track displacement 中文意思是什麼

track displacement 解釋
軌道位移
  • track : vt 用纖拉船。vi 拉纖行駛。n age 拉纖。n er 拉纖的人。n 1 軌跡,輪跡,航跡,痕跡;〈pl 〉足跡。2 ...
  • displacement : n 1 轉位,移動;取代,置換;(人的)流離失所。2 撤換,免職。3 【機械工程】(活塞)排氣量;【航海...
  1. In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future

    本文結合重慶市大渡口區「三木花園」開發建設項目,從地下空間靜力結構穩定性分析角度出發,針對在該項目中涉及的高層和多層建築物以及在其地下20米處開挖了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體工程情況,採用2d - 3d -有限元結構分析程序對高層與多層建築物的地基基礎及其與城市軌道交通使用的地下隧道圍巖的應力與位移演變規律進行了有限元數值分析計算,探索了地下空間圍巖與高層或多層建築物地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層建築物狀態和地下開挖用於軌道交通的地下隧道狀態等三種不同狀態以及4個水平剖線和4個垂直剖線等不同情況,從以下幾個方面具體分析研究了計算斷面的應力與位移分佈規律: ( 1 )在各種不同狀態下計算斷面的主應力矢量圖、位移分布圖( ux 、 uy )以及應力等值線色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同水平與垂直剖線的應力_ 1 、 _ 2和_ ( xy )對比分佈曲線; ( 3 )不同狀態下相同水平或垂直剖線的應力_ 1 、 _ 2和_ ( xy )的對比分佈曲線等,為今後在對地下空間的開發利用以及在高層建築物地下開挖硐室時的工程設計和工程施工提供參考依據。
  2. The proposed beam model satisfied the rigid - body test requirement. by using general displacement control method ( gsp method ) to determine the incremental load parameter and using incremental tangent method to deal with material non - linearity, the proposed beam model were proved to be able to track the entire procedure of deformation, numerically effective during buckling or snap - through of structure

    一系列的典型算例分析表明,本文提出的彈塑性大位移梁單元,能夠準確的跟蹤結構變形的整個過程,包括極值點失穩和跳躍屈曲的情況,可以運用於框架結構的屈曲后性能研究和非線性極限承載力的分析計算。
  3. The fifth part discourses on pushing forwards the " sofe " displacement of the surplus labor forces in the countryside of the west by developing human resources there and sets forth the new arguments and its evidences of the classification of the surplus labor forces in the countryside of the west ; and through the qualitative and quantitative analysis of these surplus labor forces, the author brings forwards a double - track approach of developing the industrialization of the agriculture of the west and accelerating the local replacement of the surplus labor forces in the countryside, at the meantime establishing a government - guided and market - oriented coordinative mechanism to spe

    第五部分論述以人力資源開發來推動西部農村剩餘勞動力的「軟」轉移問題,提出了界定西部農村剩餘勞動力的新觀點及其證據;通過對西部農村剩餘勞動力進行定性和數量分析,提出了發展西部農業產業化,促進農村剩餘勞動力的就地、就近轉移和建立以政府為指導、市場為取向的協調機制,促進農村剩餘勞動力跨區流動的雙軌途徑。
  4. By studying the characteristics of the eddy displacement sensor, it adopts the control method which include using the fitting line of sensor ' s output characteristic curve in certain block as control characteristic curve, and stipulating door limit district and a certain of backward overshoot, the stabilization of welding torch is gained under the certain track precision

    摘要通過對渦流式位移傳感器的特性研究,採用以傳感器輸出特性曲線在一定區間內的擬合直線作為控制特性曲線、設定規定門限區和一定反向調節量的控制方法,得到了在保證一定的跟蹤精度條件下的焊槍穩定。
  5. The vertical displacement and internal force of slab track structures under the loads are calculated by composite beam method and finite element method respectively in this paper, and the results are obtained by matlab programs, which measured up to the basic principle of ballastless track structure

    分別採用疊合梁法和有限元法,對板式軌道在荷載作用下的豎向位移和內力進行了分析,並通過matlab編程實現,計算結果符合無碴軌道結構的基本原理。
  6. That part of a track or band on a magnetic drum, a magnetic disk, or a disk pack that can be accessed by the magnetic heads in the course of a predetermined angular displacement of the data medium

    磁鼓、磁盤或磁盤組上的一條磁軌或一組磁軌的某個部分,在數據媒體旋轉到預定的角度時,磁頭能在該部分存取數據。
分享友人