tunnel section 中文意思是什麼

tunnel section 解釋
隧道斷面
  • tunnel : n 隧道;地道;坑道;管道,煙道,風洞;【礦物】石巷,平峒。 tunnel warfare 地道戰。vt (〈英國〉 l...
  • section : n 1 (外科、解剖的)切斷;切割;切開。2 【外科】切片,【金相】磨石。3 (果子的)瓣。4 【數學】截...
  1. The constructional technology in tunnel of great section wind drift sand

    公路大斷面風積砂隧道施工技術
  2. At first, on the basis of analyzing the structure of the freeway monitoring system, the paper puts forward systematic network structure ; secondly, it has analysed the composition and function of the montoring software. because this section of road conditions of freeway is very complicated, and there are a lot of tunnels along the freeway, in addition, the weather of some freeway sections is fogy. the system is divided into three subsystems in the function : the freeway section controlling, the fogy district controlling and the tunnel controlling ; thirdly, the main software of the freeway monitoring system is analysed and designed in the dissertation ; at last, the structure of procedure and user ' s interface are given, and the monitoring software of the freeway is implemented

    本文先從高速公路監控系統的體系結構入手,提出了系統的網路結構;其次,分析了監控軟體的組成和功能。由於該段高速公路路況復雜,沿線有多個隧道,部分路段還為霧區天氣。所以該系統從功能上劃分為三個子系統:路段監控、霧區監控和隧道監控;然後,對高速公路監控系統的部分軟體進行的分析和設計;最後,實現了高速公路監控系統的部分軟體,給出了主要的程序結構和用戶界面。
  3. The research test of this discussion as follows : making investigation and research to overseas related materials ; make investigation to built highways in desert areas, dozens of routes and nearly 100 road sections have been surveyed, among them two highways have been taken as the chief investigation objects, they are " 210 national highways - first grade highways from bao tou to dong sheng " and " the section of nei meng a la shan meng s307 from shang de to meng gen " ; the relationship between windblown sand drift and the roadred height wind tunnel test ; make investigation to the tested road sections and subengineerings then make statistics and study according to the test outcome ; the stability analysis of different roadbed height ; the analysis of roadbed economy

    本課題的研究工作包括:對國外相關資料的調研分析;對已建沙漠地區公路進行調查、觀測了十余條線路,近百段路段,以『 210國道包頭至東勝一級公路』 、 『內蒙阿拉善盟s307尚德至孟根段』為主要調查對象;風沙流路基高度的關系、風洞試驗;對調查路段及依託工程調查、觀測結果統計研究;不同高度下路基穩定性分析;路基經濟性分析;按照沙丘類型及公路等級提出路基合理高度推薦值。
  4. The application of tbm construction method in 7 tunnel of connection section of yellow river diversion project

    萬家寨引黃北干線1號隧洞出口段優化設計
  5. In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future

    本文結合重慶市大渡口區「三木花園」開發建設項目,從地下空間靜力結構穩定性分析角度出發,針對在該項目中涉及的高層和多層建築物以及在其地下20米處開挖了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體工程情況,採用2d - 3d -有限元結構分析程序對高層與多層建築物的地基基礎及其與城市軌道交通使用的地下隧道圍巖的應力與位移演變規律進行了有限元數值分析計算,探索了地下空間圍巖與高層或多層建築物地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層建築物狀態和地下開挖用於軌道交通的地下隧道狀態等三種不同狀態以及4個水平剖線和4個垂直剖線等不同情況,從以下幾個方面具體分析研究了計算斷面的應力與位移分佈規律: ( 1 )在各種不同狀態下計算斷面的主應力矢量圖、位移分布圖( ux 、 uy )以及應力等值線色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同水平與垂直剖線的應力_ 1 、 _ 2和_ ( xy )對比分佈曲線; ( 3 )不同狀態下相同水平或垂直剖線的應力_ 1 、 _ 2和_ ( xy )的對比分佈曲線等,為今後在對地下空間的開發利用以及在高層建築物地下開挖硐室時的工程設計和工程施工提供參考依據。
  6. The penstock for jinhe hydropower station is less in china, as it has a obliquity of 50 on the bending and inclined straight section in space ; for which the manufacture and installation are smoothly completed under the construction condition in the tunnel and the environment of alpine region with available construction method in combination of limited construction method for the key technical problems of the manufacture and installation of the penstock, which provides a reference for the constructions under the similar circumstance

    摘要金河水電站壓力鋼管的空間轉彎和斜直段的50傾角在國內是比較少見的,針對鋼管製造、安裝的技術難點,在高寒和復雜的洞內施工環境中,結合有限的施工手段,採取有效可行的施工方法,順利完成了製造、安裝任務,對類似環境下的施工提供了一定的借鑒。
  7. ( 2 ) taking the geology analysis as main way and combining the pre - test, predicating the tunnel ' s main geology condition ( rock quality, surrounding rock classification, long - wide joint, fault, ground water, crustal stress ), and predicating the main potential disaster ( collapse, breaking water, rockburst, large deformation ) ( 3 ) employing the stress test result and inverse analysis of the stress field, finding out the crustal stress " s distributing rule along the tunnel axes section : the highest crustal stress is 24mpa near the deepest spot, and predicting that the k2 + 260 ~ k3 + 000 likely to be the high crustal stress segment for this tunnel

    通過地質分析、類比分析、監控量測、數值模擬、神經網路等方法,對鷓鴣山隧道潛在的主要地質災害(塌方、涌水、巖爆和大變形)進行了預測預報( 3 )在現場地應力測試成果的基礎上,運用數值計算進行應力場反演,基本查明了沿隧道軸線剖面的地應力分佈規律:地應力量級在最大埋深附近達到最大值24mpa ,並預測k2 + 260 k3 + 000段將很可能成為鷓鴣山隧道的高地應力段。 ( 4 )塌方往往與斷層破碎帶及千枚巖相聯系。
  8. The entire hzmb is a 35km dual 3 - lane carriageway in the form of bridge - cum - tunnel structure comprising the 29km zhujiang section from the landing point at gongbei of zhuhai and a prola of macao to the boundary of the hksar, and the 6km hong kong section from the boundary of hksar to the landing point at san shek wan of lantau island. the project includes

    整條港珠澳大橋分為珠江和香港兩段,珠江段長約29公里,從位於珠海拱北和澳門明珠的大橋陸點至香港特別行政區區界,而長約6公里的香港段則由香港特區區界至位於香港大嶼山石灣的香港側陸點,工程范圍包括: -
  9. What ’ s more, this paper takes the effect of crown wall rock and mid - board foundation reinforced parametric variation on tunnel structure stress and stability into account grounded on building typical section model of i wall - rock sector

    另外,本文還通過建立類圍巖地段隧道典型斷面模型,分別考慮拱頂圍巖和中墻地基加固參數的變化對隧道結構受力和穩定性的影響。
  10. As regards the section of tunnels along salisbury road, it is necessary to construct it by the cut - and - cover method to avoid possible hazards to the adjacent buildings, the existing utilities and the very important mtr tsuen wan line tunnel along nathan road

    至於沿梳士巴利道的一段隧道,則有需要以明挖回填方式建造,以避免對毗鄰的建築物、現有的公用設施和沿彌敦道的一段極重要的地鐵荃灣線構成任何潛在的危險。
  11. Slow cooling section is next the fast cooling section, cooling tiles slowly by exchange heat between hot gas in the tunnel and the environment air, which is sucked into pipes stick in the tunnel and been heated there, and been sent to dryer to dry biscuits

    緩冷段不直接打冷卻風,它通過抽熱風機將環境空氣吸入,進入窯內導熱良好的鋼管,並將換熱后的熱空氣送入乾燥窯內,冷空氣在換熱過程中,使製品得到間接的冷卻,讓製品安全度過573的晶型轉換階段。
  12. Using the system designed in this thesis work, flow field calibration of the wind tunnel is accomplished, which covers dynamic pressure drop coefficient, dynamic pressure time stability, axial static pressure gradient, boundary layer, and degree of turbulence, etc. boundary layer measuring principle and method are especially described in detail, the relationship between boundary layer thickness, wind speed setting, and the depth of the experimental section is summarized, and finally the calibration data for th e model center zone under specific wind speed are given

    然後利用本文設計的系統完成了落差系數、動壓時間穩定姓、軸向靜壓梯度、邊界層及湍流度等內容的流場校測。特別對邊界層測量的原理及方法做了較詳盡的敘述,總結出邊界層厚度與設定風速、實驗段深度的關系,然後給出模型中心區一定風速下校正數值。
  13. Analysis on and countermeasures for collapse in weak ground section of huocheling tunnel

    火車嶺隧道軟弱圍巖段塌方分析及處理措施
  14. The research method is to complete different function module using the advantage of softwares combined with design characteristics of hydraulic tunnel section, and connect them with the method of mixed programming

    研究的方法主要是運用各種應用軟體的優點和長處,結合水工隧洞斷面設計的特點,完成不同的功能模塊,並將各個模塊通過混合編程的方法進行連接。
  15. The common methods of realization of visualization in scientific calculation are suggested in this paper, and the calculation example in engineering indicates that the visualization system of hydraulic tunnel section lining design is practical and steady

    本文論述了實現科學計算可視化的一般方法,並通過計算工程實例,證明了水工隧洞斷面襯砌計算可視化系統的實用性和穩定性。
  16. Based on review of hydraulic tunnel developments both domestic and abroad, the advance of computer aided design of the tunnel section lining is summarized, the visualization system of hydraulic tunnel section lining design is researched

    本文根據水工隧洞建設的發展需要,在分析和總結了目前水工隧洞斷面襯砌計算機輔助設計發展狀況的基礎上,研究了水工隧洞斷面襯砌計算的可視化系統。
  17. The theory and its calculated methods of tunnel section design is researched in this paper, including the foundation and methods of the choice of profile and line types, and value and distribution of load, and the common calculated methods of lining structure

    研究了水工隧洞斷面設計的理論及其計算方法,包括斷面選型和襯砌型式選擇的依據和方法,荷載的取值和分佈,襯砌結構常用計算方法的研究。
  18. Tunnel section laser distance measuring instrument

    隧道斷面測量儀中的激光測距
  19. Asymmetrical tunnel section

    不對稱隧道斷面
  20. This paper, focusing on the construction in the tunnel section with the worse geological conditions, discusses systematically the theory and the actual application on natm, and puts forward the proposal that the natural states of surrounding rock must be disturbed as small as possible and the self - loading of rock should be made full use of. as emphasizing the main point of the method the study of doing extensively the work of the measurements and the relevent analysis in the site takes up the much space in the paper

    本文針對不良地質地段的隧洞施工,系統論述了新奧法的理論和在工程實踐中的應用,提出了應盡可能少地擾動圍巖的自然狀況並充分利用圍巖自身承載力;重點是要在現場廣泛開展監測工作和相應的資料分析;然後根據現場的監測信息以及對圍巖的觀察和認識,對設計進行及時反饋,及時優化支護和施工參數用於和指導現場施工。
分享友人