tseung kwan o line 中文意思是什麼

tseung kwan o line 解釋
將軍澳線
  • tseung : 蔣
  • kwan : 關/群/坤/君
  • o : int 〈常用大寫字母〉哦 喲 …啊 唉 哎呀〈表示驚訝、恐怖、贊嘆、願望等〉。 O for a rest 唉 休息休息...
  • line : n 1 線;繩索;釣絲;測深度用繩,捲尺。 a fishing line 釣魚線。 be clever with rod and line 會釣魚...
  1. Tseung kwan o line : running between north point and po lam ; and

    將軍澳線:北角至寶琳及
  2. For the station platforms along the airport express line, tseung kwan o line and tung chung line, platform screen doors had been installed during the construction stage

    機場快線、將軍澳線和東涌線沿線的車站在施工階段已安裝月臺幕門。
  3. At the same time, the mtr tseung kwan o line ( tkl ) will be connected with the isl s western half at tin hau

    另一方面,地鐵將軍澳線會延伸至天後站,與港島線的西半部連接。
  4. The chief executive officiates at the commissioning of the mtr tseung kwan o line, which provides a convenient rail link between the new town and hong kong island

    行政長官主持地鐵將軍澳支線通車典禮。新支線為往返將軍澳新市鎮與香港島之間的市民提供便捷的鐵路服務。
  5. Yau tong and tiu keng leng are the interchange stations with tseung kwan o line

    油塘及調景嶺則是接駁將軍澳線的交匯站。
  6. Mtr tseung kwan o line tkol will join and run through onto the western half of isl at tin hau station. nil can relieve the causeway bay section of isl and the nathan road section of tsuen wan line by redistributing the cross - harbour trips to tcl and tkol

    北港島線可紓緩港島線銅鑼灣段,並分流過海乘客到東涌線和將軍澳線,從而紓緩荃灣線彌敦道段的擠迫情況。
  7. The total route length of kwun tong line, tsuen wan line, island line, tseung kwan o line, tung chung line, disneyland resort line and airport express line is 91 kilometres

    觀塘、荃灣、港島、將軍澳、東涌、迪士尼和機場快總長度為91公里。整個鐵路網共有53個車站。
  8. Mtr, consisting of kwun tong line, tsuen wan line, island line, tung chung line, airport express line, tseung kwan o line and disneyland resort line carried average daily passengers of about 2, 370, 000 in 2005

    地下鐵路包括觀塘線荃灣線港島線東涌線機場快線將軍澳線及士尼線。在2005年,地鐵平均每日載客量約為2 , 370 , 000人次。
  9. The two railway corporations are currently working on six projects - west rail, the mtr tseung kwan o extension, the ma on shan line, the kcr extension to tsim sha tsui, the penny s bay rail link and the sheung shui to lok ma chau spur line

    兩間鐵路公司正在落實六項鐵路工程,即西鐵地鐵將軍澳支線馬鞍山鐵路九尖沙咀支線竹篙灣鐵路線和上水至落馬洲支。
  10. The two railway corporations are currently working on six projects - west rail, the mtr tseung kwan o extension, the ma on shan line, the kcr extension to tsim sha tsui, the penny s bay rail link and the sheung shui to lok ma chau spur line. these projects are due to be completed in stages between 2002 and 2007 at a total cost of about $ 100 billion

    兩間鐵路公司正在落實六項鐵路工程,即西鐵、地鐵將軍澳支線、馬鞍山鐵路、九龍尖沙咀支線、竹篙灣鐵路線和上水至落馬洲支? 。各項工程預計在二零零二至二零零七年間分階段完成,總投資約一千億元。
  11. The panel also discussed the " final report of the investigation into the incident that occurred on 5 september 2002 at north point station of tseung kwan o line " provided by mtrcl

    事務委員會亦討論地鐵所提供題為"二零零二年九月五日將軍澳線北角站事故最後調查報告" 。
  12. The opening of tseung kwan o mtr line and the future west rail will further enhance kwun tong s transportation network, linking millennium city to all areas of hong kong. air - conditioned pedestrian footbridge millennium city is well served by air - conditioned footbridges linking ngau tau kok and kwun tong mtr station with respective phases and offer a speedy and comfortable passageway for tenants and visitors

    創紀之城2 , 3期一樓大堂相互連接, 3期租戶可使用2期的冷氣行人天橋往返寫字樓及牛頭角地鐵站,創紀之城5期亦有冷氣天橋連接觀塘地鐵站大堂及裕民坊,盡享地利。
  13. In connection with the relocation of hkia, the hong kong aircraft engineering company limited ( haeco ) transferred all its aircraft - maintenance facilities to the new airport at chek lap kok, and all its component maintenance to tseung kwan o. approval was granted to two new aircraft line maintenance organisations, the china aircraft services limited ( casl ) and pan asia pacific aviation services limited ( papas )

    角新機場,而零件維修設備則搬到將軍澳廠房。除該公司外,中國飛機服務有限公司及泛亞太平洋航空服務有限公司也獲批為可以提供外勤維修服務的機構,但香港飛機工程有限公司仍然是香港唯一獲批準的基地維修機構。
  14. The total route length of kwun tong line, tsuen wan line, island line, tseung kwan o line, tung chung line and airport express is 87. 7 kilometres

    觀塘、荃灣、港島、將軍澳、東涌和機場快?總長度為87 . 7公里。整個鐵路網共有50個車站。
  15. North point and quarry bay are the interchange stations with tseung kwan o line

    北角及魚涌則是接駁將軍澳線的交匯站。
  16. Tseung kwan o line

    將軍澳線
  17. Tseung kwan o line of mtr connects po lam at tseung kwan o with north point on hong kong island

    地下鐵路將軍澳線連接將軍澳寶琳與港島北角。
  18. The opening of the mass transit railway ( mtr ) tseung kwan o line brought new challenges

    地鐵將軍澳支線的正式落成啟用,亦為總區帶來新的挑戰。
  19. Opening of the tseung kwan o line in august was another milestone for the mtr corporation limited

    八月,地鐵將軍澳支線通車,為地鐵有限公司的發展標志另一個里程碑。
  20. When the station is opened for passenger services, the tseung kwan o line train service will bifurcate at tseung kwan o station with trains running south to tseung kwan o south station, as well as north to the existing terminus at po lam

    將軍澳南站投入服務時,將軍澳線列車運行將由將軍澳站分支,南行列車將延伸到將軍澳南站,北行列車則沿現時路線往寶琳站。
分享友人