  1. Using a vortex - flow drop shaft to convey water from a high level to a diversion runnel under the condition of high water - head and large discharge is a new kind of technology in the scheme of reusing a diversion tunnel as a discharge tunnel

    近年來,為解決高水頭、大流量導流洞改建泄洪洞的技術難題,旋流式豎井泄洪洞逐漸成為研究熱點之一。但迄今為止,該技術尚未得到推廣應用,其主要原因在於人們對豎井螺旋水流運動特徵缺乏足夠的了解和深入的研究。
  2. The application of tbm construction method in 7 tunnel of connection section of yellow river diversion project

    萬家寨引黃北干線1號隧洞出口段優化設計
  3. Origin and treatment of water - diversion tunnel down fall at xiawenyang waterpower station

    下溫洋電站引水隧洞塌方的成因分析與處理
  4. Structural analysis for the liner and surrounding rocks of diversion tunnel in jinping waterpower station

    錦屏二級水電站深埋引水隧洞襯砌及圍巖結構分析
  5. A slot was cut in the back plate of the double - foil shield to improve the flow field with air diversion method. the flow field and droplets trajectory near the shield are simulated in wind tunnel by fluent software to analyze the wake flow affecting the spray drift. from simulation, the improved shield spray in reducing drift is better than double - foil shield spray and conventional spray in six types of wind velocity

    本文採用導流法在雙圓弧罩蓋上開口,利用fluent模擬分析和比較罩蓋噴霧流場,並模擬該流場下的霧滴運動軌跡來分析霧滴的飄失性,模擬結果表明:結構改進后的罩蓋噴霧流場得到改善,其減少霧滴飄失的效果好於原罩蓋,更優于常規無罩蓋噴霧。
  6. Study on main engineering geology problems of baixi reservoir diversion project water conveyance tunnel in ningbo city

    不平衡報價法在大連引碧玉皇廟隧洞工程投標報價中的應用
  7. The structure of jinping cascade 2 hydropower station is a high - head and high discharge diversion tunnel with low crown gate

    錦屏二級水電站是一首部設低閘,採用長隧洞引水的高水頭、大流量的引水式電站。
  8. Abstract : through a series of hydraulic model tests for researching actual power tunnel operation, a conclusion is reached that in order to get a better flow pattern the profile of the wate - carrying structure should be adapted to the variation of water streamline shrinkage, flow velocity and pressure intensity. the configuration and dimension of the kinetic energy dissipator should be selected carefully to make the water tunnel safe and reliable at different levels of diversion dischage

    文摘:針對實際工程中的發電引水隧洞運行的各種工況進行了水工模型試驗研究,指明要獲得良好的水流流態,過水建築物各部位結構輪廓的造型應適應水流流線的收縮、流速及壓強的變化;為使引水隧洞在各級引水流量下能安全可靠地運行,需慎重確定洞內消能工的體形和尺寸。
  9. The main work is done with the help of model experiment. in the flood - relief experiment, the flood carrying capacity of spillway tunnel is checked. in the hydraulic experiment of the diversion power conduit system, the followings are studied : the flow condition and fluctuation in the surge chamber, the distribution of flow velocity before the rack in the surge shaft, the amplitude of stage in the quick gate bay etc. the test step, content and results of different proposals are introduced in details

    本項優化試驗研究的目的主要在於,通過泄洪系統整體水力學試驗,校核泄洪洞的泄流能力;通過發電引水系統整體水力學試驗,研究調壓井內水流流態和水位波動情況、調壓井內攔污柵前流速分佈情況;確定快速閘門井內水位波動幅度;試驗確定壓力管道水擊壓力穿井系數以及泄洪洞弧形門處的水壓力。
  10. The power station is diversion type power station of low gate dam with a normal storage level of 1268. 0 m, a highest gate dam level of 31 meters and a reservoir capacity of 2, 974, 000 cubic meters, the length of diversion tunnel of which is 19. 57 kilometers, installed capacity is 360mw futang power station is constructed on the basis of deep and thick overburden, the foundation of which mainly consist of five overburdens which, in general, belong to multiple, complex foundation

    福堂水電站位於四川省阿壩藏族羌族自治州汶川縣境內的岷江河段上,電站為低閘引水式開發。正常蓄水位1268 . 0m ,最大閘高31m ,庫容297 . 4萬m ~ 3 ,引水隧洞長19 . 57km ,裝機360mw 。福堂水電站閘壩建於深厚覆蓋層基礎上,基礎主要存在五大覆蓋層,總體屬于多層復雜地基。
  11. However the diversion tunnel is generally discarded after used, because the construction period of hydraulic power station is pressing, the lining standard of tunnel needs being improved and the up and down steam water level is difficult to be joined

    而導流洞在完成導流任務后,又往往因為工期緊,襯砌標準需提高,上下游水位銜接等困難而被廢置不用。
  12. Based on the moveable - bed model tests and some relative studies, it is found that the proposal reservoir for the hongshiyan hydropower station will be a heavy deposit reservoir, its sand - flushing sluice could not effectively de - silt and serious hidden - troubles exist in its diversion tunnel

    摘要待建的紅石巖水電站水庫屬嚴重淤沙型水庫,通過動床水工模型試驗和有關研究分析發現,其沖沙閘排沙效果不理想,引水隧洞存在進沙嚴重的隱患。
  13. The main buildings of resisting flood such as cofferdam and diversion tunnel without the capacity of flood control play a role in flood detention

    圍堰和導流洞作為渡汛的主要設施,其沒有調節洪水的能力,只能對洪水起到一定的滯洪作用。
  14. Construction of jinshao water diversion tunnel grouting

    金哨引水隧洞灌漿施工
  15. Application of smooth blasting technology in excavating the diversion tunnel of a certain hydroelectric station

    大量石方爆破的震動監測及控制
  16. Analysis of pressured diversion system with irrigation discharge branch tunnel of stone river reservoir

    石頭河水庫灌溉支洞對發電引水系統的影響分析
  17. In the south - to - north water diversion centre line, beijing west 4th ring road tunnel the waterproof design and operation, they use the construction experience of the urban subway of beijing for reference, adopt the compounding type and line with and build waterproof craft

    南水北調中線北京段西四環暗涵工程在防水設計與施工中,借鑒了北京城市地鐵的施工經驗,採用復合式襯砌防水工藝。
  18. During the construction of the concrete lining for the diversion tunnel of xiaowan hydropower station, the concrete linings for the sides and the crown of the tunnel are simultaneously placed by the integral steel shuttering trolley with the greatly shortened construction progress

    摘要小灣水電站工程在導流洞混凝土襯砌施工中,邊頂拱混凝土採用整體式鋼模臺車一次襯砌成形,大幅提高了施工進度。
  19. The horizontal swirling flow internal dissipater tunnel being built in gongboxia power station will be the first one reconstructed from a diversion tunnel whose discharge reaches to 1000m vs and water head is more than 100m in china. its scheme ' s argumentation, test research and future apply will have important meanings to the design. research and engineering application of internal dissipation discharge tunnel with swirling flow, will powerfully promote engineering application of this new kind of dissipation mode, which may solve some high velocity problems in high dam construction and provide a engineering example for technological and economical augmentation in a diversion tunnel reconstruction. it is of theoretical and practical importance to promote hydraulic structure researches and development

    公伯峽水電站右岸旋流內消能泄洪洞是國內第一個泄量達1000m s 、水頭超過100m ,即將修建的旋流式內消能泄洪洞,其方案的論證與試驗研究以及建成后投入使用,將在國內外旋流式內消能泄洪洞設計、研究與工程應用中具有重要的意義,將有力的推動這一新的消能形式在工程中的應用,從而為解決高壩建設中泄水建築物的高速水流問題與導流洞改建的技術與經濟問題提供工程實例,對推動與發展水工水力學的研究與發展均具有重要的理論與實踐意義。
  20. As a kind of important hydraulic structure, hydraulic tunnel is very useful at many aspects such as conveyance, diversion and flood discharge

    水工隧洞作為一種重要的水工建築物,在輸水、導流及泄洪等方面起著重要的作用。