upstream slope 中文意思是什麼

upstream slope 解釋
上游坡度
  • upstream : adv. 向上游,溯流。adj. 1. 溯流而上的。2. (石油工業等)上游的,和石油的勘探、開采及輸送到起運港口有關的〈石油工業此後的提煉等過程則稱為下游(downstream)產業〉。
  • slope : n 1 傾斜,坡度;坡,斜坡,斜面;【印刷】斜體。2 【軍事】掮槍的姿勢。3 【數學】斜率。4 【礦物】斜...
  1. There are some disadvantages on traditional construction method of the transition material 2b on upstream face of concrete face rockfill dam, i. e. overtopping, slope - cutting and incline compaction

    混凝土面板堆石壩上游坡面傳統的墊層料超填、削坡、斜坡碾壓的施工方法存在許多弊端。
  2. Riprap protection for dam slope on the upstream of daguangba earth dam

    梅村水庫砌石拱壩防滲加固設計
  3. ( 2 ) according to the forming model of the deep pull cracks, they can be divided into three classes pulled cracks -, pressed cracks and sheared cracks. ( 3 ) based on the two - dimensional and three - dimensional finite element methods. the following results can be affirmed : in the slope excavating process, the base surface will rebound in the direction of the excavating surface ' s excerior normal. the maximal displacements of the left and right bank are + 3. 6cm and + 2. 4cm ; the arch abutment will rebound in the direction of the river valley, the maximal displacements of the two bank are + 3. 5cm and + 2. 2cm ; the upstream and downstream surface will rebound in the direction of the normal direction. the maximal displacements are + 2. 1cm and + 1. 7cm. ( 4 ) the natural slope is stable

    ( 3 )通過二維及三維有限元分析得知,左右岸拱肩槽邊坡在開挖過程中,開挖底面主要表現為朝開挖面外法線方向發生回彈,左右岸最大位移量分別為+ 3 . 6cm 、 + 2 . 4cm ;拱端面主要表現為向河谷方向發生側向回彈,左右岸最大位移量分別為+ 3 . 5cm 、 + 2 . 2cm ;上下游坡面主要表現為向臨空方向的回彈,左右岸最大位移量分別為+ 2 . 1cm 、 + 1 . 7cm ;開挖使巖體產生由卸荷回彈導致的傾倒拉裂現象。
  4. Cause analysis and control of fangguanying reservoir dam upstream slope prevention destruction

    察爾森水庫護坡灌漿和溢流面混凝土修補
  5. Analysis on damaging causes of upstream slope protection of yuejin reservoir dam and measures to its strengthening

    寒區水庫土石壩護坡防冰凍破壞技術及應用
  6. ( 2 ) carry out a comprehensive research on their technological characteristics and suitabi 1 ity in dealing wi th the xiacouba reservoir project, the details are as follows : cd in connection with grievous seepage problem and slope stability problem of the foundation overburden and the dam itself, there are two positive plans for dealing the seepage and three for upstream slope stabi 1 ity

    具體內容如下:針對下口壩水庫壩體、壩基覆蓋層滲漏嚴重,上游壩坡穩定性差,多次滑坡特點,大壩防滲處理擬定了二種處理方案,上游壩坡加固擬定了三種處理方案,從技術可靠、工期短、造價省、施工條件等方面進行評價。
分享友人