tunnel effect element 中文意思是什麼

tunnel effect element 解釋
隧道效應元件
  • tunnel : n 隧道;地道;坑道;管道,煙道,風洞;【礦物】石巷,平峒。 tunnel warfare 地道戰。vt (〈英國〉 l...
  • effect : n 1 結果。2 效能,效果,效力,效應,作用,功效;影響。3 感觸,印象;外觀,現象。4 旨趣,意義。5 ...
  • element : n 1 要素;成分;(構成)部分;分子。2 【化學】元素;【數學】元,素;【機械工程】單元;單體;【無...
  1. Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports

    首先,在前人研究成果的基礎上,對錨桿與圍巖的相互作用機理進行研究,利用全長錨固錨桿的中性點理論,從等效均化的角度來考慮錨桿對圍巖的加固作用,並推導了在簡單荷載作用下,含有襯砌、等效加固后的圍巖、原始圍巖三者的彈塑性解析解,對工程設計有著重要的參考意義;在數值模擬方面,以考慮錨固圍巖滿足規則化庫侖摩擦模型為基礎,利用虛功原理推導了接觸問題的有限元方程的計算格式,為開發運用大型商用有限元軟體msc . marc提供了理論根據,也形成了本文的理論基礎:最後,論文以南水北調東線穿黃隧洞穩定性分析項目為工程實例,利用本文所述的接觸問題的摩擦模型理論,對錨桿支護結構的應力場、位移場的變化規律進行了研究,分析了加錨支護對隧洞圍巖應力、變形的影響。
  2. Obtain these chief research achievements. ( 1 ) the method of hydraulic fracturing, kaiser effect experiment and the finite element numerical simulation computation results, the direction of maximum horizontal principal stress intersect the small - angle of tunnel axial line, it is favorable to the stability of tunnel peripheral rock ; according to the test rust of field stress - relief method, at the present time, zhe gu mount tunnel have n ' t access to high crustal stress site, maximum principal stress magnitude is 17mpa ~ 20mpa

    主要獲得以下研究成果: ( 1 )綜合水壓致裂法、室內巖石kaiser效應試驗和有限元數值模擬計算研究成果,最大水平主應力方向與隧道洞軸線小角度相交,對隧道圍巖穩定性有利;根據現場應力解除法測試結果,目前鷓鴣山隧道尚未進入高地應力段,最大主應力量級為17mpa 20mpa 。
  3. Secondly, in view of the limitation and shortage of traditional simulation of finite element approaches for bolt, a new composite grouted bolt element including nonlinear contacting relation will be built based on the above study of the mechanics mechanism of fully grouted bolt. then, an elastic - plastic finite element program will be developed for the analyses of tunnel stability, in which the composite grouted bolt element and nonlinear finite element analysis method will be used ; the patterns and the affect of main design parameters on the support effect of bolt will be analysed using the program, and conclusions of guidance importance for tunnel support design will be drawn. finally, simulation compution for the excavation and support of a highway tunnel will be made out using the above production, and the method of application of the program will be discussed ; analysis of the deformation, stress and distribution of plastic range will be done, and rational support plan will be worked out, which is of guidance importance for tunnel support design and the thery and technique of fully grouted bolt used in tunneling will be perfected further

    首先,本文在綜合分析隧道穩定性影響因素及失穩破壞模式的基礎上,對全長粘結式砂漿錨桿作用力學機理進行了深入研究,為全長粘結式砂漿錨桿的有限元模擬分析奠定了基礎;其次,針對傳統錨桿有限元模擬方法的局限性與不足,在上述全長粘結式砂漿錨桿作用力學機理研究基礎上,建立出能反映界面非線性粘結的新型復合砂漿錨桿有限單元模型;然後,運用上述復合砂漿錨桿單元模型,引進非線性有限元分析手段,開發了隧道支護穩定性分析的有限元程序,並就全長粘結式砂漿錨桿的型式與設計參數對支護效果的影響進行了深入探討,得到了對隧道支護設計具有指導意義的結論;最後,運用本文研究成果對某公路隧道工程實例進行了開挖與支護的模擬計算,探討了其應用方法,並就隧道變形與應力及塑性區分佈規律進行了分析,從而提出了合理的支護方案,為隧道支護設計提供了參考依據,完善了隧道全長粘結式砂漿錨桿支護的理論與方法。
  4. Firstly, we make numerical modeling analysis with finite element method and eliminate the effect of tunnel - cavity, translate the apparent resistivity curve of advanced detection in tunnel into the curve in full space

    首先利用有限元數值模擬技術分析並消除坑道空腔對視電阻率的影響,並將坑道超前探測視電阻率曲線轉化為全空間視電阻率曲線。
  5. 2. the model experiment aimed at the aerodynamic effect of large high - speed landslides has been accomplished in wind tunnel laboratory for the first time. on the base of testing research, the paper studies different factor which influence the aerodynaxnic effect of flying 1andslide, and numerically simulates the aerodynamic effect with the help of the hydrodynamics finite element

    ( 2 )首次在風洞實驗室進行了針對大型高速滑坡凌空飛行階段空氣動力學效應的模型實驗,研究了影響飛行滑坡巖體空氣動力學效應的不同因素;應用流體力學有限單元法對飛行滑坡巖體的空氣動力學效應進行了數值模擬。
分享友人