turning length 中文意思是什麼

turning length 解釋
車削長度
  • turning : n 旋轉,轉動;轉向;彎曲;轉彎處;鏇制[車削]工藝;鏇坯;〈pl 〉鏇屑;製作。 take the first turnin...
  • length : n. 1. 長,長度,長短。2. (時間的)長短,期間。3. (賽艇的)一艇的長度;一馬的長度。4. 程度,范圍。5. 【板球】球程;投至適當距離的球。6. 【語言學】音長。7. 一段,一節。
  1. The design point of the designed forebody / inlet is flight mach number m = 6 and flight attitude h = 25km. the three - ramp, mixed external and internal compression hypersonic / inlet is chosen as representative geometry to be designed. nine types of hypersonic / inlet model with difference forebody length and total turning angle are obtained that the incidence angle of the first ramp and height of isolator are given

    根據飛行任務要求,以飛行馬赫數6 ,飛行高度25km為設計點,給定前體預壓縮角、隔離段高度,對具有不同前體長度和不同總壓縮轉角的帶隔離段的前體進氣道進行了設計。
  2. With account for the effect of temperature and shock - boundary layer interaction, the forebody / inlet with plane lip and wedge lip are designed by using the design methods of constant shock wave intensity and constant shock wave angle. in the design, the incidence angle of the first ramp, height of isolator, length of forebody and total turning angle of the designed forebody / inlet models are given

    另外,根據優選結果,給定前體長度、前體預壓縮楔角、總壓縮轉角及隔離段高度,分別用等激波強度和等激波角度的方法設計了唇口平直和唇口帶楔角的前體進氣道。
  3. At the time of the fukien incident, two months after the commencement of our fifth counter - campaign, the main forces of the red army should undoubtedly have thrust into the kiangsu - chekiang - anhwei - kiangsi region, with chekiang as the centre, and swept over the length and breadth of the area between hangchow, soochow, nanking, wuhu, nanchang and foochow, turning our strategic defensive into a strategic offensive, menacing the enemy ' s vital centres and seeking battles in the vast areas where there were no blockhouses

    第五次反「圍剿」進行兩個月之後,當福建事變出現之時,紅軍主力無疑地應該突進到以浙江為中心的蘇浙皖贛地區去,縱橫馳騁于杭州、蘇州、南京、蕪湖、南昌、福州之間,將戰略防禦轉變為戰略進攻,威脅敵之根本重地,向廣大無堡壘地帶尋求作戰。
  4. Extension of temporary banning of turning movement of vehicles exceeding8 metres in length on argyle street onto forfar road, kowloon city

    延長九城亞皆老街往科發道臨時禁止長度超逾8米車輛轉向的實施期限
  5. Extension of temporary banning of turning movement of vehicles exceeding 8 metres in length on argyle street onto forfar road, kowloon city

    延長九城亞皆老街往科發道臨時禁止長度超逾8米車輛轉向的實施期限
  6. The total area of the corporation covers about 200 chinese acres and the length of coastline is about 1, 140 meters, the auxiliary facilities have taken shape the main facility and the equipment include the 30, 000 dwt dry dock which is 192 meters long by 40 meters wide the gate width 32 meters and 10 meters deep, is to date the biggest dry dock in fujian province ; one fitting wharf length 65 meters, width 17 meters ; 16 tons portal crane 1 set, 16 tons gantry crane 1 set, mobile cranes 50t1 25t1 12t2 8t4 and other necessary transportation, coatings, the precision work equipment supplying air 120 m min, spraying grit more than 4, 000 m day, renews the steel plate 12 15 t day we can finish repairing all kinds of ships under 40, 000 dwt within 7 to 10 days our corporation obtains the first - class dockyard to repair and build steel - made ships lisence in 2001, passed the national environmental protection appraisal in august 2002, was designated shipbuilding in fujian for maintaining foreign ships in octobet 2002, the dry dock, passage channel, the turning area, fitting wharf are passed by passage safety appraisal in march, 2003

    主要設施和設備有: 3萬噸級干船塢一座長192米寬40米塢門凈寬32米深10米是福建省目前最大的干船塢舾裝碼頭一座長65米寬17米16噸門座起重機1臺10噸門吊1臺汽車吊8臺50噸1臺25噸1臺12噸2臺8噸4臺以及與其相配套的運輸噴塗精加工設備。每分種供氣120立方米,日噴砂面積4000多平方米,日換鋼板15 20噸。一般修船工期為7 10天。
  7. Pull the slip board, up distance switch to loosen, the film motor starts turn to move after receive the signal, turning to schedule length, pass the sense switch control film electrical engineering automatically stop, put the cup into the bottom slip mold, then push to go into, next circulation beginning

    拉出下模滑板,上行程開關松開,膠模電機接到信號后開始轉動,轉過預定長度,通過電眼控制膠膜電機自動停止,將膠杯放入下模滑板,再推入,下一個循環開始。
  8. Extension of temporary banning of turning movement of vehicles exceeding 7 meters in length on ngan hon street, to kwa wan

    延長土瓜灣銀漢街臨時禁止長度逾7米車輛轉向
  9. Stitch regulation and reverse stitching : simply by turning the stitch regulator thumb screw and adjusting feed reversing handle, you can easily sew stitches of desired length or reverse stitshing

    針距選擇及倒縫:調節針距,只用轉松固定螺釘,發動指示桿,即可縫紉不同疏密的針距或倒縫。
  10. Temporary banning of right turning movement for vehicles exceeding 7 metres in length from bonham strand into hillier street, sheung wan

    臨時禁止長度超逾7米車輛由上環文咸東街右轉入禧利街
  11. The kinematic performance of the macpherson suspension on a real vehicle is studied, and the changes of the front wheel alignment and the motion of the front wheel in the longitudinal and the transversal directions are figured. based on the requirements of general layout, a constrained optimization design model is set up with the steering cross rod ball joint position as the optimization variables ( design parameters ), and the sum of steering cross rod length interference while the left front wheel turning and bouncing as the objective function. and the optimization results are worked out by programming on computer

    針對一種實際車型上的麥弗遜式懸架,計算分析了轉向輪跳動時前輪定位角和車輪橫向、縱向滑移量的變化情況,並根據實際車型上麥弗遜式懸架的空間布置要求,建立了以轉向橫拉桿斷開點空間位置坐標為優化變量,轉向橫拉桿斷開點空間布置坐標可變化范圍為約束條件,車輪轉向和跳動時轉向橫拉桿長度干涉量為目標函數的約束優化設計模型。
  12. Temporary banning of turning movement for vehicles exceeding 8 metres in length on

    米車輛轉向:所有車長超逾
  13. All vehicles exceeding 7 metres in length will be prohibited from turning left from

    米車輛轉向:所有車長超逾
  14. Machine tools ; lathes of high accuracy swing up to 500 mm, turning length up to 1500 mm, acceptance conditions

    機床.高精度車床.旋轉直徑至500mm .車床中心距至1500m
  15. During the course of design and construction of highway, for the purpose of length, turning radius and longitudinal gradient, we have to construct a lot of high slope engineerings. so the slip of roadbed ' s slope often happen

    在公路的設計、建設過程中,為滿足直線長度、轉彎半徑及縱坡的坡度等要求,不得不劈山填谷,從而形成大量的高邊坡工程。
  16. Vehicles exceeding 7 metres in length will be banned from turning left from lung mun road westbound onto ho suen street southbound

    米的車輛將禁止由門路西行左轉入浩船街南行。
  17. Extension of temporary banning of turning movement of vehicles exceeding 7 metres in length on hampshire road, kowloon tong

    延長九塘衡州道臨時禁止長度逾7米車輛轉向的實施期限
  18. Opening of right turning movement for vehicles not exceeding 5 metres in length from connaught road west into water street, western district

    長度不超逾5米的車輛可以由西區干諾道西右轉入水街
  19. Temporary banning of turning movement of vehicles exceeding 8 metres in length

    九城喇沙利道往太子道西臨時禁止長度超逾
  20. Temporary banning of turning movement of vehicles exceeding 8 metres in length on la salle road onto prince edward road west, kowloon city

    九城喇沙利道往太子道西臨時禁止長度超逾8米車輛轉向
分享友人