旋風器,鋪設各類化工廠地面,汽車剎車試驗場地面等,也用於襯砌酸洗槽或儲存腐蝕性物品的貯存室。
  2. The cast basalt tiles may be used in all kinds of ways. such as : the liner of coal bunker of power station, the lining of dust cyclone, the liner of chemical storage tank and warehouse for corrosion material, the floor material for chemical plants and lowfriction vehicle testing surface etc

    玄武巖鑄石板主要用於襯砌火電廠煤倉,各種規格旋風除塵器、旋流器、鋪設各類化工廠地面,汽車剎車試驗場地面等,也可用於襯砌酸洗槽或儲存腐蝕性物品的貯存室。
  3. The following are the large projects undertaking by haifeng company : crude oil electricity plant project of north china oil field hydroelectricity factory, apartment ( 22 stories ) of yuanda real estate company of dalian shipping group, helios hotel of helios group in dalian development zone, tilt aqueduct bridge of shanxi hongqi reservoir ( total span : 267m ), supply and sale building and city construction building ( both are antique architectures ) of shanxi heyang city, sea drainage pipe of hainan fudao fertilizer factory ( 1520 ), 8 oilgas docks of hainan haiyan oilgas company, basha condensable gas transfer station of haiyan company, 10, 000m3 oilgas storage tank of arco company ( usa ) in hainan nanshan, gas pipe and fuel gas installation project of hainan nanshan electricity co., ltd, base and accessory project of hainan gas company, bei da huang cereal and oil market in harerbin, hainan cross island pipe, changhuajiang river pipe crossing project, taihangshan mountain earthwork project ( the 19th section of west - to - east gas transmission project )

    海南海峰公司承建大的工程項目:華北油田水電廠原油發電站工程;大連船泊集團遠達地產公司的遠達公寓( 22層) ;大連開發區香港太陽神集團的太陽神大酒店;陜西紅旗水庫斜拉渡槽工程(全跨267m ) ;陜西合陽供銷大樓及城建大樓(均為仿古) ;海南富島化肥廠排海管線( 1520 ) ;海南海燕油氣公司八所油氣碼頭;海燕公司白沙液化氣中轉站;海南南山美國阿科公司儲油氣萬立米大罐工程;海南南山電力股份有限公司天然氣管線及燃氣安裝工程;海南南海天然氣有限公司基地及配套工程;哈爾濱北大荒糧油批發市場;海南環島管線;昌化江穿越工程;西氣東輸十九標段,太行山土石方工程。
  4. Problems for outsize water tank of sewage disposal station during the course of construction supervision

    污水處理站特大水池施工監理過程中的問題
  5. Interfaces of tank systems - petrol station interface - part 3 : price sign

    油罐系統介面.加油站介面.第3部分:價標
  6. Foshan nanhai chemical machinery factory the product series : storage tank, heat exchangers, reactor, tower, spin and dyeing equipment, environmental protection and sterilizing equipment, food and pharmacy equipment etc. which are wedely used in petroieum, chemical industry, fine chemical, food, medicine, spin and dye, metallurgy, mining, sullage processing, oil station etc. the product sells toward whoie country

    佛山市南海化工機械廠產品系列有:儲罐、換熱器、反應釜、塔類容器、紡織印染設備、環境保護殺菌設備、食品制藥設備等,廣泛應用於石油化工、精細化工、輕工食品、制藥、紡織印染、冶金礦山、污水處理、加油站等行業,產品銷往全國各地。
  7. 2. based on the results of experimental data of the tailrace surge tank of yi xing pumped - storage station in jiangsu province, this research investigates the methods for the head loss coefficients of throttled surge tank with linking pipe by means of the method which incorporates experimental results with theoretical analysis

    結合江蘇宜興抽水蓄能電站尾水調壓室水力模型試驗成果,採用理論計算與模型試驗結果相結合的方法,對有連接管的阻抗式調壓室局部水頭損失系數的計算方法進行了討論。
  8. In two deep well anode ground beds at tank zone of yizheng pump station, metal oxide is used as an anode material and obtains good results

    在儀征泵站罐區的2口深井陽極地床中,採用金屬氧化物作為陽極材料,取得了較好的效果。
  9. The construction includes 31 buildings, including administration building, maintenance factory, wheel - cutting factory, signals and telecommunication facility control room, machinery and electricity equipment factory, etc. furthermore, there are also several kinds of equipments facility : such as, oil tank, gasoline station, automobile - washing factory, way dregs storage area, way dregs loading machine shelter, water discharge channel, wasted water pipe line and scenic spots facility, etc

    工程內容包含有31棟建築物如行政綜合大樓檢驗修理廠車輪鏃削廠號志及通訊設備機房機電與工務設備廠等。另有各項設備施如:油槽加油站洗車廠道渣儲存區,道渣裝卸機棚排水溝渠污水管線景觀設施等。
  10. This included firstly the construction of a new reception tank and a pumping station at muk wu to strengthen the raw water reception capability. secondly, additional water mains were laid to strengthen the transfer between river indus pumping station with plover cove reservoir

    17億元改善東江供水計劃,第一部份在木湖興建一個新蓄水池及抽水站,加強輸入廣東省原水設備,第二部份是由梧桐河抽水站至船灣淡水湖興建輸水管,增加梧桐河抽水站抽水量。
  11. In this paper according to the design scheme of yao heba power station in nan yahe river, the mathematical model with longer and complicated conduit system, elastic water hammer and pid regulating low of voter turbine adjusting system in the case of the small fluctuation has being built, which include conduit system, surge tank, draft tube, water turbine, generator and governor. the hydraulic losses are taken into account, and nonlinearization in water turbine and the governor is also taken into account

    本文根據南椏河姚河壩水電站的設計方案,對水輪機調節系統,按長引水管道復雜引水系統、彈性水擊、調速器為pid調節規律,在小波動情況下,對包括引水道、調壓井、尾水管、水輪機、發電機、調速器在內的水輪機調節系統建立數學模型,並計及引水管道水力摩阻損失,對水輪機、調速器考慮了其中的非線性,利用功能強大的matlab軟體編制了源程序進行計算機模擬計算。
  12. Test research of diversion water channel and front tank of number 2 middle - line sewage pump station in shanghai

    上海中線2號污水泵站引水渠道和前池的試驗研究
  13. Five floating roof oil tanks with volume 2 104m3 are designed to be constructed at shuguang pump station possessed by liaohe oil field, which is located at liaohe delta alluvial plain. this engineering filed is featured with complicated topography. the oil tank foundation soil is horizontally - layered, including four layers : medium dense - dense clay, interbedding of find sand and clay, fine sand sandwiching clay and fine sand

    位於遼河三角洲沖積平原的遼河油田曙光泵站計劃增建5座2 10 ~ 4m ~ 3浮頂式儲油罐,場區地形復雜,油罐地基土層分佈均勻水平,從上之下主要由中密粉土層、粉細砂與粘土互層、粉細砂夾粘土層和細砂層等4層組成。
  14. Based on this method, design the system oil circuit and constant - pressure hydraulic power station as well as the hydraulic manifold block, measuring platform, electrical cabinet and reclaiming oil tank

    在此油源方案的基礎上,設計出測量系統油路、油源泵站系統,同時進行了液壓集成塊、測量臺架、電氣控制櫃和漏油回收油箱的設計。
  15. Uses the large fuel tank to design, and can reduce temperature rise, and raise the hydraulic pressure system reliability, the hydraulic pressure station can inside inlays in the work table, fully economizes the work space

    採用大油箱設計,可減少溫升,提高液壓系統可靠性,液壓站可內嵌于工作桌內,充分節省工作空間。 jm6d採用臥式結構配以專用鉚接工作桌,外形美觀,工作穩定。
  16. For the sake of the research about hydroelectric interfere among machines, the article utilized the simulink in matlab as simulating tool, meanwhile established the simulating model about two high head diversion water turbines regulation system in violent fluctuating pressure sharing one head race tunnel and surge tank and one penstock. then calculated the load rejection transition process by means of the real parameters of a hydro power station, analysed the interfere of hydro power station safety and stable nenring brought by hydroelectric interfere and put forward a series of measures that lightening the hydroelectric interfere

    為了研究機組間的水力干擾,本文採用matlab下的simulink作為模擬工具,建立共用有壓引水管道、調壓井、壓力主管的兩臺高水頭引水式水輪機調節系統大波動時的模擬模型,引入實際電站的參數,對甩負荷過渡過程進行了模擬計算,分析水力干擾對電站安全、穩定運行所造成的影響,並提出了一系列減輕水力干擾的措施。
  17. On the base of the popular short - term hydrologic forecast models, xin ' anjiang model, the sacramento model and the tank model are used to simulate and analyze the rongjiang river basin and result are analyzed contrastively the second part : the economic running problems are studied in the water power station, and the newest results are used in the water power station in rongjiang river basin

    第一部分,探索了入庫徑流短期預報方法,在綜述了現行常用的短期水文預報模型的基礎上,分別用新安江模型、薩克模型和水箱模型對融江流域實際資料進行模擬計算。對模擬結果進行了比較分析。第二部分,水電站廠內經濟運行理論的實例應用研究,將相關最新研究成果應用於融江流域水電站。
  18. The papers and technical reports about the oil tank foundation treatment shows that in our country abundant experiences have been built up in dealing with the soft clay foundation, while there were few cases for sand foundation. analyzing the geological condition, the author proposed that the foundation soils at shuguang pump station belong to high - permeability sand layers

    根據曙光泵站地區的地質條件,論文認為該區主要是一套以高透水性的砂類土為主的地層,粘性土層較薄且富夾薄層粉細砂,地基土的水平向與垂直向排水條件良好。
  19. The ascertainment of surges in surge tank and waterhammer pressure in pipe systems is the key point of the design of surge tanks and the safe function of the water power station

    調壓室中的水位波動以及壓力管道水擊壓強的確定對調壓系統的正確設計和確保電站調壓系統的正常運行至關重要。
  20. Abstract : problems concerned with the design of booster - pumping station in residential quarters, including the design of water storage tank, selection and control of pumping assemblies etc are discussed

    文摘:就住宅小區給水加壓泵站設計的相關問題進行了介紹,包括貯水池設計、水泵的選擇與設置、控制方式等。
分享友人