tseung kwan o tunnel 中文意思是什麼

tseung kwan o tunnel 解釋
將軍澳隧道
  • tseung : 蔣
  • kwan : 關/群/坤/君
  • o : int 〈常用大寫字母〉哦 喲 …啊 唉 哎呀〈表示驚訝、恐怖、贊嘆、願望等〉。 O for a rest 唉 休息休息...
  • tunnel : n 隧道;地道;坑道;管道,煙道,風洞;【礦物】石巷,平峒。 tunnel warfare 地道戰。vt (〈英國〉 l...
  1. Automatic toll collection systems ( called autotoll systems ) were installed at the cross - harbour and aberdeen tunnels in august 1993, lion rock tunnel in august 1994, eastern harbour crossing in september 1995, tate s cairn tunnel in may 1996, western harbour crossing in april 1997, shing mun tunnels and tseung kwan o tunnel in october 1997, tai lam tunnel in june 1998 and lantau link in july 1998

    海底隧道和香港仔隧道在一九九三年八月裝設自動收費系統;獅子山隧道、東區海底隧道、大老山隧道和西區海底隧道,亦先後在一九九四年八月、一九九五年九月、一九九六年五月及一九九七年四月裝設自動收費系統。
  2. Automatic toll collection systems ( autotoll systems ) were installed at the cross - harbour and aberdeen tunnels in august 1993, lion rock tunnel in august 1994, eastern harbour crossing in september 1995, tate s cairn tunnel in may 1996, western harbour crossing in april 1997, shing mun tunnels and tseung kwan o tunnel in october 1997, tai lam tunnel in june 1998 and lantau link in july 1998

    海底隧道及香港仔隧道在一九九三年八月裝設自動收費系統;獅子山隧道、東區海底隧道、大老山隧道和西區海底隧道,也先後在一九九四年八月、一九九五年九月、一九九六年五月及一九九七年四月裝設自動收費系統。
  3. The fast lane of tseung kwan o road between the toll plaza of tseung kwan o tunnel and the slip road leading to kwun tong bypass

    介乎將軍澳隧道收費亭及接連觀塘繞道之間的一段將軍澳道快線;
  4. Wan po road between tseung kwan o tunnel road

    介乎將軍澳隧道公路與昭信路
  5. Operator of shing mun tunnels and tseung kwan o tunnel

    (大老山隧道之營辦商)
  6. The 900 - metre tseung kwan o tunnel, opened in 1990, links kowloon and the new town at tseung kwan o. it was used by

    將軍澳隧道連接九龍與將軍澳新市鎮,在一九九零年啟用,全長900米,年內平均每日行車量達
  7. The fast lane of tseung kwan o road southbound between the toll plaza of tseung kwan o tunnel and the slip road leading to kwun tong bypass

    介乎將軍澳隧道收費亭與觀塘繞道支路之間的一段將軍澳道南行快線。
  8. All vehicles coming from tseung kwan o tunnel heading for kowloon bay, mong kok and shatin directions via the kwun tong bypass will be diverted to the slip road leading to lei yue mun road

    由將軍澳隧道經觀塘繞道前往九龍灣、旺角及沙田的車輛必須改用鯉魚門道的支路。
  9. The five government toll tunnels and one bridge are aberdeen tunnel, cross - harbour tunnel, lion rock tunnel, shing mun tunnels, tseung kwan o tunnel and lantau link comprising tsing ma bridge, ma wan viaduct and kap shui mun bridge

    五隧一橋包括香港仔隧道、海底隧道、獅子山隧道、城門隧道、將軍澳隧道及青嶼干線(包括青馬大橋、馬灣高架道路及汲水門大橋)
  10. The five government toll tunnels and one bridge are aberdeen tunnel, cross - harbour tunnel, lion rock tunnel, shing mun tunnels, tseung kwan o tunnel and lantau link ( comprising tsing ma bridge, ma wan viaduct and kap shui mun bridge )

    五隧一橋包括香港仔隧道、海底隧道、獅子山隧道、城門隧道、將軍澳隧道及青嶼干線(包括青馬大橋、馬灣高架道路及汲水門大橋)
  11. The slip road linking the southbound carriageway of tseung kwan o tunnel road with the westbound carriageway of

    連接將軍澳隧道公路南行車路與寶順路西行車路的支路
  12. The 900 - metre tseung kwan o tunnel, opened in 1990, links kowloon and tseung kwan o new town. it was used by

    將軍澳隧道連接九龍與將軍澳新?鎮,於一九九零年
  13. The section of tseung kwan o tunnel road

    將軍澳隧道公路由其與將軍澳隧道的交界以南約
  14. The route passes through the tseung kwan o tunnel

    干穿越將軍澳隧道。
  15. Tseung kwan o tunnel - 3 flat toll

    將軍澳隧道-劃一收費3
  16. Chiu shun road roundabout to its junction with tseung kwan o tunnel road

    米處起,至其與將軍澳隧道公路的交界處止的北行車路
  17. Tseung kwan o tunnel

    大老山隧道
  18. From a point about 1100 metres south of its junction with tseung kwan o tunnel to its junction with

    米處起,至其與環保大道的交界處止的路段
  19. Replacement of toll field equipment at tseung kwan o tunnel, shing mun tunnels and lion rock tunnel

    更換將軍澳隧道城門隧道及獅子山隧道車輛繳費系統的設備
  20. The slip road linking the southbound carriageway of tseung kwan o tunnel road with the eastbound carriageway of

    連接將軍澳隧道公路南行車路與寶順路東行車路的支路
分享友人