third liner 中文意思是什麼

third liner 解釋
三線股
  • third : n 1 〈the third〉第三。2 第三者〈指人〉。3 (時間或角度的)一秒的六十分之一。4 〈the third〉(某...
  • liner : n. 1. (固定航線的)定期班;班機。2. 畫線者。3. 畫線的工具。4. (棒球中的)直球,平球。n. 1. 制襯里[襯墊等]的人;裝襯里[襯墊等]的人。2. 襯里;【機械工程】襯墊,套圈,襯套。
  1. The dissertation is mainly including four section : the first is the experiments done in the tank, which will supply the reliable information of imaging data ; the second is image edge detection by the use of the art of the zernkie moments, which is used to detect the liner and threaded edge of the object, the third is the underwater camera calibration technique, the forth is automatic positioning the location of the camera by used of the art of cross - ratio, the result of which is satisfied

    本文工作分為四個部分:第一部分是水槽實驗部分,它為后續的工作提供了可靠的圖像數據信息;第二部分是基於zom距的直線、曲線邊緣提取技術及相關的與處理技術;第三部分,水下攝像機標定技術研究,基於改進的tsai演算法,採用逐步分解的標定策略。並探討了一種相對簡單的、靈活的標定技術;第四部分是攝像機定位技術研究,採用具有平移不變性的交比進行攝像機定位,模擬試驗的最大誤差不超過2 ,效果還是令人滿意的。
  2. 1. under the same kind of wall rock and the same condition, displacement of pipe liner is symmetry, for tunnel structure and suffered load are symmetry. as level terra stress is bigger, the maximum of displacement and the first main stress occur in tie - in of pipe liner structure, and its direction is radial and points in hole ; the direction of the third main stress is annular and its maximum occurs in top and bottom hole inner

    1 、同一類圍巖在同一種工況下,由於結構和荷載的對稱性,管片襯砌結構的位移也表現出對稱性,因水平向地應力較大,位移最大值、第一主應力的最大值發生在管片襯砌結構的接頭處,方向為徑向指向洞內;第三主應力的方向為環向,較大值發生在洞頂和洞底內側。
  3. 3. under different kinds of wall rock and the same condition, from ii iii v kinds of wall rock, and conditions of construction period and operation period, it gradually increases that the maximum of displacement and the first main stress third main stress of pipe liner structure

    3 、不同種類圍巖在相同的工況下,從、 、類圍巖看,不論是施工期還是運行期,管片襯砌結構的位移的最大值和第一主應力、第三主應力最大值都逐漸增大。
  4. 2. under the same kind of wall rock and different conditions, the maximum of displacement and the third main stress of pipe liner structure in construction period is bigger than these of operation period, and the maximum of the first main stress of pipe liner structure in construction period is smaller than these of operation period

    2 、同一類圍巖在不同工況下,施工期管片襯砌結構位移的最大值、第三主應力最大值比運行期要大,施工期的管片襯砌結構的第一主應力最大值比運行期要小。
  5. Second and third liner

    二三線股
  6. Markers, the third one - liner will print the lines inside all eight sets

    標記,那麼第三個一行程序將列印所有八組標記中的行。
分享友人