  1. In the process of work, according to complex geological conditions such as huge thick soft clay in site and top surface of possible pile foundation supporting course fluctuating in large amplitude, we adopted many advanced exploratory methods ( just as high accuracy exploration of shallow earthquake, crosshole wave velocity test, vane shear test, pressuremeter test, etc. ), we found out that there is an ancient groove of yangzi river in former plant site, therefore we suggested in time that plant site should properly be moved eastwardly, only this item saved nearly about 50 million for pile foundation project cost

    在工作過程,根據廠址區軟粘土厚度大、可能作為樁基持力層頂面起伏變化大等復雜地質條件,採取了多種先進的勘探手段(如高精度淺層地震勘探、跨孔波速試驗、十字板剪切試驗、旁壓試驗等) ,查明了原廠址區存在一個長江古凹槽,並及時建議廠址適當東移,僅次一項就節省樁基工程費用近5000萬元。
  2. The seismic behavior of longitudinal middling - high r. c shear wall with frame column is discussed through model experimentations and finite element methods in this paper, after taking frame - shear wall structure of a main factory building of the large capacity power plant as experimentative prototype. the major work as follow : in order to appliance pseudo static test, the longitudinal middling - high r. c shear wall with frame column in the large capacity power plant ' s main factory building has been simulated to a model structure with 1 / 15 reduced - scale. the contents of study are process of cracking, course of damage, skeleton curve, rigidity degradation, ductility characteristic etc. that the seismic behavior of this kind of middling - high r. c shear wall is excellent has been proved by chubby hysteretic curve and fine capacity of energy dissipation

    本文以某大型火電廠主廠房縱向框架一剪力墻結構為原型,通過模型試驗和有限元分析,研究了縱向帶邊框柱中高剪力墻結構的抗震性能問題,主要內容有:選用1 15縮尺比把某大型火電廠主廠房縱向帶邊框柱剪力墻原型結構模擬為一個模型結構,並進行了偽靜力試驗,研究了這類縱向帶邊框柱中高剪力墻結構的開裂與破壞過程、骨架曲線、剛度退化、延性性能等問題,試驗滯回曲線飽滿,消能能力強,說明此類中高剪力墻的抗震性能較好。
  3. Put forward the emphasis of preparing work and trial run before a new built pet plant start - up, including working out the network plan, washing the equipment and pipe system, calibrating the plant, and making the leakage test, the linkage and feeding trial run

    摘要提出了新建聚酯裝置投產前工作準備和試車工作的要點,包括網路計劃的編制,設備及管道系統的清洗,裝置的標定,泄漏試驗,聯動試車及投料試車。
  4. Many gas - turbine & steam - turbine combined - cycle power plant ( ccpp ) have currently being constructed in china, and acceptance test of units in ccpp are one of important work in the engineering construction

    目前我國正在興建一批燃氣-蒸汽聯合循環電站,機組性能驗收工作是工程建設中的主要內容之一。