underground transport 中文意思是什麼

underground transport 解釋
地鐵交通運輸
  • underground : adj 1 地(面)下的。2 隱蔽的,秘密的。3 (電影,報刊等)標新立異的,試刊的,試驗性而非正式的。4 ...
  • transport : vt 1 運輸,運送,輸送。2 【歷史】處流刑,流放。3 殺死。4 〈常用被動語態〉使心情極度激動,使欣喜若...
  1. Underground mine rope haulage monorail transport system

    煤礦井下鋼絲繩牽引單軌吊車
  2. Development of the trackless auxiliary transport in the underground mine

    地下礦無軌輔助運輸的發展
  3. No marked nitrate pollution in the groundwater was found, mainly because the nitrate transport to underground water was impeded by the heavy clay soil

    地下水中的硝態氮污染現象不顯著,主要由於土壤質地黏重,阻礙了硝態氮向地下水中的運移。
  4. It ' s used in coal mine underground for transport of coal and chemical material

    用途:煤礦井下及其它易燃煬合輸送煤炭、化工材料類物料。
  5. Application of plc in underground transport signal system

    可編程序控制器在煤礦井下電機車運輸信號系統的應用
  6. Rail transport - passenger cars for underground mining - part 1 : specifications

    軌道運輸.地下采礦用乘用車.第1部分:規范
  7. The high island water system had a transport network that included numerous underground tunnels, in total 25 miles long, with diameters of 10 to 13 ft. the main water tunnel was 74, 000 ft. long ( 14 miles ), beginning at pak tam chung, near high island, and going through the sai kung peninsula and tai wan to reach the sha tin treatment works

    萬宜水庫的輸水網路包括了多條直徑10至13尺、共長約25哩的輸水隧道,隧道主線長74 , 000尺( 14哩) ,由萬宜水庫北潭湧起,橫越整個西貢半島,經西貢大環至沙田濾水廠。
  8. In this paper, it is studied and analyzed characteristic of stress, distortion etc. of pipe liner structure combining dahuofang transport water tunnel practice project, tunnel boring machine construction, and it is considered that affects internal force of pipe liner for early stress of underground structure and digging load. in nonlinear finite element calculation model, folium cells have been simulated among pipe liner and pipe liner and wall rock. under varies load condition, it has educed that changing rule of stress, distortion and load characteristic pipe liner in kinds of wall rock tunnel by analysis and calculation

    本文結合實際工程,分析研究了大夥房水庫輸水隧道工程在採用掘進機施工方法的情況下,利用管片襯砌的結構應力、變形等受力特性,考慮地下結構初始應力和開挖荷載對襯砌內力的影響,採用薄層單元模擬襯砌管片之間、襯砌管片與圍巖之間的非線性有限元計算模型,通過分析計算得出不同荷載工況下各類典型圍巖段隧道襯砌管片受力特徵、應力和位移變化規律。
  9. Such measures include putting roads underground as far as possible, promoting the use of utlra - low suplur diesel by heavy vehicles, trial use of lpg by light buses and taxis, adoption of the latest euro bus engines and retrofitting after treatment devices, etc. transport department will continue to explore other effective means that help improve the air quality in hong kong

    在結集各政府部門,以及如運輸公司等相關團體的力量后,運輸署已就減少交通工具排放廢氣的問題,實施一系列措施,其中包括增建地下道路、鼓勵重型車輛使用超低硫柴油、試行石油氣小巴及的士、選用新推出的歐洲機頭,以及改良車輛機械等。
  10. 26 - storey hotel, a total construction area of approximately 18, 000 square metres, with 126 sets of guest rooms, restaurants, about 1, 700 square meters, about 1, 000 square metres west restaurants, 8, 000 square metres of office space, 1, 500 square meters entertainment city, attached underground car park, transport network radiating in all directions, the conditions are unique, humane facilities evil

    酒店雄居風景如畫的珠江灣畔, 2004年3月投入經營,是一家集住宿飲食娛樂為一體的準四星級商務型酒店,內設客房部餐飲部娛樂城等。
  11. The miles of track and supporting infrastructure that makes up the london underground transport system has survived the demonic invasion fairly well

    數英里的軌道和支持系統構成了倫敦龐大的地下運輸系統,而地下運輸系統正是使得人們從惡魔的入侵中僥幸於難。
  12. What are the major land uses on criii ? a19. major land uses on criii include a wide waterfront promenade, the new star ferry piers and public piers, a " comprehensive development area " site for low to medium rise commercial development with pedestrian landscaped deck, a " government, institutional or community " site, some waterfront related commercial and leisure uses and key transport infrastructure including road p2 at grade, cwb underground, airport railway extended overrun tunnel and nil underground

    中區填海第三期工程所得土地的主要用途,包括寬闊的海濱長廊新的天星碼頭及公眾碼頭"綜合發展區"內的中低高度商業樓宇及園景行人平臺"政府機構或社區"用地與海傍有關的商業及休憩用地以及主要運輸基建設施包括p2道路網地面中環灣仔繞道地下機場鐵路掉車隧道的延部份及地鐵港島北線地下。
  13. After the completion of stage 1 in 2001, which involved the construction of deep underground tunnels to transport the sewage generated from kowloon and the northeastern part of hong kong island to a chemically enhanced primary sewage treatment plant at stonecutters island, the government is considering proceeding to a two - phased hats stage 2

    第一期工程包括修建地下管道,將九和港島東北部產生的污水,運到昂船洲的化學加強初級污水處理廠,有關已於2001年1月完成。如今政府正考慮分兩階段推行凈化海港計劃第2期。
  14. Surveying setting - out in construction of the underground monorail transport system

    猴車施工中的測量放線
  15. Underground tanks of glass - reinforced plastics - horizontal cylindrical tanks for the non - pressure storage of liquid petroleum based fuels - transport, handling, storage and installation of single wall tanks

    玻璃增強塑料地下油罐.非壓力存儲液體石油基燃料的臥式園柱油罐.單壁油罐的運輸,儲存,搬運和安裝
分享友人