travelling bridge 中文意思是什麼

travelling bridge 解釋
龍門式起重機
  • travelling : adj. 旅行的,游歷的;流動的,移動的。n. 旅行,游歷;流動(劇團);移動;滑走。 travelling expenses 旅費,盤費。
  • bridge : n 1 橋,橋梁;【造船】艦橋,船橋。2 鼻樑;(假牙上的)齒橋;【音樂】弦柱,弦馬;【電學】電橋;【...
  1. Specification for cabins of overhead travelling cranes and portal bridge cranes for general purposes

    通用橋式和門式起重機司機室技術條件
  2. Experimental study on overspan safety of counterpoised travelling bridge - erecting machine

    配重行走式架橋機過跨安全性試驗研究
  3. Anyone travelling across the bridge has to pay a toll

    過這座橋的人都要付通行費。
  4. Cranes and lifting appliances - classification - part 5 : overhead travelling and portal bridge cranes

    起重機和提升設備.分類.第5部分:移動式高架起重機和橋式龍門起重機
  5. Cranes - controls - layout and characteristics - part 5 : overhead travelling cranes and portal bridge cranes

    起重機.控制裝置.設計方案和特徵.第5部分:移動式高架起重機和橋式龍門起重機
  6. Seismic response analysis of a long - span cable - stayed bridge under random seismic excitations with spatial variations, including travelling effect, incoherence effect and local site effect, was made with stochastic method

    摘要以南京第二長江大橋南漢橋為例,採用隨機振動分析方法研究了地震動的空間變化特性,包括行波效應、部分相干效應以及局部場地效應對大跨度斜拉橋地震響應的影響。
  7. " members welcome the bridge project which will reduce the travelling time from hong kong to macao and zhuhai to within half an hour

    委員歡迎建造港珠澳大橋;工程將縮短香港到澳門以至珠海的行車時間至半小時之內。
  8. A temporary rail bridge has been opened at the lo wu boundary crossing to carry trains travelling between hong kong and shenzhen. the switchover from the old bridge was completed this morning ( august 21 )

    政府已在羅湖邊界通道興建臨時鐵路橋,以維持香港與深圳之間的直通車服務,並於今早(八月二十一日)完成將鐵路線從現有的鐵路橋轉軌至臨時鐵路橋行走的工序。
  9. While making a right turn into choy yee bridge road, the lgv reportedly knocked down a 49 - year - old female cyclist who was travelling along tuen mun sze wui road heading towards san hui

    輕型貨車右轉入蔡意橋路時,據報撞倒正沿屯門鄉事會路往新墟方向行駛的單車。
  10. Cranes - overhead travelling cranes and portal bridge cranes - tolerances of manufacture and tracks laying

    橋式和門式起重機製造及軌道安裝公差
  11. ? introducing the component of mechanical system of container loading bridge, mainly including hoisting mechanism, gantry travelling mechanism, boom mechanism and trolley mechanism. ? devising the electric control system of container loading bridge, mainly including hoist / gantry control circuit and boom / trolley control circuit

    設計了一套集裝箱裝卸橋的電氣控制系統,主要包括供電系統的設計、輔助迴路的設計、起升/大車迴路的組成及控制、俯仰/小車迴路的組成及控制等。
  12. Cranes - information to be provided - part 5 : overhead travelling cranes and portal bridge cranes

    起重機供需雙方應提供的資料第5部分:橋式和門式起重機
  13. Cranes - access, guards and restraints - part 5 : overhead travelling cranes and portal bridge cranes

    起重機.通道防護裝置和限制器.第5部分:橋式起重機和門式起重機
  14. The best way to visit the bridges is travelling by our cityflyer or northern lantau routes to across the bridge. you can experience the grand scenic views on the way, and then the beautiful scenery on lantau island and also the great facilities at the airport

    最直接參觀大橋的方法,莫過于乘搭城巴來往市區與機場及北大嶼山的路線,親身體驗個中感受和迷人的海景,更可以順道欣賞北大嶼山的景色和新機場的英姿。
  15. Postgraduate : pu liangtao supervisor : professor shang shouing senior engineer huang gang the research on influence of the post - casting section of continuous rigid bridge suffered vibration of train travelling is preseated in this thesis according to related project. based on theorize analysis, expriments of material properties and members under deformed vibration, verification of isolating and reducing vibration in building as well as construction technology and quality control, the effect of post - casting section suffered deformed vibration is studied thoroughly. through the analysis of 28 tests of shear strength with post - casting section under deformed vibration, the related laws are deduced. and the analysis of finite element method, the studies of quality control and construction technology are also completed

    通過現場測試、模型和試塊的模擬振動成型試驗、加載破壞試驗、理論分析、現場減振隔振試驗、施工工藝和質量控制等一系列全面、系統的研究工作,認真、深入地研究了現澆混凝土受火車行駛振動的影響,特別是在約束構件后澆濕接頭區段內現澆混凝土受火車行駛振動影響研究方面作出了開創性的工作,完成了振動使濕接頭區段受到彎曲變形影響條件下的構件模擬振動試驗、抗剪強度試驗。
  16. Based on this study the following conclusions are drawn : the responses of cable - stayed bridge under seismic excitations with spatial variations differ from those under uniform seismic excitations up to 30 % ; the responses obtained by considering travelling effect as well as incoherence effect are close to those obtained by only considering travelling effect ; travelling effect has more significant effect on the seismic responses of cable - stayed bridge than incoherence effect ; if r. m. s. ( root - mean - square ) of random seismic ground motions are equal, seismic responses are considerably greater for the case of soft soil than for the cases of firm soil or medium soil

    研究結果表明:與一致地震激勵相比,地震動的空間變化特性可以使斜拉橋的地震響應改變30 % ;同時考慮行波效應、部分相干效應時的地震響應接近於僅考慮行波效應時的地震響應;行波效應對斜拉橋地震響應的影響明顯大於部分相干效應的影響;在加速度均方根相同的隨機地震作用下,斜拉橋在軟場地條件下的地震響應明顯大於在硬場地條件下的響應,中等場地條件下的地震響應介於兩者之間。
  17. Shortly before 6 pm, a container truck was travelling along the slow lane of tsing long highway towards kowloon. when reaching near ting kau bridge, the vehicle stopped at a lay - by area and was reportedly rammed by a light goods vehicle ( lgv ) travelling on the slow lane from behind

    下午約六時,一輛貨櫃車正沿青朗公路九龍方向的慢線行駛,當駛至近汀九橋時,貨櫃車停於一個避車處,據報被一輛沿慢線尾隨的小型貨車撞向車尾。
  18. With the nine players named on monday joining up with previously selected john terry, frank lampard, joe cole, wayne bridge, arjen robben, michael essien, william gallas and claude makelele, it brings the total of chelsea players ( including ballack and maniche ) who will be travelling to germany to 17, surpassing the 11 that contested the 1998 world cup in france

    星期一新入選的9名球員加上先前入選的約翰?特里,弗藍克?藍帕德,喬?科爾,維恩?布里齊,羅本,艾辛,加拉和馬克萊萊,總共有17名球員將會去德國(包括巴拉克和馬尼切) ,超過了1998年法國世界盃時的11人。
分享友人