two-slope surface 中文意思是什麼

two-slope surface 解釋
菱形翼型翼面
  • two : n. (pl. twos)1. 兩人;兩個東西,一對。2. 二的記號。3. 兩點鐘。4. 兩歲。n. -ness
  • slope : n 1 傾斜,坡度;坡,斜坡,斜面;【印刷】斜體。2 【軍事】掮槍的姿勢。3 【數學】斜率。4 【礦物】斜...
  • surface : n 1 表面;地面;水面;廣場,空地。2 外觀,外表,皮毛。3 【幾】面;切口;【航空】翼面。adj 表面的...
  1. Disigning coolant channel on the firebox of liquid rocket engine to loxodrome ( equal - angle helix ) groove can improve firebox coolant capability greatly. because the width dimension of loxodrome groove is narrow and the depth is deep, some machining methods are incapable, such as end - milling or electrochemistry. according to the peculiarities, a cnc disk - cutter - milling method which is composed of five motion axes with four simultaneously interpolated ones is researched. because most firebox generatrix is composed of complex curves, it is very difficult to get cnc cutting program with manual means. in order to deal with the problem, the loxodrome mathematics model is studied, and an auto - programming software system is developed. the software system can generate cnc cutting program of loxodrome on many kinds of turned surface. the constriction - distension segment of firebox is the most representative workpiece. the sharp changing of its generatrix slope makes loxodrome milling difficult. with the theory analyzing and practice cutting experiment, some applied techniques, which include milling mode and direction, choosing cutter diameter and cutting start point setting, are developed. adopting the technology above, tens regular workpiece have been manufacturing. the two - year manufacture practice has confirmed the validity and feasibility of developed loxodrome coolant channel milling method. the developed technology is also worth to be referenced to other similar workpiece

    將液體火箭發動機燃燒室的冷卻通道設計為斜航線(等傾角螺旋線)槽形,可以大幅度改善燃燒室的冷卻性能.斜航線冷卻槽的槽寬尺寸較小而槽深尺寸較大,所以無法使用棒銑刀銑削、電化學等加工方式.針對這些特點,提出了五軸控制、四軸聯動的數控片銑刀銑削加工方法.由於燃燒室外表面的母線輪廓復雜,手工編制數控加工程序難度大.為了解決數控加工程序的編制問題,研究了斜航線的數學模型,開發了自動編程軟體系統.使用該系統,可以生成多種母線輪廓回轉體外表面上的斜航線數控加工程序.燃燒室收斂-擴張段的母線斜率變化大,加工難度大,是斜航線冷卻通道加工的最典型工件.經過理論分析和實際切削實驗,研究了針對該類型工件的片銑刀直徑選擇、銑削方式和方向、刀具調整和起刀點的設置等多項實際的加工方案.採用上述的一系列技術,已經成功地加工了數十個合格工件.經過兩年多的實際生產過程應用,驗證了所開發的斜航線冷卻通道加工方法的正確性和可行性.這些加工技術的研製成功,對其他相似類型零件的加工亦具有參考意義
  2. ( 2 ) according to the forming model of the deep pull cracks, they can be divided into three classes pulled cracks -, pressed cracks and sheared cracks. ( 3 ) based on the two - dimensional and three - dimensional finite element methods. the following results can be affirmed : in the slope excavating process, the base surface will rebound in the direction of the excavating surface ' s excerior normal. the maximal displacements of the left and right bank are + 3. 6cm and + 2. 4cm ; the arch abutment will rebound in the direction of the river valley, the maximal displacements of the two bank are + 3. 5cm and + 2. 2cm ; the upstream and downstream surface will rebound in the direction of the normal direction. the maximal displacements are + 2. 1cm and + 1. 7cm. ( 4 ) the natural slope is stable

    ( 3 )通過二維及三維有限元分析得知,左右岸拱肩槽邊坡在開挖過程中,開挖底面主要表現為朝開挖面外法線方向發生回彈,左右岸最大位移量分別為+ 3 . 6cm 、 + 2 . 4cm ;拱端面主要表現為向河谷方向發生側向回彈,左右岸最大位移量分別為+ 3 . 5cm 、 + 2 . 2cm ;上下游坡面主要表現為向臨空方向的回彈,左右岸最大位移量分別為+ 2 . 1cm 、 + 1 . 7cm ;開挖使巖體產生由卸荷回彈導致的傾倒拉裂現象。
  3. It is concluded : the determination of the center spacing may be conducted under the permissible elevation of the exit line of seepage surface on slope surface downstream. in the end, the author has analysed the seepage field what the holes are placed two rows along the slope height

    另外,在對比多種孔距的方案分析結果的基礎上,得出結論:排水孔孔距變化對邊坡滲流場沿邊坡走向方向水頭分佈影響明顯,布設排水孔應根據目標降深確定排水孔孔距。
  4. According to the special surface structure and actualities that the city is extending along the transportation line and river region because of the restriction caused by the mountains in the two sides of every cities in qingyang. the author thinks it is not good to squeeze out the existence of cave dwellings during the course of urban construction, and it is necessary to emphasize the symbiosis between urban and cave dwellings. the author conceives that it is feasible to develop group - dwellings in the steep - sides of mountain and especially to adapt to constructing " climb - slope cave dwellings which are covered with earth "

    根據慶陽特殊的地表結構和城鎮發展受兩側山體限制而沿交通線與川區無限蔓延的現狀,筆者認為在慶陽城鎮建設中不應完全排擠窯居的存在,而是要強調城鎮與窯居的共生,並設想充分利用兩側陡坡地帶發展居住組團模式,建設新型「爬坡式覆土窯洞」建築群落,這種「城鎮型窯洞」可作為城鎮建設空間橫向的延續和拓展,防止城鎮呈線狀無限蔓延的畸形發展態勢;提倡運用現代科學技術對傳統窯洞民居進行改造與創新,要加快新式窯居的試點建設;建議積極開發慶陽窯洞旅遊資源,並提出了「窯洞地產」和「綠色窯洞產業」的全新概念。
  5. Electro - optical curves for lc cells have been analyzed and it has been shown mat a large attenuation range and a shallow attenuation slope can be achieved simultaneously for a variable optical attenuator based on a parallel - aligned lc cell with an appropriate surface anchoring strength. as compared with the existing liquid crystal - based voa structure ( using two cascaded lc cells with a particular material ), the present structure is simple and has no special requirement for the lc materials

    提出了基於弱錨定平行排列液晶盒的可變光衰減器(衰減范圍大、衰減曲線下降平緩以保證調節精度) ,與己有液晶型可變光衰減器結構(選用特定液晶材料、兩個液晶盒級聯結構)相比較,本論文提出的基於弱錨定平行排列液晶盒的可變光衰減器結構簡單,同時對于液晶材料無特殊要求。
  6. Accordring to basic concept and assumes essentially on the basic of sweden method of slices, be living below the maximum equilibrium state, the function expression about stability safety homogeneous slop is deduced, and the slope surface is consist of two lines and an arc, afterwards according to analysis theory of minimal value ruling on the basic of the maximum, genetic algorithm is applied to slove the dangerousest slide situation and radius and corresponding safely factor

    根據瑞典圓弧法的基本概念和基本假定,在極限平衡狀態下,推導了兩直線段均質斜坡穩定性安全系數函數表達式,然後根據極限分析理論的極小值原理,利用遺傳演算法,求出了邊坡穩定性安全系數極小值,並得到最危險滑動面的滑弧半徑和滑弧中心坐標。
  7. Circle slices method, with its simple principle and brief formula, is still popularly applied in assessment of earth slope stability. however, it exists two aspects of weakness in practical application. the first is difficult to search the most possible sliding surface ; the second is complicated to deal with slices

    圓弧條分法目前依然是工程中常採用的土坡穩定性分析方法,其原理簡單,公式簡潔,但在具體應用時,存在兩方面的困難:一是潛在滑動面不易確定;二是分條使計算過程較為復雜。
  8. With the help of this program, this paper does research on the moved backwards of the slide surface, lengthening the anchor section, the soil nail ' s total force, gets conclusion about relations between the soil nail ' s length and the slope ' s grade, height, soil ' s mechanical parameter ; relations between soil nail ' s total force and coulomb soil pressure. with the help of the large multiuse finite element program ansys, this paper analyzes the soil nailing in one - step ' s slopes, in two - steps " slopes, puts the emphasis on the axis force ' s distributing along the soil nail at each rows, the effect of both the excavating mode and the original slope figure to the axis force of the soil nail, the one another effect between the upper - step slope and the nether - step slope in the soil nail ' s axis force, gets conclusion about the design of soil nail at the first low, different slope body is the same with different excavating mode, the original slope figure has more effect to some than others because of the slope body, the reasonably design of the step width in two - steps slopes, the two - steps excavating and retaining has more virtue than the one - step ' s. through soil pressure analysis this paper does research on the differences and the links between the coulomb soil pressure theory and the rankin ' s, the vertical pressure at the slope surface when the slope surface is inclined and the retaining wall is rough, the soil pressure ' s distributing behind the panel, gets conclusion about the effect of both the slope body inner stability and the slope surface local stability to the soil pressure

    通過分析比較,論證了對數螺旋線型比圓弧形作為邊坡的假設滑裂面具有較多的工程優點,並為此編制了一個採用極限平衡法分析土釘支護的fortran語言程序,以此作工具對滑裂面的后移、土釘錨固段的超長、土釘總力的大小等方面作了研究,得出了有關土釘的長度與邊坡的坡角、坡高、土體力學參數的關系、土釘總力與庫侖土壓力間的關系等結論;採用大型通用有限元數值分析程序ansys分別對採用土釘支護的一階邊坡、二階邊坡進行分析,重點是研究各排土釘的軸力分佈規律、開挖方式及原始邊坡形態對土釘的軸力的影響、上下階邊坡在土釘軸力方面的相互作用,得出了有關第一排土釘的設計問題、不同類型的土體應適用於特定的開挖方式、原始開挖出的邊坡形態對一些類型坡體的邊坡土釘支護有較大的影響而對另外一些影響不大、二階邊坡臺階寬度的合理確定、二階開挖及支護比一階時具有較多的工程優點等結論;通過土壓力分析對朗肯、庫侖兩種經典土壓力理論的區別與聯系、坡面傾斜及墻背有摩擦時的坡面豎向應力分佈、面板背土壓力的分佈形態作了研究,得出了邊坡支擋土壓力受坡體內部穩定與坡面局部穩定兩個方面的影響、土釘支護面板背土體中卸荷拱的存在對面板受力有利等結論。
  9. Multiple scattering from two - dimensional rough surface with large surface root mean square ( rms ) slope is studied with kirchhoff approximation

    摘要利用基爾霍夫近似研究了表面均方根料率較大的二維粗糙面的多次散射問題。
  10. Abstract : a path searching algorithm using contour is presented to obtain the shortest path between two points on a curved surface under the slope constraint

    文摘:給出了一種基於等高線求解坡度約束下曲面上兩點間最短路徑的搜索演算法。
  11. Two - dimensional and three - dimensional stability analyses under pressure on top surface of slope

    坡頂壓力下邊坡的二維與三維穩定分析
分享友人