three-layer construction 中文意思是什麼

three-layer construction 解釋
三層結構
  • three : n. 1. 三個人[東西]。2. 三歲,三時。3. 【板球】3字型。
  • layer : n 1 放置者,鋪設者,計劃者。2 【賽馬】(一般)賭客。3 產卵的雞。4 【軍事】瞄準手。5 層;階層;地...
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. The hanging wall of sag extended in southeast direction, with the tulage fault being the boundary fault. yinggete - bagemaode metamorphic core complex developed adjacent to northwest of chagan sag, which evolved from late jurassic to cretaceous with three - layer construction style. the kinematics mechanism of metamorphic core complex and chagan sag is a simple shear model, chagan sag extended and faulted as the metamorphic core complex rised

    在查干凹陷西北側發育英格特?巴格毛德變質核雜巖帶,可能具有三層結構模式,其形成與演化時代為晚侏羅世末?白堊紀;該變質核雜巖與查干凹陷的運動學機制為統一的簡單剪切模式;在變質核雜巖隆升的同時,查干凹陷發生伸展斷陷。
  2. Yinggete - bagemaode metamorphic core complex belt with three - layer construction is put forward, which evolved from late jurassic to cretaceous. the extensional simple shear model of the chagan fault depression is established. the tectonic evolution and the dynamics character of chagan fault depression and its adjacent mesozoic - cenozoic basins are discussed : at the end of triassic continental orogeny increased crust thickness crust uplift and denudation were happened ; jurassic was a period of local partly extensional collapse of erogenic belt and cretaceous was a period of widely extensional collapse of postorogenic erogenic belt ; cenozoic was a period of the development of stable intracontinental depression with the character of long distant collision response and weaked compression flexure

    討論了查干凹陷及鄰區中-新生代盆地構造演化及其地球動力學特徵,三疊紀(印支期)為陸內造山作用與地殼增厚、隆升剝蝕階段;侏羅紀(燕山早期)為造山後造山帶的局部伸展垮塌階段;白堊紀(燕山晚期)為造山期后大規模伸展垮塌作用與伸展盆地的發育階段;新生代(喜山期)為遠距離碰撞效應與弱擠壓撓曲性質的穩定大陸內坳陷的發育階段。
  3. Three groups of six single layer construction, building common services for the outsourcing industry to undertake the modernization of buildings

    三組錯落有致的六大單體建築,共同構建為承接服務外包產業的現代化樓宇。
  4. Some significant results were obtained. 4. on the basis of statistical analysis, effect coefficients of the platform values and the characteristic periods for three kinds of soil layer construction were obtained by comparing them with those of norm profiles 5

    將不同土層結構的計算結果,按不同地震動輸入和場地類別分組統計,然後與其對應的不含軟夾層的正常剖面的計算結果進行比較,統計得到不同土層結構對反應譜平臺值和特徵周期的影響系數。
  5. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  6. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  7. The emphasis is, however, put upon the analysis of the solution and the objectives of the design, the techniques of general and detailed design of the system. the terminal server supporting to three - layer c / s structure of the microsoft is applied in the construction of the system. the terminal server can make the numerous customer to register the server togather, and just like working on the server at the same time

    該系統運用microsoft的terminalserver系統支持,實現了三層c s結構,使眾多的客戶端可以同時登錄到服務器上,彷彿同時在服務器上工作一樣;並解決了一些實際問題,如工程文件間傳參問題,讀取遠程客戶機軟驅數據文件問題;設計了四層安全認證模式,實現以個人的身份進行系統權限的分配;進行了與企業運營相關的優化,包括倉儲操作優化、裝配車優化等
  8. The static loading test for three group of testing piles of jiading power plant secend stage project are analyzed and studied in this thesis, and the practical applying of high - accurate data collector, technique of waterproof insulation and testing technique of burying in the body of pile are introduced also. the vertical and horizontal loading features of three group of piles of different kind and constructing technique in different earth layer at the pile point are analyzed and compared and summed up with basic integro - differential equation calculating the pile earth system load transmit, transforming principle of stress - deforming and pile body rating of burying electric measuring element. changing law of stress, and changing law of pile body shifting and bending for different testing piles under vertical and horizontal load are showed so that the loading features of soil layer and pile at testing spot, reliable design data for pile type and base for scientific construction technique are provided

    本文僅就嘉定電廠二期工程中的三根試驗樁的靜載試驗進行了分析和研究,利用樁土體系荷載傳遞分析計算的基本微分方程及應力-應變轉換原理,結合預埋電測元件的樁身率定,對三組不同種類、不同施工工藝、不同持力層中的樁的豎直、水平承載特性進行了分析、比較和歸納,通過大量、全面的實測數據,經過整理、轉換和推演,揭示了不同試驗樁在豎直、水平荷載作用下的應力變化規律和樁身變位、撓曲變化規律,最終提供試驗場地土層和樁的承載特性,為該工程合理設計樁型提供了可靠的設計參數,為確定科學的施工工藝提供了有力的依據。
  9. For reducing cost and accelerating construction speed sparingly, at present in irrigation works construct in producing testing progressively and antiabrasion layer that popularize excavating method competent to split law in advance, flexible cushion layer etc. accumulative charge to vertical hole has been tested in three gorege project only

    為了節省施工成本、加快施工進度,目前在水利工程施工生產中逐步試驗並推廣的保護層開挖方法有水平預裂法,柔性墊層法等。對於垂直孔水平聚能藥包爆破用於生產試驗僅在三峽進行過。
  10. At last, i figure out the emphasis in this paper. i put forward a system construction based on corba / web in chapter two, and state its advantage and necessity after discussing the old - fashion system construction : single - layer, c / s and three - layer. finally, i do an example of document query and express its application in practice

    在探討了以往單層體系結構、客戶機服務器結構和傳統的三層體系結構后,提出了構件webla式的體系結構,詳細論述了這種結構在分佈異構網路環境下實施軟體開發的優點和必要性,最後,以一個具體的文檔查詢系統為例,說明這種體系結構在軟體開發中的實際應用。
  11. And the model of inside cooperative whole type behavior modeling is established. after that we analyzed whole modeling process and whole modeling process is divided into three level of structure, namely entity construction layer, state layer and constraints layer

    接著對整個建模過程進行了分析,把整個建模過程分為三個層次,即結構層,狀態層和約束層,分別建立了實體結構模型、狀態模型和約束模型。
  12. Fwd, benkelman beam and plate bearing tests were conducted on subgrade layer, subbase layer, base layer and surface layer of one selected pavement during construction in 1998. correlations between defections measured by three different test devices have been established through deflections comparison and analysis

    為了研究貝克曼梁、承載板和fwd三種彎沉檢測設備在路面彎沉檢測上的相關性,我們在選定的試驗路段上進行了彎沉檢測對比試驗。
  13. 3. for three kinds of different soil layer construction, the characters of the platform values and the characteristic periods of ground surface acceleration response spectra were studied

    3系統地研究了軟夾層在底部、中部和頂部的三種土層結構的反應譜平臺值和特徵周期的主要特徵。
  14. The grid is a set of newly technique that be constructed on the internet, it merges high - speed internet, high performance calculator, large database, sensors, the long range equipments into a whole, and provide more resource, functions and alternations to technological personnel and ordinary user. there are three principles to measure whether a system can be called grid or not, 1 ) coordinates resources that are not subject to centralized control ; 2 ) using standard, open, general - purpose protocols and interfaces ; 3 ) to deliver nontrivial qualities of service. a system which strictly meet the above three principles can be called grid. rid architecture includes the fabric layer - - local resources interfaces ; connectivity layer - - manage communications ; resource layer - - sharing a single resource ; pool layer - - correspond resources ; application layer ? self - definition grid application. it defined the basic construction of grid, the function and purpose of the architecture, and how to alternate these components do. in the domestic and international grid research and applied realm, digital libraries have played a pivotal role

    作者在對數字圖書館網格信息資源和非網格信息資源比較的基礎上,論述了一個異構信息同構化集成的跨庫檢索的方法;構建了網格環境下數字圖書館信息資源管理和信息資源組織的概念模型,並對其中的四個主要步驟進行了論述,包括信息資源描述、信息資源發現、信息資源發布和信息資源命名;論述了元數據在dl網格信息資源組織中的應用,及基於元數據的dl網格信息資源組織的原則;其後對數字圖書館網格信息資源調度和本地資源調度的進行了比較,簡述了數字圖書館網格信息資源調度的目的和作用;對數字圖書館內容分發網路和內容分發網格進行論述和比較;最後提出在內容分發網格的基礎上,融入數字圖書館自身的特點,構架出數字圖書館內容分發(調度)網格的層次架構。
分享友人