trench work 中文意思是什麼

trench work 解釋
土方工程
  • trench : n 特倫奇〈姓氏〉。vt 掘溝,開畦溝;掘翻(田地),深耕;【軍事】掘壕溝,用戰壕防守;【木工】作溝槽...
  • work : n 1 工作,操作,勞動,作業;工件;功課;努力;行為,作用。2 (待辦的)事務,業務;職業。3 〈前有...
  1. " prestress anchor ribbed beam support system " is a new practical support technology which came from soil nailing walls system and un - embedded rank of piles with anchors support system that has been used successfully for 4 years by the author and his company named qingdao deep foundation stabilization engineering co., ltd. it " s mechanism is similar to rank of piles with anchors support system that can not be inserted into the bottom of foundation trench, but it " s ribbed beams are used to replace rank of piles made before excavation so the work cycle can be shortened and the support system cost can be reduced ; meanwhile this system maintains the soil nailing wall " s convenience of digging and supporting

    「預應力錨桿肋梁支護技術」是筆者及所在單位歷時四年在土釘墻和無嵌入多錨排樁兩種支護體系基礎上開發應用成功的一種新型實用性支護技術。其支護機理類似於未嵌入坑底的排樁多錨支護,只是由肋梁代替了開挖前施工的排樁從而提前工期並降低支護造價;同時繼承了土釘墻隨挖隨支護的機動靈活性。自1998年至今該技術已在青島、濟南、煙臺等十幾個深基坑和高邊坡工程中成功應用。
  2. In contrast to the painful look of dread in the infantry soldiers who were guarding the battery, here in the battery itself, where a limited number of men were busily engaged in their work, and shut off from the rest of the trench, there was a general feeling of eager excitement, a sort of family feeling shared by all alike

    與在掩護部隊中間的恐怖感覺相反,這兒的炮兵連只有為數不多的人忙碌著,它被一道戰壕與別的作戰部隊分隔開來,有一種大家都感覺到的有如家庭般的歡樂氣氛。
  3. Plate vibratory compactor is the same with building site roadbed and road shoulder road maintain n pitch road surface remedy and tamp of channel and trench, either auto timing tread or original tamp, manipulate simpleness and freely, work efficiency high. dynamic properties of the plate vibratory compactor are studied, and the compaction process is theoretically discussed in this paper

    平板振動夯適用於建築工地、路基路肩、道路維修、瀝青路面修補及溝渠的夯實平整,既可自動調速行走,也可原地夯實,操作簡單自如,工作效率高。為了探索平板振動夯在壓實過程中的動力學特性,以便為平板振動夯的研製提供理論基礎。
  4. Furthermore, the pressure of soil can be exerted on anchor boards, so the stressed anchor can balance the pressure of soi1 through the anchoring. before the trench displaces, the anchoring pressure begins to work through the exertion of pre - stress. meanwhile, the stress pressure of anchor changes and is adjusted through shot concrete and its stressed steel. so the whole supporting system, which is similar with the pile - anchor supporting system, is finally formed, and it can limit the displacement of trenches

    錨桿的錨固力在基坑出現位移前,通過雨應力的施加即得以發揮作用,錨桿的受應生變化並通過噴射硅及其中的受力筋得以調整,從而形成一個與樁一錨結構近似的整體支護系統,起到限制基坑位移的作用。
分享友人