transformer substation 中文意思是什麼

transformer substation 解釋
變電分站
  • transformer : n. 使變化的人[東西];【電學】變壓器;變換器;互感器。 polarity of transformer 變壓器繞線方向。
  • substation : n. 分站;變壓所;支局,分局,派出所。 a power substation 變電所。
  1. Achievable unmanned power transformer substation

    無人值班變電所的實現
  2. In order to obtain the most economic benefits, the paper utilized the theory of " homalographic characteristic " and " share alike compensation current characteristic " to build up the best compensation relation for " hour - current " curve applied to transformer substation and for " length - current " curve applied to distribution line

    以獲得最大經濟效益為目標,利用「等面積特性」和「補償電流等分特性」理論。推導了應用於變電站的「時間?電流」曲線關系中存在的最佳補償關系,以及應用於配電線路的「長度?電流」曲線關系中存在的最佳補償關系,及補償后的經濟效益計算模型。
  3. The transformer substation survived the blast with relatively minor damage to the essential components.

    經爆震波襲擊后未被毀壞的變電站的重要組件受到較小的損壞。
  4. The design method of system structure and every compositive section is introduced. the graphics edit platform is developed, including edit software of transformer substation ' s diagram and diagram for calculating line - loss, then the method of coding is introduced, especially the transition from diagram to matrix of conductance and susceptance

    開發了本系統的圖形編輯平臺,包括變電站接線圖編輯軟體和網損接線圖編輯軟體,分別對變電站接線圖編輯軟體和網損接線圖編輯軟體的實現過程進行了闡述,詳述了從矢量圖表示的電網圖轉化成導納矩陣的過程。
  5. This article through installs the reactor with air core in the transformer substation transmission, to control the thunder electric wave amplitude and steepness in the transformer substation ; through over voltage on - line monitoring device testing, inquire into lightning protection of the reactor with air core

    本文通過在變電站的輸電線路的出口處加裝空心電抗器,對通過輸電線路侵入變電站的雷電波的幅值和陡度進行抑制;並通過安裝過電壓在線監測裝置進行測試的方法,初步探討了空心電抗器防雷的作用。
  6. The program is developed with visualizing programming language called visual basic. net and general cartography software called autocad. based on the windows operating system, it has realized the integration of intelligent design, data processing and automatic cartography in a transformer substation ' s primary circuit, using intelligent technique supported by expert system, activex technique to develop

    開發的一次智能cad系統可以顯著提高工作效率、減少技術人員的勞動,對于促進供配電cad技術向高層次的集成化、智能化和標準化方向發展具有重要的理論意義和現實意義,是供配電所設計工作的發展方向。
  7. Aiming at the problem that existence in the monitoring of simulate disk in local power grid, to enhance the level and efficiency of the electricity dispatch, to improve operation procedures, to change the troublesome work about 6kv line simulation disk, 35kv transformer substation and 6kv substation host cording diagram revision and maintenance from man - power, manual promotion to direct - viewing, real - time and work flow high automation level

    針對地方電網「模擬盤」監視中存在的問題,為提高電力調度工作水平和效率,完善操作規程,把煩瑣的6kv線路模擬盤、 35kv變電所和6kv配電所主結線圖的修改和維護工作從人工、手動提升到直觀、實時和工作流程高度自動化水平,實現電力調度日報、月報及日常管理實現規范化、自動化。
  8. Application of geometric programming and geometric programming with fuzzy coefficients in seeking power supply radius of transformer substation

    系數的幾何規劃在城市變電所供電半徑選擇中的應用
  9. Tension piles are widely used for resisting uplift loads of underground structures such as deep basement and underground transformer substation, and foundations for tall buildings subjected to high bending moments

    摘要抗拔樁常被應用於地下構築物的抗浮和受較大彎矩作用高聳構築物的基礎。
  10. This research was also supposed to provide a valuable reference for the construction of 500kv eastern hangzhou transformer substation project. to guarantee the rationality of the torsion and bending load application, a set of experimental equipments was transformed from a traditional one by exerting tangential force on the brim of the fan board and conducting broad - billed roller application. in the actually fulfilled experiments on the capabilities of the members under different ratios of torsion and bending, the equipments proved to be well qualified in load applying to large - tonnage members

    試驗中,為保證扭轉及彎矩荷載施加的合理性,在浙江大學工程結構試驗室原有的加載設備的基礎上,分別採用在扇形板邊緣施加切向力和寬軸承滾軸加載的方法,改造並調試出一套可專門用於大噸位構件施加扭轉荷載及組合作用的試驗設備,並利用這套設備進行了離心鋼管混凝土構件在不同彎扭比的組合作用下的試驗研究。
  11. The emulational calculating theories of traction power supply system ' s operating charts combine with actual things of engineering design at present in chapter three, to set up traction web current distributing mathematical model, integral distributing mathematical model, locomotive distribution and obtaining current model at every moment, and on which making use of mathematical planning methods to set up mathematical models is based at every moment in every instance interval of the railroads. for instance, instantaneous current, instantaneous voltage descent and effective current, main changing capacity and so on, in addition, there are the minimum power shortage model, the optimal transformer substation location, the least engineering expenditure, the optimal mathematical model of traction power supply system. optimize design ' s algorithm of traction power supply system is introduced in detail in chapter four, where programming idea and realizing method of the computer software are given an explanation

    本研究主要進行了以下工作:結合牽引供電系統運行圖的模擬原理和現行工程設計的實際情況,建立了牽引網電流分佈、積分分佈、任一時刻機車分佈和取流的數學模型;應用數學規劃方法建立了任一距離區間、任一時刻的瞬時電流、瞬時電壓降數學模型和有效電流、主變容量和主變壓降、最小功率損失、最佳變電所容量、最佳變電所位置、最少工程費用、最少運營維護費用和牽引供電系統方案最優等方面的數學模型;闡明了牽引供電系統優化設計的演算法和計算機軟體編程思想及實現方法;進行了工程實例計算;最後,對牽引供電系統優化設計技術應用進行了總結。
  12. And so, the gis - based electric cable information management system can administrate transformer substation, switch substation, power distribution room, power cable, silo, canal and high voltage user according to their location, drawings, cable records. the system provides multiple index for query service and statistical electric cable graph and information on properties

    本系統可以實現對變電站、開關站、配電室、電纜、豎井、溝道及高壓用戶等空間位置、圖形資料(包括一次接線圖、竣工圖、斷面圖) 、電纜臺帳信息的綜合管理;並可按多種方式來查詢、檢索、統計電纜圖形及屬性數據信息。
  13. The unites which is designed according to the transformer substation and distribution automation have protection, measurement, controlling and communication function communicated with ftu and realize measurement, protection and feeder automation integrated functions. the equipment can communicate with scada and finish measurement and controlling function

    本系統的配電終端是按同時面向變電站(開閉所)間隔與配網自動化饋線設計的一體化現場終端,具有保護、測量與控制以及對饋電線路ftu的通信管理功能,實現了測控、保護、饋線自動化三合一的思想。
  14. The engineer of the electric power science academy tested the harmonic occurred in 220kv transformer substation in baishiyan 、 110kv transformer substation in nantupo 、 110kv transformer substation and converting station in 821 factory. this article analyzed these data particularly. the three - phase commuted device of 821factory is one of the main harmonic in the power supply & transmit electricity system in guangyuan

    四川電力公司諧波監測站對廣元電業局所屬的袁家壩220kv變電站、白石巖220kv變電站,新廣興220kv變電站,懶土坡110kv變電站,廣興鋁廠110kv變電站,八二一廠110kv變電站及整流站進行了諧波測試,本文對其測試結果作了較為詳盡的分析。
  15. Tangyin substation is an important substation which has two transformer of 120mva, eight 220kv lines and three 110kv lines. tangqian line is a 110kv line specially for traction transformer substation. because traction load is high - power nonlinear and asymmetry. it will produce much harmonic and negatvie sequence current, which have done harm to compensation capacitors of tangyin substation. in recent years, the tang6c capacitor often interrupted and in 2001 july the tang7c capacitor ' s discharge pt exploded

    湯陰變電站是豫北一座樞紐變電站,有2臺120mva的主變, 8條220kv線路和3條110kv線路,其中的湯牽線是專為牽引變電站供電的110kv線路。由於電力機車屬于大功率的非線性負荷,且三相不對稱,在其運行過程中必然會產生較大的高次諧波和負序電流。
  16. The problem of phase order in transformer substation ' s erection

    變電所安裝中的相序問題
  17. Vacuum circuit breaker, drop - out fuse, current limiting fuse, hv fuse, lightning arrester, load switch, power cable distribution box, ring - type net switch station, intelligent power distribution automation system, box transformer substation, hv switchgear cabinet set, lv switchgear cabinet set, isolating switch, hv synthetic rubber insulator, etc. high technology is the source of sunrise development " continuous improvement, keep learning to succeed " is our concept. the group has established a long - tem cooperation with uk birmingham university. electric power research institute of china

    主要生產126kv以下輸變電設備,主要有真空斷路器跌落式熔斷器限流熔斷器高壓熔絲避雷器負荷開關電纜分接箱環網開關站智能配電自動化系統箱式變電站高壓成套開關櫃低壓成套開關櫃隔離開關高壓合成膠絕緣子等14大系列800多種規格。
  18. With the development of the multimedia and communication technology, video monitoring system has been applied in the electrization railway transformer substation. and the most popular technology ? windows dna has been applied in many aspects of industry. it " s no doubt that the cooperation between them would bring us more reward

    隨著多媒體技術及通訊技術的發展,視頻監控系統正開始逐步在電氣化鐵路變電所採用,而當今最新流行的windowsdna技術也已經開始在各方面得到應用,將兩者有機地結合起來,實現最新技術的合併,必能獲取最佳的收益。
  19. Relying on years of researching of electric power, accumulated manufacturing experience, and affluent economic technological power, the enterprise is capable of product pgl, ggd, gcs, gck low voltage power distributing panel, xgn2 - 12, hxgn15a - 12 high voltage switch cabinet, xbz1, xbj1 box - type transformer substation and zw8 - 12 630 - 20 outdoor high voltage vacuum breaker, totally 6 series and 200 more varieties. the products are a great contribution to the social economic development and have been recognized and praised by vast customers

    企業憑借多年的電氣成套研製生產經驗和雄厚的經濟技術力量,生產pgl ggd gcs gck型低壓配電屏xgn2 - 12 hxgn15a - 12型高壓開關櫃xbz1 xbj1型箱式變電站及zw8 - 12 630 - 20型戶外高壓真空斷路器等6大系列200多種品種,為社會經濟發展提供可靠的產品和服務,得到廣大客戶的認可和贊譽。
  20. Long - distance monitoring system of the transformer substation

    網路服務器機櫃監控系統
分享友人