underground thermal water 中文意思是什麼

underground thermal water 解釋
地下熱水
  • underground : adj 1 地(面)下的。2 隱蔽的,秘密的。3 (電影,報刊等)標新立異的,試刊的,試驗性而非正式的。4 ...
  • thermal : adj. 1. 熱的,熱量的,溫熱的;由熱造成的。2. 溫泉的。n. 【航空】上升暖氣流。adv. -ly
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  1. A new type system which water source heat pump ( wshp ) cascadedly uses water from underground different thermal storable aquifers is put forward in different season

    摘要提出的異層儲能型地下水源熱泵系統綜合了異層井組合採灌、季節性儲冷和水源熱泵串聯三種技術,為實現地下水的大溫差利用提供了可能。
  2. Abstract : based on 1 50 000 high - precision aeromagnetic data of 1996 and consulting other geophysical and geological data, this paper has analysed the framework of basement structure and fault structure and, in particular, probed into the relationships of aeromagnetic field characteristics, basement structure and fault structure to the distribution of underground thermal water. on such a basis, the paper also makes a preliminary analysis of the prospects of underground water in this area

    文摘:以1996年1 5萬高精度航空磁測資料為基礎,參考其它地球物理及地質資料,對山東黃河口地區基底構造、斷裂構造格架進行了分析,尤其是探討了航磁場特徵、基底構造、斷裂構造與地下熱水分佈的關系,在此基礎上對本區的地熱水遠景進行了初步的分析。
  3. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡水電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。
  4. This experiment include many contents, in a word, that is summer condition experiment, winter condition experiment > summer - winter transition condition experiment and winter - summer transition condition experiment, furthermore summer condition experiment still include flux changing experiment and winter condition experiment still include thermal balance experiment this article dealt with the data of the test, calculating out energy absorbing ( energy discharging ) of buried pipe in winter condition ( summer condition ), input power of heat pump x heat exchanging of piece buried pipe length x co - efficiency performance ? op ( energy efficiency rate ? er ) and average heat exchanging coefficient ; in additiont this article compares the inlet water temperature and outlet water temperature of underground the first layer and the second layer buried pipe when heat pump was running, the results are that the heat exchanging ability of the second layer buried pipe outgos the first layer buried pipe, and heat exchanging is more stable ; and still analyse earth temperature resuming in the transition season. the results are earth temperature resume fast in the first week when the heat pump runs off

    本文測試內容相當多,概括地說就是四個工況的測試,即夏季製冷工況的測試、冬季供熱工況的測試、夏?冬過渡季測試和冬?夏過渡季測試;另外在夏季工況的測試中還進行了變流量測試,在冬季工況的測試中還進行了熱平衡測試。本文對測試數據進行了處理,計算出了冬(夏)季工況埋管吸(放)熱量、熱泵空調器供熱量(製冷量) 、熱泵空調器輸入功率、埋管單位管長換熱量、供熱性能系數(製冷能效比)和平均傳熱系數等;另外,還比較了熱泵運行時地下一二層埋管進出水溫度變化情形,得出地下二層埋管換熱能力優于地下一層埋管,且換熱很穩定;並分析了過渡季地下一二層埋管溫度恢復情形,得出熱泵系統停機一周內地溫恢復特別快。
  5. In this paper, basing on the data analysis and stimulating analysis of the concrete liner of the water diversion tunnel of the underground hydropower station in the right bank of the tgp, the distribution and influential factors of the thermal - creep stress of thick concrete liners with big diameters in the tgp are studied. the following several problems have been solved : 1

    本文基於三峽工程右岸地下電站引水洞襯砌混凝土施工期監測資料和模擬計算分析,探討了三峽工程中大洞徑、厚襯砌混凝土在當前施工工藝下施工期溫度應力的分佈規律及影響因素,全文主要進行了以下幾個方面的工作: 1
  6. Based on the regional geological, hydrogeological, geophysical and geochemical prospecting and geothermal information, the forming background and bearing conditions, laws and features of thermal underground water are analysed, which will be the bases of further research, exploration and development of the thermal underground water in weihe basin

    在充分收集區域地質、水文地質、物化探及地熱資料基礎上,通過對斷裂構造特徵的研究,分析了渭河盆地地熱資源的形成背景、賦存條件、分佈規律及特徵,為進一步研究、勘探及開發地熱資源提供了依據。
分享友人