tung chung line (mtr) 中文意思是什麼

tung chung line (mtr) 解釋

  • tung : n. 〈Chi. 〉桐。
  • line : n 1 線;繩索;釣絲;測深度用繩,捲尺。 a fishing line 釣魚線。 be clever with rod and line 會釣魚...
  • mtr : 材料試驗反應堆
  1. The nil will be an extension of the existing mtr tung chung line eastwards along the north shore of hong kong island to join up with the eastern half of the mtr island line ( isl ) at fortress hill

    北港島線是現有地下鐵路東涌線沿港島北岸向東延伸的部分,至炮臺山站與地鐵港島線的東半部連接。
  2. The north hong kong island line is an extension of the existing mtr tung chung line along the north shore of hong kong island to run through onto the eastern half of the existing mtr island line at fortress hill station

    北港島線是現有地鐵東涌線沿港島北岸向東的延伸,至炮臺山站與地鐵港島線的東半部連接。將軍澳線會延伸至天後站與港島線的西半部連接。
  3. Kowloon mtr exit a tung chung line ; or jordan mtr exit c tsuen wan line and walk heading towards the jordan ferry terminus

    地鐵九站c出口東涌線或地鐵佐敦站c出口荃灣線,朝佐敦渡輪碼頭方向前行。
  4. Passengers travelling from mtr tung chung line will be able to interchange onto the drl at sunny bay station

    乘客可乘搭地鐵東涌,在欣澳站轉乘迪士尼。
  5. The first passenger train on the kwun tong line of the mtr started operation in 1979. the mtr was subsequently expanded to include the tsuen wan line ( 1982 ), the island line ( 1985 ), the eastern harbour crossing rail tunnel connecting kwun tong to quarry bay ( 1989 ) and the tung chung line ( 1998 )

    地鐵觀塘線載客列車在一九七九年投入服務,其後,荃灣線、港島線、東區過海鐵路隧道(連接觀塘與?魚涌)和東涌線先後在一九八二、一九八五、一九八九和一九九八年通車。
  6. The 3. 5 - kilometre penny s bay rail link that connects a new yam o station on the existing mtr tung chung line to penny s bay where the hong kong disneyland is being built. construction started in july 2002 for completion in 2005

    竹篙灣鐵路線全長3 . 5公里,連接現有東涌線上新建的陰澳站與竹篙灣(該處現正動工興建香港迪士尼樂園) 。
  7. Passengers will be able to interchange between west rail and mtr tung chung line, which in turn links up with the entire mtr network

    西鐵美孚站亦將建有一條特設的行人通道與地鐵美孚站相連,以便乘客轉乘地鐵荃灣詠。
  8. From mei foo, it would take another three minutes to reach nam cheong station, where passengers could change over to the mtr tung chung line to get to central district

    從美孚站再花三分鐘便到達南昌站,乘客可在該站轉乘地鐵東涌線往中區。
  9. The mtr connects with the kcr east rail at kowloon tong station kwun tong line and with the kcr west rail at mei foo station tusen wan line and nam cheong station tung chung line travel passes

    地下鐵路設有多個轉駁站:九塘站觀塘線可轉九廣東鐵,美孚站荃灣線和南昌站東涌線可轉九廣西鐵。
  10. Mtr, consisting of kwun tong line, tsuen wan line, island line, tung chung line, airport express line, tseung kwan o line and disneyland resort line carried average daily passengers of about 2, 370, 000 in 2005

    地下鐵路包括觀塘線荃灣線港島線東涌線機場快線將軍澳線及士尼線。在2005年,地鐵平均每日載客量約為2 , 370 , 000人次。
  11. Sections of the mtr system also suffer from overcrowding at peak times e. g. along the nathan road corridor before opening of tung chung line in 1998

    地下鐵路某些部分亦在繁忙時間十分擠迫,東涌線在1998年投入服務之前,彌敦道沿線各站的情況便是一例。
  12. Sections of the mtr system also suffer from overcrowding at peak times ( e. g. along the nathan road corridor before opening of tung chung line in 1998 )

    地下鐵路某些部分亦在繁忙時間十分擠迫,東涌線在1998年投入服務之前,彌敦道沿線各站的情況便是一例。
  13. The ksl will run along the eastern side of the mtr tung chung line, turn to canton road near jordan road, and then join the east tsim sha tsui station at salisbury road

    九龍南線會沿地鐵東涌線的東側行走,並在佐敦道附近轉入廣東道,然後在梳士巴利道連接尖東站。
  14. Nam cheong is the interchange station with mtr tung chung line

    南昌是接駁地下鐵路東涌線的交匯站。
分享友人