upstream water level 中文意思是什麼

upstream water level 解釋
上游水位
  • upstream : adv. 向上游,溯流。adj. 1. 溯流而上的。2. (石油工業等)上游的,和石油的勘探、開采及輸送到起運港口有關的〈石油工業此後的提煉等過程則稱為下游(downstream)產業〉。
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  • level : n 1 水平儀,水準儀;水準測量。2 水平線,水平面;水平狀態;平面,平地。3 水平,水準;水位;標準;...
  1. By computing the water level and sedimentation processes with and without considering the extension of flow path, the results show that the effect of the river mouth path extension on the sedimentation of the trail channel is a longer period of evolution for several years or even over 10 years, and furthermore, the effect becomes weaker and weaker gradually from downstream to upstream in general

    通過比較考慮和不考慮入海流路淤積延伸2種情況的計算水位和淤積量的變化得出:單一的河口延伸對下遊河道淤積的影響過程是一個相對較長的過程,需要幾年、甚至十幾年的發展,影響程度自下游到上游逐漸減弱。
  2. Comparison of water level between measured and computation shows that the local head loss coefficient cannot give head loss by spur dike completely, and the effective area of passage is difficult to be ascertain. for this reason the two methods for water surface profile computation cannot predict the raise of water level upstream the spur dike accurately

    計算結果表明,局部水頭損失系數並不能完全反映出由於丁壩阻擋所帶來的水頭損失,而丁壩附近的有效過水面積難以準確地確定,這些導致前兩種方法均不能很好地計算出丁壩上游水位的壅高值。
  3. After studying the contents with " sx - 10 law " concerning the oil and gas ( o & g ) cost of the international oil company, the article has systematically analyzed and compared the sinopec and foreign oil company ' s o & g cost ' s differences, such as its classifications structures, and cost accounting etc. by analyzing the international oil company ' s common o & g cost ' s movement tendency and rule which has been outlined and showing in the recent 10 years, that is between 1991 and 2000, the article has compared and studied the differences in o & g costs between the sinopec and foreign oil company, furthermore, it has taken impersonally part the real and internal reasons in details which has resulted in the differences at home and abroad. for instance, it has concluded the reasons that contribute to the long - lasting higher production cost of the sinopec upstream in three aspects : firstly, it is due to the difference in its resource stratagem, that is, the foreign oil company can realize their o & g resource optimization by the way of resource electing and o & g assets replacement in the world market ; secondly, since most of the sinopec key oilfields have been in the middle or last development period which characterizing the " three high " ( high water containing, high yield and high lifting rate ), it has been an impersonal rule with a higher level of production cost ; finally, another factor resulting in the higher production cost lies in the execrable operating and social environment which has been facing by the domestic oil company and a great amount of non - producing payout which owes to the bad environment

    本論文從美國證監會( sec )對國外石油公司油氣成本的《 sx4 - 10條例》的內容研究出發,系統地分析和比較了中外石油公司在油氣成本的分類、構成以及核算等方面的差異,並結合近十年來( 1991 - 2000 )國外石油公司油氣成本的變化趨勢和變化規律,對中外油氣成本結構和變化呈現出的差異進行了比較和研究,並就導致該差異產生的深層次原因進行了客觀翔實的剖析,文章特別指出,造成中石化上游油氣生產成本居高不下的原因有三個方面: ( 1 )資源戰略方面,國外石油公司可以通過資源優選和資產置換來實現油氣資源的最優化選擇: ( 2 )從開發程度上,中石化上游普遍進入以「三高」為特徵的開發階段,生產成本高是客觀規律: ( 3 )企業面臨的惡劣經營和社會環境以及由此產生的大量非生產支出,也是構成企業生產成本較高的原因之一。
  4. According to the geological conditions of baise project, erosive bands and joint fissures, f6 fault and grout curtain are fully simulated to establish 3d numerical model of the dam and its foundation. 3d non - linear fem is used to analyze the stress and strain and to appraise the operation state of both the dam and it ' s foundation under different operation conditions. by overloading the upstream water level and reducing rock strength parameter, the dam foundation ' s degradation process is simulated and the damage pattern and paths are determined, and finally the safety factor is determined

    2 、根據百色的地形地質條件,充分模擬了蝕變帶、節理裂隙、 f6斷層、灌漿帷幕等,較為真實地建立了壩體與地基相互作用的整體三維數值模型;採用有限元法對壩體及壩基在不同工況下的應力應變狀態開展分析,評價各工況下壩基的運行狀態;而後採用超載法和綜合法對大壩穩定性進行分析,模擬壩基的漸進性破壞過程,從而得到壩基在超載和強度下降過程中的破壞模式和破壞發展路徑,最終確定壩基超載安全系數和綜合安全系數。
  5. The analysis result shows that the shear - slipping collapse of high arch dam is caused by the flood of high water level and strong surging force resulted from upstream dam bursting and large - scale mountain land - slide

    研究表明,上游潰壩和大面積山體滑坡等產生的高水位、強沖力的洪水是造成高拱壩剪滑垮壩的原因。
  6. Firstly, the displacement, stress, strain fields and the working state of dam body and foundation are evaluated by fem. by overloading the upstream water level and reducing rock strength parameters, the failure process of dam foundation is simulated and the failure mode and paths are determined. the results show that when overload method is used, damaged area develops from up - stream to down stream with failure front stays near the interface between dam body and bedrock

    首先採用非線性有限單元法對壩體及壩基在不同荷載工況下的變位、應力應變狀態展開分析,評價各工況下壩基的運行狀態,而後採用超載法和綜合法對大壩穩定性進行分析,模擬壩基的漸進性破壞過程,追蹤巖體破壞狀態的發展演變過程,從而得到壩基在超載和強度下降過程中的破壞模式和破壞發展路徑。
分享友人