  1. All the researched results prove the era method is steady and suitable for those structures : spacecraft 、 beam - plane structure 、 truss structure 、 frame 、 bridge, etc. on the basis of the consideration of the above, the major job of the article is to discuss how to identify the parameters of the long - span structure with the method of era under the action of the wind loads

    但是,國內外已有的相關文獻,對于下面的結構均進行了相關的研究,如航天器、梁板結構、桁架、框架、橋梁等。基於以上考慮,本文主要工作,就是探討在風激勵荷載作用下,如何用era演算法識別大跨空間網格屋蓋結構的模態參數。
  2. Aiming at main project of the xiaoxihu bridge, a low pylon cable - stayed bridge, based on the existing theory and method of the bridge construction controlling theory, using the basic function of " ansys ", farther exploitation was done on concrete elasticity and creep calculating distinguishingly, nonlinearity analysis theory was used to construct the space model, the main beam, string pylon and abutment were simulated by the beam elements which was considered the shearing effect. which is worthy of considering that using the geometric non - linear truss elements to simulate the stayed - cable, form traveler is modeled as structure elements and participate in stress analysis. four stages are used to model the construction stage, which are : ( 1 ) the erection of form traveler ; ( 2 ) placing the segmental concrete ; ( 3 ) jacking the tendons ; ( 4 ) tensioning the stay cables

    針對建設中的小西湖矮塔斜拉橋的主體工程,結合已有的橋梁施工控制的理論和方法,利用大型通用計算軟體ansys的基本功能,並著重在混凝土彈性計算及徐變計算方面做了相應的二次開發,採用非線性分析理論並建立了空間結構模型、用考慮剪切作用的梁單元模擬主梁、索塔和橋墩;用可考慮幾何非線性的桁元模擬斜拉索、施工掛藍作為結構單元進行拆裝,參與受力計算,整個施工過程按施工循環周期分為若干階段,每個階段又分為四個工況,即:空掛藍就位、澆築完畢階段混凝土、張拉預應力鋼筋和張拉斜拉索。