tunnel work 中文意思是什麼

tunnel work 解釋
開挖隧道
  • tunnel : n 隧道;地道;坑道;管道,煙道,風洞;【礦物】石巷,平峒。 tunnel warfare 地道戰。vt (〈英國〉 l...
  • work : n 1 工作,操作,勞動,作業;工件;功課;努力;行為,作用。2 (待辦的)事務,業務;職業。3 〈前有...
  1. From our tunnel vision we can t always recognize good news from bad news, nor good luck from bad luck. " all things work together for good to those who love god and are called according to his purpose.

    耶穌基督親自為我們代求,讓我們能歡呼,無論我們的生活發生甚麼事身處任何境況,也能找到快樂,這是精神上的狀態。
  2. It saves several columns of calculating in the work-up since tunnel wall effect on the horizontal tail is then nonexistent.

    因為這時不存在洞壁對平尾的影響,所以數據處理工作量減小了。
  3. After the briefly present the origin and features of internet protocol version 6 ( ipv6 ), the paper detailedly introduced the conception, characters, security technologies of vpn, and main tunnel protocols used to implement and deploy vpns. after analyzing and comparing these technologies of realizing vpns, we choosed ipsec. then, the paper analyzed in the ipsec structure, function, work mode, and its components such as authentication header ( ah ), encapsulating security payload ( esp ), internet key exchange ( ike ), encryption and authentication algorithms, security association, security policy, and how they cooperate with each other in order to secure ip packages

    在簡要介紹ipv6協議的由來和優點之後,詳細闡述了虛擬專用網的概念、特點、安全技術及實現的關鍵隧道協議,通過對實現技術的分析比較,選用了安全性強大的ipsec隧道技術,接著深入研究了ipv6安全協議ipsec的體系結構、操作模式,詳細論述了ipsec協議簇的各個組成部分,如認證報頭ah協議、封裝安全載荷esp協議、密鑰管理ike協議、加密認證演算法、安全聯盟和安全策略等,以及這些組件之間如何協作,來共同實現對網路層ip數據包的安全保護。
  4. Using the system designed in this thesis work, flow field calibration of the wind tunnel is accomplished, which covers dynamic pressure drop coefficient, dynamic pressure time stability, axial static pressure gradient, boundary layer, and degree of turbulence, etc. boundary layer measuring principle and method are especially described in detail, the relationship between boundary layer thickness, wind speed setting, and the depth of the experimental section is summarized, and finally the calibration data for th e model center zone under specific wind speed are given

    然後利用本文設計的系統完成了落差系數、動壓時間穩定姓、軸向靜壓梯度、邊界層及湍流度等內容的流場校測。特別對邊界層測量的原理及方法做了較詳盡的敘述,總結出邊界層厚度與設定風速、實驗段深度的關系,然後給出模型中心區一定風速下校正數值。
  5. The main work is done with the help of model experiment. in the flood - relief experiment, the flood carrying capacity of spillway tunnel is checked. in the hydraulic experiment of the diversion power conduit system, the followings are studied : the flow condition and fluctuation in the surge chamber, the distribution of flow velocity before the rack in the surge shaft, the amplitude of stage in the quick gate bay etc. the test step, content and results of different proposals are introduced in details

    本項優化試驗研究的目的主要在於,通過泄洪系統整體水力學試驗,校核泄洪洞的泄流能力;通過發電引水系統整體水力學試驗,研究調壓井內水流流態和水位波動情況、調壓井內攔污柵前流速分佈情況;確定快速閘門井內水位波動幅度;試驗確定壓力管道水擊壓力穿井系數以及泄洪洞弧形門處的水壓力。
  6. At the same time, mining engineering that is a special work that digs for a tunnel relates to the body of the mountain and the mineral resources which are all irregular 3d solid. so, it is hard to use the traditional design making visualization and computer simulation for mining engineering

    同時,采礦工程是一種在山體空間進行的巖土開挖工程,該工程涉及的山體、礦藏均為不規則的三維實體,傳統的工程設計很難實現采礦工程的可視化和計算機模擬。
  7. As to the tunnels of jinping hydroelectric power station in sicuan province, the thesis discusses how to reasonably consider the initial stress field when designing a large - scale tunnel with high initial stress and deep buried. first, by analyzing of the rock lab tests and discusses the feature of regional geomorphology. explains the production of initial stress field, analyze the initial stress of jinping hydroelectric power station ; second, using the fem, the paper creates the real model of region. according to the results of stress measurement point, by combining of ann and fem to decide the boundary condition, the paper calculates the initial stress field ; at last, the paper analyzes the influence of the initial stress field formed from different condition on the deformation and stress of the surrounding rock, and the main factor to influence the initial stress. on the basis of the former work, the author proposes some proposals, which will be helpful for studying and designing of the similar undergroun d engineering

    首先從巖體的應力?變形的特性入手,並結合工程區域的地形地貌特徵,對巖體初始地應力場的形成做出解釋,結合錦屏水電站初始地應力的現狀提出了將地應力場進行分帶;然後建立整個工程區的實體模型,在地質分析的基礎上,以工程區右半部分為代表,參照實測點的初始地應力值,採用了神經網路與有限元相結合的方法反演了該區域的初始地應力場;最後模擬隧洞的開挖,通過計算比較分析了初始地應力場對處于不同應力帶內的隧洞圍巖穩定性的影響,在此基礎上提出了作者的建議,力圖為該類工程的研究設計工作提供有益的幫助。
  8. On december 10, 2001, work was completed on stage one of a major sewage tunnel system

    二零零一年十二月十日,凈化海港計劃的大型污水隧道系統第一期計劃竣工。
  9. On december 10, 2001, work was completed on stage one of a major sewage tunnel system the harbour area treatment scheme hats

    二零零一年十二月十日,凈化海港計劃的大型污水隧道系統第一期計劃竣工。
  10. Then the second chapter researches the principle of the ipsec, which provide security services through ah and esp protocols. both ah and esp can work under two working mode : transferring mode and tunnel mode

    Ipsec主要通過ah和esp來提供安全服務, ah和esp又分別可以工作在傳輸模式或隧道模式下,通過不同的配置可以滿足不同的安全需求。
  11. The maintenance and management work is abundant and meticulous. it is very important to study the maintenance and management of the tunnel to maintain management system and perfect the administrative skill of tunnel and guarantee the railway unblockedly

    其維修養護管理工作是龐大的、也是細致的,因此,研究其維修養護管理問題,以完善秦嶺隧道養護維修管理體制和隧道管理技術,保證線路暢通是非常重要的。
  12. They visited west rail work sites in tuen mun, yuen long, kam tin, long ping, and tsuen wan. they also visited tai lam tunnel and tsing tsuen tunnel to view the operation of the tunnel boring machine

    參觀的地點包括西鐵在屯門、元朗、錦田、朗屏及荃灣的工地,他們亦到了大欖隧道及青荃隧道工地參觀隧道鉆挖機的操作情況。
  13. " however, be that as it may, the young man made a tunnel, how or by what means no one knows ; but he made it, and there is the evidence yet remaining of his work

    「但是,不管它吧,那個年輕人挖了一條地道,至於如何挖的,用什麼工具挖的,誰都不知道,但他總算是挖成了,那邊還有新砌的石頭為證明。
  14. Synthetical evaluation of the main hazardous factors in tunnel outlet work by close - value method

    應用密切值法綜合評價隧道出碴作業主要有害因素
  15. Ng, now a principal investigator and was involved in the investigation then, explained : " some drivers liked to work on routes closer to their residences so that their families could bring them meals during breaks. some wished to drive on routes around upmarket residential areas or commercial districts because of the refined passenger pools. the most sought - after routes were the cross - harbour - tunnel routes

    曾經參與當年調查工作的首席調查主任吳炳國解釋:有些司機希望駕駛的路線鄰近自己的家,上下班方便,家人又可送飯送湯有些則喜歡行走高級住宅或商業區,因為乘客較為斯文有禮不過,最受歡迎是隧道巴士線,因為全部都是新車,行車時間短,還有半小時吃飯時間,較諸其他路線的司機只能在停站時才吃一口飯舒服得多而且更可賺超時補水。
  16. Investigation on radioactive level in the work place of an underground tunnel

    某地下坑道工作場所放射性水平調查
  17. Propose to develop track patrol and examine car, reduce the difficulty of the long tunnel patrol and daily check work

    提出了研製軌道巡檢車,解決長大隧道巡道及日常檢查困難的難題。
  18. Geological work and task in tunnel construction

    隧道施工地質工作及其任務
  19. The main work and innovation of the dissertation are listed as follows. 1. a new nat users - orinted ipv6 tunnel mechanism named silkroad is proposed

    論文的主要工作和創新點如下: 1 .提出了一種新的面向nat用戶的ipv6隧道技術,稱之為silkroad 。
  20. Construction process and quality inspection for bolting and shotcrete work of fengling tunnel

    隧道錨噴支護施工工藝及質量檢驗
分享友人