upper frame 中文意思是什麼

upper frame 解釋
頂架
  • upper : adj 1 (更)上面的,上方的,上部的;較高的;上級的;(議會)上院的;(衣服)穿在外面的。2 上流的...
  • frame : n 1 機構;組織;系統。2 結構,框架,構架,骨架,骨骼。3 體格,身軀。 4 精神狀態,心情。5 【園藝】...
  1. Frame # 13 : left hand / forearm force application is backward and powered by upper arm adduction

    畫面13 :左手/小臂向後用力,並由上臂內收提供動力。
  2. Frame # 12 : the left arm hand / forearm surface is positioned to apply force as adduction of the upper arm commences

    畫面12 :隨著左大臂內收的開始,左臂的手/小臂推水面形成。
  3. The forces that developed from the deformation in the cross-frame were primarily transmitted from the connection plate into the web by the upper pair of intermittent fillet welds.

    因橫向框架中的變形所發生的力最初由連接板通過較上面的一對間斷貼角縫傳入腹板中。
  4. Guard frame upper gusset

    貨架上角板
  5. For this purpose, the thesis whose research structure is a building with frame - shear wall structure at first two stories and five - floor brick masonry structure at the upper part, adopting the finite - element analysis program - algor99, calculated and analyzed the anti - seismic behavior influenced by the change of the aseismic wall ' s distance and the transitional floor ' s thickness

    為此,本文以一底部為兩層框架抗震墻、上部為五層磚混結構房屋為研究對象,運用大型有限元分析軟體? ? algor99 ,對由於抗震墻間距和過渡層板厚的變化對結構的抗震性能的影響進行計算分析。
  6. In the design of loading - frame, puting forword a group of universal dimensions of three - point free - link attachment to category i and ii tractors through comparing and analysing whose scope of dimensions, thereout, working out sketch of loading framework on several different positions in the whole lift - course of hydraulic liftenafter this. analysing the case of force on loading framework when the loading force equal to 44100n and the lift - position of the hydraulic lifter is on upper limit, and giving a data table about the case of force on all these positions, consequently, completing the design of loading frame

    在加載框架的設計部分,通過對、類拖拉機的三點懸掛機構桿件尺寸范圍的比較分析,給出了一組、類拖拉機通用的三點懸掛機構桿件尺寸,由此作出了液壓提升器提升全行程中幾個不同位置的加載機構簡圖,並按44100n的加載力、以上極限位置為例對加載機構進行了受力分析,並給出了包括其它幾個位置在內的受力情況表,進而完成了加載框架的設計。
  7. In order to evaluate the stability of the upper structure of the cross and the pillar - soil compound foundation, and provide more theoretical bases for design and construction of this type of jacking frame - overhead cross in future, the 2d fem analyses for bearing - deformation of the frame structure of the cross and the pillar - soil compound foundation are carried out, and some relevant conclusions are obtained

    為了評判該立交橋上部結構與樁-土復合地基的穩定狀態,同時為今後此類型頂進框架立交橋的設計與施工提供更多的理論依據,對該立交橋的框架結構與樁-土復合地基的承載變形進行了平面有限元分析,取得了相應的認識。
  8. Because of the need of architectural function, high - rise buildings of frame - shear wall structure are developing rapidly, in the lower part, frame columns with small rigidity are laid to get large space which is used as marketplaces, eateries and recreational sites ; in the upper part, shear walls with large rigidity are laid to get small space which is used as residences, hotels and offices

    近年來高層建築發展迅速,由於建築功能的需要,框支剪力墻結構的高層建築發展迅速,下部布置剛度小的框架柱以獲得大空間作為商場、餐館、文化娛樂設施,上部布置剛度大的剪力墻形成小空間作為住宅、旅館或辦公用房。
  9. The horizontal beam that forms the upper member of a window or door frame and supports the structure above it

    (門窗的)過梁構成門窗上部框架的平行梁木,並支持上面的構架
  10. The cancellation of web bending reinforcement and continuous bar in upper structure of continuous rigid frame bridge is discussed with mechanics method. 4

    並對連續剛構橋上部結構設計中取消腹板彎起索、下彎索和連續束問題進行了探討,從力學角度進行了分析研究。
  11. Thirdly, in term of the results of testing and calculation, the displacement and libration, the difference of altitude, the flexibility and strain of crane - beams are all generally analysed, especially the reason why the crane - beams are attaint is lucubrated, and the reasons why the trigging pole is ruptured, the upper wingspan is damaged, the orbital movement, the exceptional incline of colums are open out, which has instructional significances that improve the design of the steel frame of the coke made by dry flameout

    第三,根據檢測和計算結果,對鋼框架的位移和振動、框架高差、吊車梁撓度和應變等進行了全面的分析,特別對吊車梁系統的損傷原因進行了深入分析,揭示了制動桿件斷裂、上翼緣磨損、軌道竄動、柱異常傾斜等一系列損傷現象的原因,對于改進干熄焦鋼框架的設計有著直接的指導意義。
  12. When escape system is activated, the grille wings at the upper fairing will open, supporting frame will pick up the orbit and returning modules, the lock between the returning and propelling modules will release, the lock between the upper and lower fairings will release, escape rocket will be ignited and finally pull the escape flight vehicle away from the rocket

    該系統由逃逸塔和上部整流罩組成,逃逸系統加上飛船的軌道艙和返回艙構成逃逸飛行器。當需要逃逸時,上部整流罩上的柵格翼打開,支撐機構夾住飛船軌道艙和返回艙,然後返回艙與推進艙解鎖上下整流罩解鎖逃逸發動機點火,逃逸飛行器飛離運載火箭。
  13. The results show that the antipunching shear bearing capacity and ductility of frame column underpin system are improved by installing coupling bar at the interface of the new - to - old concrete and enlarging the reinforcing bars at the centre and upper position in the underpinning beam

    結果表明:設置新老混凝土界面連接鋼筋和增大托換梁中部和上部配筋可提高框架柱托換體系的抗沖剪承載力和延性。
  14. First, the load effect influence factor to the steel truss transfer story, including temperature load effect and differential constrains at the truss end, relative stiffness change between the transfer story with its upper frame structure, and relative stiffness change between transfer story and its lower frame structure, is studied

    首先,對鋼桁架轉換層的受力影響因素進行了研究。主要進行了溫度作用與鋼桁架端部支承約束方式對鋼桁架受力影響的研究,轉換層與上部結構相對剛度變化對鋼桁架受力影響的研究,以及轉換層與下部結構相對剛度變化對鋼桁架受力影響的研究。
  15. One positive clone was obtained from the libraries with casein flat and electrophoresis comparison method. analyzed the sequencing result, the positive clone include the open read frame of mlap gene and upper regulatory sequence

    序列測定分析表明,此重組質粒包含有長度為1377bp低溫堿性蛋白酶基因的完整的開放讀碼框架( orf )和上游基因調控序列。
  16. To reveal the difference in the application code, each panel is further split into two horizontal frames, with the upper frame showing the online store and the lower part showing snippets of the code

    為顯示應用程序代碼的差異,每個面板進一步分為兩個水平框架,上面的框架顯示在線商店,下面部分顯示代碼段。
  17. So the pressure signal of control air holds the single - acting cylinder at the stop position through the pipe named “ supply ”, the 3 - way valve ( pos. no. 22, upper frame ), the double check valve ( pos. no. 72 - 1 ) and the quick release valve ( pos. no. 41, right frame )

    因此控制空氣的壓力信號保持單作用氣缸在停止位置通過管路supply ,三通閥22 ,上位,雙向止回閥72 - 1和快速泄放閥41 ,右位。
  18. The 3 - way magnet valve ( pos. no. 77 ) is never energized again ( upper frame ), but if the cause of deenergizing is eliminated and the electric circuits of the engine protecting system are reset, the 3 - way magnet valve ( pos. no. 77 ) is energized ( upper frame ), then the control air which has actuated the single - acting cylinder ( pos. no. 21 ) being rapidly blown off through the quick release valve ( pos. no. 41 )

    三通電磁閥77決不會再次通電上位,但如果斷電的原因被消除而且主機安保系統電氣迴路被復位,三通電磁閥77被通電上位,作用在單作用汽缸21的控制空氣已被迅速放出通過快速泄放閥41 。
  19. In the upper frame, note the ileocecal valve, and several darker oval peyer ' s patches are present on the mucosa

    下圖顯示腸道集合淋巴結(黏膜下層淋巴組織集中的地方) 。
  20. In the model, components of upper frame structures, such as beams and columns, are simulated with plane 4 - node quadrilateral parametric elements, and soils with plane 4 - node quadrilateral parametric elements

    模型中採用平面四結點等參數單元模擬上部框架結構的樑柱構件。
分享友人