underground boring 中文意思是什麼

underground boring 解釋
井下鉆進
  • underground : adj 1 地(面)下的。2 隱蔽的,秘密的。3 (電影,報刊等)標新立異的,試刊的,試驗性而非正式的。4 ...
  • boring : n. 1. 穿孔,鉆孔;鏜削;地質鉆探。2. 〈pl. 〉 鏜屑,鉆屑。adj. 鏜(鉆)孔的。adj. 令人厭煩的,無聊的,無趣的。 boring people 令人討厭的人。
  1. To minimize worsening of traffic congestion and taking environmental and visual concerns into consideration, most mrt system routes in metropolitan areas are underground. except for those stations and crossovers where wide ranging areas are involved, the tunnel boring machine is usually applied

    此部份路線設置三個車站,分別位於信義計畫區南北側及中心地帶,南北二站分別與高運量捷運信義線、南港線銜接,主要在於服務信義計畫區之大量旅次。
  2. 3. 3 in particular, the potential hydrological problems caused by tunnel boring operation and portals construction may impose significant impacts on the underground hydrology of long valley

    3 . 3鉆挖隧道及興建隧道口仍可能對?原地下水水文造成損害。
  3. To minimize worsening of traffic congestion and taking environmental and visual concerns into consideration, most mrt system routes in metropolitan areas are underground. except for those stations and crossovers where wide ranging areas are involved, the tunnel boring machine is usually applied. conventional tunnel boring was first adopted in 1818 in london, but at that time was only used on a one - line circular tunnel basis

    為減少對交通之沖擊及環境之影響,一般于都會區大眾捷運系統之路線劃皆以地下化為主,而整條路線除大面積開挖之地下車站及轉轍段外,其餘皆以潛盾隧道工法作為設計之主要考量。
  4. In particular, the potential hydrological problems caused by tunnel boring operation and portals construction may impose significant impacts on the underground hydrology of long valley

    隧道的鉆探工程及出入口建築工程更可能產生水文問題,如導致地下水位產生變化,對?原的水文造成嚴重的影響。
  5. In this paper, it is studied and analyzed characteristic of stress, distortion etc. of pipe liner structure combining dahuofang transport water tunnel practice project, tunnel boring machine construction, and it is considered that affects internal force of pipe liner for early stress of underground structure and digging load. in nonlinear finite element calculation model, folium cells have been simulated among pipe liner and pipe liner and wall rock. under varies load condition, it has educed that changing rule of stress, distortion and load characteristic pipe liner in kinds of wall rock tunnel by analysis and calculation

    本文結合實際工程,分析研究了大夥房水庫輸水隧道工程在採用掘進機施工方法的情況下,利用管片襯砌的結構應力、變形等受力特性,考慮地下結構初始應力和開挖荷載對襯砌內力的影響,採用薄層單元模擬襯砌管片之間、襯砌管片與圍巖之間的非線性有限元計算模型,通過分析計算得出不同荷載工況下各類典型圍巖段隧道襯砌管片受力特徵、應力和位移變化規律。
  6. The influence of specific charge, hole arrangement, charge structure, stem length, millisecond interval and ignition mode on the yield of the blasted boulder is analyzed some measures to lower boulder yield in deep hole blasting of underground mine are presented through the optimization of blasting operation parameters as follows : lowering deep hole blasting effect of geology structure, rationally determining specific charge, using technique of wide - space small burden blasting, technique of manifold charge structure and technique of millisecond compression blasting, strengthening the management of boring construction and blasting construction

    該優化技術措施主要有:減少地質構造對深孔落礦的影響,合理確定炸藥單耗的方法,使用大孔距小抵抗線落礦技術,採用多種裝藥結構技術,採用多排微差起爆技術,加強深孔的施工管理和加強爆破施工的現場管理。
分享友人