transition duration 中文意思是什麼

transition duration 解釋
過渡配合
  • transition : n 轉變,演變,變遷,變化;飛越;過渡期;【音樂】變調,轉調;【修辭學】語次轉變;【語法】轉換;【...
  • duration : n. 1. 持久,持續。2. 持續時間,存在時間;期間。adj. -al
  1. In light of market risk, there are sensitivity measurement method and volatility measurement method as well as the concepts about risk measurement, such as variance, duration, 3 - coefficient, 5 - coefficient and value at risk. and in light of credit risk, there are accounting - based ratio measurement method and volatility - based measurement method, as well as the related concepts, such as credit rating, z - score, transition matrix, expected default frequency

    其中,針對市場風險度量的方法包括靈敏度測量風險方法和波動性測量風險方法,與之相關的風險度量概念有方差、持續期、系數、類系數和在險價值;針對信用風險度量的方法包括基於財務比率的風險測量方法和基於波動性的風險測量方法,與之相關的風險度量概念有信用評級、 z分數、轉換矩陣、違約頻率。
  2. Data used in this work are north pacific ssta, 160 stations precipitation of china, and ncep reanalysis data. main results are as follow : ( 1 ) it is found that a apparent transition of north pacific ssta in later 1970 ' s : eastern and middle - equatorial pacific ssta turns from cold to warm with area extending, and mid - latitude pacific ( west wind drift zone ) turns from warm to cold. during this transition of ssta, different characters also appear in el nino and la nina : before 1976, la nina happens more frequently, and its duration is longer, el nino zone develops from negative ssta in the early stage ; after 1976, el nino happens a little bit frequent and longer with more intensity than before, el nino zone develops from positive ssta in the early stage ; the course of ssta variation has an enso cycle of 2 - 6 years, annual oscillation of 8 - 9 years, and decadal variation of about 22 years

    本文採用1950 - 1999年北太平洋海表溫度( sst ) 、中國160站夏季降水和ncep再分析的歐亞500hpa高度場等資料,利用eof 、 svd 、小波分析、合成分析和相關分析等方法,在分析北太平洋海溫時空分佈特徵的基礎上,著重探討了海溫異常及其年代際變化對我國東部降水的影響,並對降水、高度場和海溫三者之間的關系進行了分析,以試圖尋找三者異常之間可能的聯系,主要結論如下: ( 1 ) 1976年前後,北太平洋海溫經歷了一次明顯的轉變,赤道中、東太平洋厄爾尼諾海區由冷轉暖,暖水范圍增大,中緯度西風漂流區海溫由暖轉冷;在這樣的年代際背景下,厄爾尼諾、拉尼娜事件在不同的時期也有不同的特徵:在76年前,拉尼娜事件發生頻率高,持續時間長,事件起始於負海溫距平;而76年後,則是厄爾尼諾事件發生頻率略高,持續時間長,強度增大,事件起始於正海溫距平。
  3. Transitional feature of the arc and metal droplet in the welding process with steam shielded arc is investigated by means of analysing the waveforms of welding voltage and current under different welding regimes and it is found that there are two types of arc process behavor ? " arc starting - arc blowing out - short - circuiting " and " arc - starting - short - circuiting ". under the condition of constant diameter of welding wire and its feeding speed, the arc process behavor can be changed by adjusting the inductance of welding circuit as well as the voltage of power supply. if arc process behaves as alternative process of " arc starting - arc blowing out - short - circuiting " with minimum time duration of arc blowing out and maximum frequency of short - circuit transition, the welding process will be stable with less spatter and smooth weld bead

    通過分析不同焊接規范下的焊接電壓和電流的波形.研究了水蒸氣保護下電弧及熔滴過渡的特點,發現其電弧過程行為有「燃弧?熄弧?短路」和「燃弧?短路」兩種形式.在焊絲直徑和送絲速度一定的情況下,通過調節焊接迴路中的電感量和電源電壓,可以改變電弧的過程行為形式.若電弧過程呈「燃弧?熄弧?短路」交替進行,並且熄弧時間最短時,短路過渡頻率最高,在這種情況下,飛濺小,焊道成型好,焊接過程穩定
  4. Research on the uncertainty of transition duration of broadband sampling oscilloscope based on nose - to - nose technology

    技術的寬帶取樣示波器過渡時間不確定度的研究
  5. For example, when the design flow of upward of the peace bridge of upward of the east - one main canal is 45m3 / s, the actual flow quantity is 23. 8m3 / s on the 30th of september in 1989, the water level of the transition region terminal of the mouth of hao wan flume of the east - one main canal had gained the design level of 4. 3m, and the level between downstream and shang tian yuan tunnel was generally higher. it says that the actual discharge capacity now is only about 24m3 / s which is half of the design value. this not only make the benefit of the irrigation district abnormal, but also greatly hinder the economic development of the irrigation district, and lead to the canal run frequently at small flow, high water level, lengthen the discharge duration

    如東一乾渠上段太平橋以上設計流量45m ~ 3 s , 1989年9月30日實測通水流量23 . 8m ~ 3 s時,東一乾渠郝灣渡槽出口漸變段末端水位已達到設計水位4 . 3m ,其下游至上天院隧洞水位也普遍偏高,即東一乾渠上段目前僅能通過流量24m ~ 3 s左右,只有設計值的50左右,不僅使灌區效益得不到正常發揮,嚴重阻礙了灌區范圍內的經濟發展,而且使渠道經常處于小流量、高水位運行,延長了次通水時間,大大增加了渠道工程的安全管理難度。
分享友人