transformer area 中文意思是什麼

transformer area 解釋
換算面積
  • transformer : n. 使變化的人[東西];【電學】變壓器;變換器;互感器。 polarity of transformer 變壓器繞線方向。
  • area : n. 1. 面積;平地;地面。2. 空地;〈英國〉地下室前的空地。3. 地區,地方;〈比喻〉區域;范圍。
  1. Three phase dry type power transformer, which make it with those features : safety, reliability, and energy saving, fireproof, flameproof, simple maintenance etc., the design is advanced ; the structure of products is reasonable and the outline is fine, the main performances of the products are much better than the national standards, for example, partial discharge level no - load loss, on - load loss, noise level, it is adaptable for application on heavy humidity and severely pollute places which are near to lake, sea and rive, as well as, high demand - fireproof, heavy load capacity place, such as : high building, airport, station, port, underground, hospital, electrical power station, metallurgy, shopping center, residential area and petroleum chemical industry, nuclear power station, nuclear - powered submarine

    非包封線圈三相干式變壓器,具有安全可靠節能防火防爆維護簡單等優點。其設計先進結構合理外形美觀。主要性能指標均優于國內標準,如局放水平空載損耗負載損耗噪聲以及能適應高溫度環境使用等,可安裝在靠近湖海河邊污穢潮濕的環境及防火要求高負荷較大的地區,適用於高層建築機場車站碼頭地鐵醫院電廠冶金行業購物中心居民密集區以及石油化工核電站核潛艇等場所。
  2. The main work is as following : firstly, some basic issues of economical operation of transformers are analyzed. focusing on calculating the economic load coefficient and carving up the running area of the transformer, determining the advantage between transformers, confirming economical operation mode of transformers in the parallel or divided running condition

    分析了變壓器經濟運行的一些基本問題,主要對變壓器的經濟負載系數的計算、運行區間的劃分,變壓器間技術優劣的判定以及並列和分列運行模式下經濟運行方式的確定進行了分析和討論。
  3. As the step - down transformer has no load when the scr is turned off, the system is stable during switching. less transformers, small area the device occupies, the relative simplicity of connection are the other advantages

    這種補償方案由於在晶閘管關斷時降壓變壓器相當于空載,不存在暫態過程的不穩定問題;所用的變壓器數目少;佔地面積較少;接線相對較簡單。
  4. The company possesses high voltage transformer, transforming electricity place, ensuring the whole factory and relational area safe electricity supply

    公司擁有高壓變壓器、變電所,確保整個廠區及家屬區安全供電。
  5. Carrier communication over high voltage power line has been developing for near one hundred years. it has many applications for voice communication in power distribution, data collection from tele - control instrumentation, and so on. however, using power line within one transformer area to provide internet access is a just recent development

    高壓電力線載波通信已有近百年的歷史,它在電力調度話音通信、電力系統遠動裝置數據採集等方面取得了卓有成效的應用,但是利用一個臺區的低壓電力線建立internet接入網是近幾年來國際上剛剛興起的技術。
  6. It can be applied for purification of unqualified transformer oil, mutual inductor oil, oil switch oil and capacitor oil as well as low - viscosity lubricating oils for electric plant, power station, electric company, transformer substation working area, plant, railway, ect

    廣泛適用於電廠電站電力公司變電工區廠礦鐵路等,對不合格變壓器油互感器油油開關油電容器油低粘度潤滑油的凈化再生處理。
  7. Based on the analysis of the paper, we can draw the conclusion that this device has several issues to be solved to put into use, such as low filtering capacity, large bulk and area the device occupies, complexity of connection, and the hazard of ferro - resonance existing when switching without disconnecting the circuit of the step - up transformer

    經過分析發現,這種補償方案存在一些問題,如濾波能力低,補償裝置體積大,佔地面積多,接線復雜;並且如果在投切過程中不將升壓變壓器高壓側迴路斷開,存在著發生鐵磁諧振的危險。
  8. Engineering technicians enter the equipment testing area in the linhai power transformer substation in mudanjiang city of northeast china ' s heilongjiang province, nov. 22, 2006

    11月22日,在牡丹江市林海變電站,工程技術人員進入調試設備區。
  9. According to the characteristic of nine - area diagram of substation vol / var coordinated control, this system gives the defination of fuzzy sets and the degree of membership of input / output variables, and designs corresponding control rules. the results of simulation demonstrate the system can satisfy the constrains of the day - adjusting times of the switching of on - load transformer and paralleled compensation capacitors, and ensure voltage quality, reactive power basical balance. considering the var requirement in different load time period and the control demand in load saltation, a improved control scheme is provided. the results of simulation show the improved scheme can meet the demand of vol / var in different load time period, protect the wrong operation when either voltage or reactive power appears saltation, and decrease the times of regulation of the switching of on - load transformer and paralleled compensation capacitors finally, a background software module of substation vol / var coordinated control is designed, based on the supervisory control and data acquisition system of substation

    模擬結果證明該系統能在各種負荷條件下確保電壓合格和無功基本平衡,且能滿足變電站對有載調壓變壓器分接頭日調節次數和並聯補償電容器組的日投切次數的限制。通過考慮不同負荷時段對無功功率的需求和負荷突變情況下的控制要求,對上述模糊控制策略進行了改進,模擬結果證明改進后的控制策略能滿足不同負荷時段對電壓和無功的要求、抑制電壓或無功突變情況下的誤動作,且有效地減少了有載調壓變壓器分接頭和並聯補償電容器組的調節次數。最後基於變電站scada系統設計了一后臺電壓無功綜合控制軟體模塊。
  10. Operation analysis of area transmission and transformer net and study on fault precaution

    區域輸變電網運行分析與故障防範的研究
  11. On - line pd monitoring of power transformer is presently the research hotspot in the area of high voltage insulation measurement and diagnosis

    變壓器局部放電在線監測是高電壓絕緣檢測與診斷領域研究的熱點課題。
分享友人