verification tests of 中文意思是什麼

verification tests of 解釋
熱處理驗證試驗
  • verification : n. 1. 證實,證明,確定;核驗,驗證,核對;檢驗,校驗。2. 【法律】訴狀[答辯書]結尾的舉證說明。
  • tests : 抽查
  • of : OF =Old French 古法語。
  1. Fire resistance tests - verification of furnace performance

    耐火試驗.火爐性能驗證
  2. Fire resistance tests. verification of furnace performance

    耐火試驗.熔爐性能的驗證
  3. The work of this paper is coming from the project of electronic science & technology research institute, university of electronic science and technology of china ? soc software - hardware co - verification platform. this paper gives emphasis to the design and implementation of soc software - hardware co - verification platform monitor - control system. simultaneously, the interconnection tests of soc software - hardware co - verification platform, the fpga fabrics interconnection test and fpga with i / o slots interconnection test, are presented

    本論文主要圍繞soc軟硬體協同驗證平臺監控系統設計及其實現方法開展研究與討論,同時介紹了在對soc軟硬體協同驗證平臺進行測試過程中本文作者所做的「 fpga陣列互連線數量、連通性和數據速率測試」和「 fpga與i / o槽的互連線數量、連通性和數據速率測試」兩個測試項目方面的工作。
  4. The author gives a completely literature review about buried pipe - in - pipe heat exchanger in gshp system at first, and then outlines the research subjects to be studied in this ph. d. thesis, that is, process optimizing of performance of a buried pipe - in - pipe heat exchanger, mathematical modeling of its heat transfer process, and results verification by field tests

    本文在綜述有關地源熱泵的地下埋管換熱器研究現狀的基礎上,首先確定本文所要研究的內容:地下埋管換熱器參數優化及傳熱性能數學模擬方法,並通過實驗測試驗證相應研究結果。
  5. Steam turbines - acceptance test - thermal performance verification tests of retrofitted steam turbines

    蒸汽渦輪機.驗收試驗.改型蒸汽渦輪機的熱性能檢查試驗
  6. Rules for steam turbine thermal acceptance tests - part 3 : thermal performance verification tests of retrofitted steam turbines

    汽輪機熱力驗收試驗規則.第3部分:改型汽輪機的熱力性能驗證試驗
  7. Type the name of the test list that will contain your build verification tests ; for example, type

    鍵入將包含版本驗證測試的測試列表的名稱;例如,鍵入
  8. A build verification test typically consists of a broad suite of tests that are used to verify the overall quality of a particular build

    版本驗證測試( bvt )通常由一組廣泛的測試組成,這些測試用於驗證特定版本的總體質量。
  9. After you have created a test list, you can reuse it when a person working in the build lab using team foundation build creates a build type, such as for the process of running build verification tests

    創建了測試列表之後,當編譯實驗室中使用team foundation build的工作人員創建一個類型的版本(如版本驗證測試的運行過程)時,可以重新使用該測試列表。
  10. Where a new drug has completed its clinical tests or clinical verification and has passed an appraisal it may be approved by the department of the state council administering health, which will issue a certificate

    完成臨床試驗或者臨床驗證並通過鑒定的新藥由國務院衛生行政部門批準發給證書。
  11. Rules for steam turbine thermal acceptance tests - thermal performance verification tests of retrofitted steam turbines

    汽輪機熱力驗收試驗規則.改裝的汽輪機的熱性能驗證試驗
  12. Verification tests showed that the established mathematical model could describe the extraction process of safflower yellow pigment well, so it could directed the production and the process planning of safflower yellow pigment

    驗證實驗表明,所建立的數學模型能夠較好地描述紅花黃色素的浸提過程,對于紅花黃色素的生產和工藝設計具有理論指導作用。
  13. ( 2 ) 3d - fem analysis for the load - bearing capacity of the stud connector as the prevailing method to determine the shear rigidity and the limit load - bearing capacity of the shear connector is the push test, which is time consuming and laborious, in this thesis the push tesi specimen of the stud connector is simulated through the non - linear analysis module of the msc / nastran and the numerical analysis results are in good coherence with that of the practicality lev ; as a result, the shear rigidity and the limit load - bearing capacity of the stud connector can be determined by the finite element method and only a few practicality verification tests

    ( 2 )栓釘型剪力鍵承載力的3d - fem分析針對當前剪力鍵一般通過費時費力的推頂試驗來確定抗剪剛度和極限承載力的狀況,本文利用msc nastran非線性模塊實現了對栓釘剪力鍵推頂試樣的數值模擬分析,數值計算結果與試驗結果能夠很好吻合。這使得通過有限元方法的模擬和少量實物試驗的驗證,就能確定栓釘剪力鍵的剪切剛度和極限承載力,可以大大節省時間和經費。
  14. Notched bar tests - specification for verification of the test machine used for precision determination of charpy v - notch impact energies for metals

    劃痕棒材試驗.第7部分:金屬擺式v劃痕沖擊能量精密測定試驗機檢驗規范
  15. The set of tests that are run after the build verification tests

    生成驗證測試結束后運行的一組測試。
  16. Describes how to run build verification tests as part of a build

    描述如何作為生成的一部分運行生成驗證測試。
  17. The tests included in the application verifier are to help software developers avoid common mistakes by using verification layers to validate the usage of the following api families

    應用程序驗證程序中包括的測試通過使用驗證層來驗證以下api系列的使用情況,可以幫助軟體開發人員避免犯下一些常見錯誤:
  18. Postgraduate : pu liangtao supervisor : professor shang shouing senior engineer huang gang the research on influence of the post - casting section of continuous rigid bridge suffered vibration of train travelling is preseated in this thesis according to related project. based on theorize analysis, expriments of material properties and members under deformed vibration, verification of isolating and reducing vibration in building as well as construction technology and quality control, the effect of post - casting section suffered deformed vibration is studied thoroughly. through the analysis of 28 tests of shear strength with post - casting section under deformed vibration, the related laws are deduced. and the analysis of finite element method, the studies of quality control and construction technology are also completed

    通過現場測試、模型和試塊的模擬振動成型試驗、加載破壞試驗、理論分析、現場減振隔振試驗、施工工藝和質量控制等一系列全面、系統的研究工作,認真、深入地研究了現澆混凝土受火車行駛振動的影響,特別是在約束構件后澆濕接頭區段內現澆混凝土受火車行駛振動影響研究方面作出了開創性的工作,完成了振動使濕接頭區段受到彎曲變形影響條件下的構件模擬振動試驗、抗剪強度試驗。
  19. It was proved that the method was easy - to - operate and samples produced were homogeneous in quartz content, controllable in sample weight and compliant in particle size distribution with that collected from workplaces. the samples can be used in round - robin tests on quartz determination between laboratories and in verification of different methods for quality control

    經測試表明:該方法操作簡便,制備的呼吸性粉塵樣品石英含量均勻,樣品質量可控制,粉塵粒度分佈和現場樣品一致,適用於實驗室間或不同方法之間的石英含量比較性研究和質量控制。
  20. In recent years, with the development of computer simulation, system modeling and w & a ( verification, validation, and accreditation ), we can carry on the tests in many aspects and ways to demonstrate the weapon systems " maintainability

    近年來,由於模擬技術、系統建模技術以及模型的校核、驗證和確認( vv & a )技術的發展,對武器裝備維修性的評定,可以從多角度、多途徑進行試驗。
分享友人