time limit control 中文意思是什麼

time limit control 解釋
限時控制
  • time : n 1 時,時間,時日,歲月。2 時候,時刻;期間;時節,季節;〈常pl 〉時期,年代,時代; 〈the time ...
  • limit : n. 1. 界限,界線;邊界。2. 極限,限度;限制。3. 〈pl. 〉范圍,范域。4. 限價;限額;賭注限額;獵物限額。vt. 1. 限制,限定。2. 減少。adj. -able
  • control : n 1 支配,管理,管制,統制,控制;監督。2 抑制(力);壓制,節制,拘束;【農業】防治。3 檢查;核...
  1. Concretely, it is creditor ' s right from the angle of request of company ' s performing obligation ; it is expectant right from the realization of right ; it is option from the content of exercising right. simultaneously, eso has the characters of right, profitability, time limit and nonnegotiable. eso system is not an arrange for system of property right but a long term incentive mechanism, because the aim of enterprise executive is not property of enterprise but rich profit by exercising their right, that is the value of eso for senior manager is not to control company but to acquire profit from the price difference

    第一部分分析了股票期權和股票期權制度的含義,指出股票期權的性質從不同角度分析可以認定為債權、期待權、選擇權,具體而言,從需權利人請求公司履行義務的角度它是一種債權,從權利實現的角度它是一種期待權,從權利行使內容的角度它是一種選擇權,同時它具有權利性、收益性、時限性、非流通性等特點;股票期權制度是一種長期激勵制度而非產權制度安排,因為企業經營者的目標是通過行使權利獲得豐厚收益,而非企業的所有權,即該制度對高級管理人員的最大價值是獲得差價利潤而不是控制公司。
  2. In this thesis, the traditional windage analytical method that comparing the actual cost with the planning cost can not control the implementary course of project, an effective project management and control technique which is very popular in nowadays is used for reference - - earned value method basing on performance analyzing, the main aim is to use the earned value exponential to analyze the fluctuant complexion of the time limit and cost for a project, and all the influences made by the fluctuant complexion, and the developing trend of the time limit and cost for a project

    本文提出了傳統的用實際發生成本與計劃成本進行比較,來衡量項目進展情況的偏差分析法不能全面地監控項目實施過程,借鑒了在目前項目管理實踐當中被普遍採用的一種有效的項目管理和控制技術:基於績效分析的掙值法,其根本目的是要使用該掙值指數分析項目工期和項目成本各自出現的變動情況、這些變動所造成的相互影響、項目工期與項目成本的未來發展趨勢。
  3. In case where violation of requirements in the consent document for planning affects flood control but remedies can be taken, the violator shall be ordered to take remedies within a time limit and may be concurrently fined not less than rmb 10, 000 yuan and not more than rmb 100, 000 yuan

    第五十五條違反本法第十九條規定,未按照規劃治導線整治河道和修建控制引導河水流向、保護堤岸等工程,影響防洪的,責令停止違法行為,恢復原狀或者採取其他補救措施,可以處一萬元以上十萬元以下的罰款。
  4. Article 25 public security fire control institutions, when finding out hidden fire danger, shall inform relevant units or individuals in time to take measures and order to remove the hidden danger within a time limit

    第二十五條公安消防機構發現火災隱患,應當及時通知有關單位或者個人採取措施,限時消除隱患。
  5. Article 26 for those bridges, approaches, wharves and other engineering structures across a river which seriously intercept or block water, the water conservancy administrative department concerned may, according to the flood control standards, report to the people ' s government at or above the county level that will, within the scope of powers provided by the state council, order the construction unit to rebuild or dismantle them within a time limit

    第二十六條對壅水、阻水嚴重的橋梁、引道、碼頭和其他跨河工程設施,根據防洪標準,有關水行政主管部門可以報請縣級以上人民政府按照國務院規定的權限責令建設單位限期改建或者拆除。
  6. Mouse control is the beacon f5 key, the first can not be used in future will not be random, but repeat it several times to be used this is because the games are nine clearance, beacon used the key, not only as a last resort use, zantingjian space bar control suspended, each had a time limit, losing no time

    鼠標控制, f5是指路鍵,第一下不能用,以後隨機也會不能用,但隔幾下就可以用,這是因為游戲有九關,用到指路鍵的地方多,不到萬不得已不要用,暫停鍵空格鍵控制暫停,每局有時間限制,抓緊時間!
  7. Introduction : mouse control is the beacon f5 key, the first can not be used in future will not be random, but repeat it several times to be used this is because the games are nine clearance, beacon used the key, not only as a last resort use, zantingjian space bar control suspended, each had a time limit, losing no time

    鼠標控制, f5是指路鍵,第一下不能用,以後隨機也會不能用,但隔幾下就可以用,這是因為游戲有九關,用到指路鍵的地方多,不到萬不得已不要用,暫停鍵空格鍵控制暫停,每局有時間限制,抓緊時間!
  8. In the fields of longitudinal flow and transverse business management and scientific control time limit for a project the company will carry out the tenet of " think what is customer thought, customer first, quality first, service first " from a to z

    在縱向流程,橫向業務管理,科學控制工期等方面,想客戶所想、把客戶第一、工程質量第一、服務第一、貫穿工程的始終。
  9. Article 21 if an enterprise or institution causes severe environmental pollution with solid waste, it shall be required to bring it under control within a time limit

    第二十一條對造成固體廢物嚴重污染環境的企業事業單位,限期治理。
  10. Article 17 any enterprise or institution that produces serious environmental noise pollution in an area where noise - sensitive structures are concentrated shall be ordered to control the pollution within a time limit

    第十七條對于在噪聲敏感建築物集中區域內造成嚴重環境噪聲污染的企業事業單位,限期治理。
  11. Study several important jobs at the preparatory stages of construction, put forward the mutual relation on time limit for a project, quality, cost control and carry on overall analysis to these, go on deep introspection to relevant questions at the same time

    研究了施工準備期的幾項重要工作、提出了施工過程管理中工期、質量、成本控制和安全管理的相互關系,並對這幾個方面的管理工作進行了全面的剖析,同時對有關的問題進行了深刻的反思。
  12. Key changes to make the land, sea and air control in the time limit to get all the goods

    上下鍵控制海陸空的變身,在限時內拿到所有的物品
  13. Miss again starting promptly operations guide : control of the land, sea and air transfiguration, within the time limit to get all items

    懷念的變形金剛再次出發操作指南:控制海陸空的變身,在限時內拿到所有物品。
  14. Introduction : miss again starting promptly operations guide : control of the land, sea and air transfiguration, within the time limit to get all items

    攻略:懷念的變形金剛再次出發操作指南:控制海陸空的變身,在限時內拿到所有物品。
  15. In the aspect of the time - optimal control algorithm, with the special trajectory, a method for seeking scalar velocity bound curve and scalar acceleration limit has been proposed, which fully considered the dynamics nonlinear

    在機器人時間最優控制演算法方面,提出一種在特定軌跡約束下尋求標量速度邊界曲線和標量加速度極限分佈的方法,其充分考慮了機器人動力學的非線性因素。
  16. By analyzing the scalar velocity bound curve and combining distribute of acceleration limit, a time - optimal control algorithm was designed. the results of experiments show it can make full use of the capacity of motor while realizing the stability and positioning accuracy of system, solving the problem of time - optimal control

    通過對標量速度邊界曲線的分析,結合加速度極限分佈情況,設計了一種在特定軌跡約束下機器人時間最優軌跡規劃演算法,以在保證系統穩定性和定位精度的前提下,充分發揮電機的性能。
  17. Within the specified time limit, the strategy determines and implements an optimal feed - forward control sequence to the system, swings up the double inverted pendulum from its hanging position, and achieves zero speed state at the upright position

    該策略通過在規定的時間內向系統施加一前饋控制序列,使上、下擺桿從自然懸垂位置擺到倒立點位置並使速度為零。
  18. As to project management of construction, the key to improve construction speed and shorten time limit for a project lie in rational disposition and utilize of resource ; factor influencing project quality a lot of, the key lie in the management of quality control point to construct course ; the most effective way of reduce expenses is raise working efficiency ; safety management as administrator is the attitude toward work and people in fact

    對施工項目管理而言,提高施工進度、縮短工期的關鍵在於資源的合理配置和利用;影響工程質量的因素很多,關鍵在於對施工過程中質量控制點的管理;節約成本的最有效途徑是提高工作效率;而安全管理實際上就是作為管理者,對工作、對人的態度問題。
  19. There is a pretty strict limit of reliability, cost, volume and energy - consuming. real - time embedded control system is applied for firm real - time and responding circumstance. aiming at direct current servo electromotor, a set of servo experiment system is designed, exploitation flow and process of real - time embedded control system are advanced, some issues of them are paid much more attention, the satisfied effects are obtained in the real circumstance, these issues include : exploitation of embedded system, analysis of superiority of the exploitation, the exploitation of embedded linux operation system from kernel customizing and file system cutting out to system starting up is researched, some factors which effect the system ' s capability are analyzed, the settled real - time schemes of linux os and the arithmetic of preemptive priority scheduling and round - robin scheduling and latest and rapid arithmetic are researched

    本文圍繞著針對直流伺服電機設計一套伺服試驗系統,對于嵌入式實時控制系統應用技術進行了比較全面的研究,提出了嵌入式實時控制系統的開發流程和步驟,並對其中的一些問題進行了專門研究,在實物實驗中獲得了比較好的效果,這些問題包括:嵌入式操作系統開發,分析了使用linux操作系統進行嵌入式操作系統軟體開發的優越性,並且從內核定製、文件系統裁剪、系統啟動等幾個方面研究嵌入式linux操作系統的開發;實時性研究,分析了在操作系統中影響系統實時性能的因素,研究了linux操作系統的幾種實時解決方案,並且研究了基於優先級的可搶占式與可選擇的同優先級按時間片輪轉相結合的調度演算法以及最遲響應與最快處理的可搶占式調度演算法。
  20. Objective to compare the dynamic changes of the content and constituents of volatice oil from atractylodes macrocephala koidz in different gathering times, determine the best gathering time limit, and provide a basis for quality control of atractylodes macrocephalakoidz

    摘要目的比較同一產地不同採收時期白術揮發油及含量的動態變化,確定白術的最佳採收時期,為中藥材白術的質量控制提供科學依據。
分享友人