vertical bending moment 中文意思是什麼

vertical bending moment 解釋
垂向彎矩
  • vertical : adj 1 垂直的,直立的,豎立的,縱的( opp horizontal )。2 頂上的,頂點的,絕頂的。3 【解剖學】頭...
  • moment : n 1 一轉眼功夫 片刻 瞬息 剎那;時刻。2 時機 機會;場合;危機;當前。3 重要 緊要;【哲學】要素 契...
  1. The research shows that : 1 ) the ductility of the hsc bending members constructed is much greater than 5 ; 2 ) increasing the vertical links and distribution steel can increase the deflection under ultimate moment ; 3 ) with appropriate compressive bars, vertical links and distribution steel the increase of moment after yield and the decrease of moment under ultimate moment can be ignored, so the ductility of the hsc bending member is much larger ; 3 ) the width / depth ratio of hsc bending member has no obvious effect on the ultimate compressive strain of concrete ; 4 ) the method used here to calculate the deflection is applicable ; 5 ) the location of crack coincides with the location of vertical links and distribution steel ; 6 ) the bending property of the hsc structure under the blast load can meet the demand of protective engineering

    研究表明:本文研究的梁、板構件的延性比遠大於5 ;增加箍筋(鉤筋、分佈筋)含量,可以提高壓區混凝土剝落時的撓度;在適當的受壓筋、箍筋(鉤筋、分佈筋)含量下,可以忽略壓區混凝土剝落瞬間的承載力下降,從而大大提高構件的延性;受彎構件的寬高比對壓區混凝土極限應變的影響不明顯;受彎構件的裂縫間距受箍筋(鉤筋、分佈筋)的布置影響;文中所用的承載力和變形計算方法是可行的。化爆試驗表明,高強混凝土構件的動載抗彎性能能夠滿足防護結構的要求。
  2. Then, a step - by - step increase of vertical bending curvature is applied to the hull girder assuming that the plane cross section remains plane. at each incremental step, the stress of the cross section is evaluated using the average stress - strain curves of the elements as well as the incremental bending moment due to the curvature increment

    船體總縱極限彎矩的計算,由於要計及材料的和幾何的非線性因素而變得十分復雜,必須用增量的方法逐步計算,獲得完整的彎矩?曲率曲線后,才能得到總縱極限彎矩值。
  3. Through the fem calculation and the analyzing data of the field, the result is that the central wall mainly endures the vertical pressure from the structure transferring and its bending moment is relatively less and its position of the maximum value of the bending moment locates in the joint between the central wall and the steel framework

    通過有限元計算和對現場監控量測數據的分析,論文得出:中隔墻主要承受結構傳遞的豎向壓力,彎矩值較小;鋼拱架的軸力以受壓為主,彎矩值在中隔墻上方位置處最大。
  4. Then, a step - by - step increase of vertical curvature is applied to the hull girder assuming that the plane cross section remains plane. at each incremental step, the stress of the cross section is evaluated using the average stress - strain curves of the elements as well as the incremental bending moment due to the curvature increment. performing sample calculations on existing girder models tests under pure bending, the rationality of the proposed method was examined

    假設船體橫向框架材足夠強,因而板架的整體破壞不會發生;基於梁?柱理論、理想彈塑性假設、平面假設,建立了拉伸和壓縮加筋板單元的平均應力?應變關系曲線,應用船體結構總縱極限強度的簡化逐步破壞分析方法計算船體總縱極限彎矩,並據此開發了計算程序sus 。
  5. Firstly, behavior and destroying mechanism of pile under inclined loads are systematically discussed based on summary of research on pile under inclined loads home and abroad, and then a power series solution for displacement and stress calculation of pile under inclined loads in layered soils is presented. based on the solution, the calculation of soil reaction force at the flank and bottom of piles, vertical and horizontal displacement of piles and maximal bending moment of piles is concluded

    本文首先系統地回顧了國內外傾斜荷載樁研究工作,在此基礎上詳細討論了傾斜荷載下基樁的受力特性和破壞機理,從而導出了處于成層地基中的傾斜荷載樁的內力及位移分析的冪級數解,並以冪級數解的分析結果進一步導出了樁側及樁端土體抗力、樁身豎向及水平位移、樁身最大彎矩的計算方法。
  6. The load distributed by central piles under vertical load are higher than by others of the pile group ; 2. under higher vertical load, the foundation soil shows an obvious characteristic of plastic strengthening ; 3. the bearing capacity of pile group under vertical load is larger than the whole sum of bearing capacity of single piles in pile group ; 4. the position of the maximum or zero value of bending moment inpiles, the line shape of bending moment diagram and the value of bending moment of the same cross section of a pile under same load is different according to the lateral loading and the longitudinal loading ; 5

    在較大的豎向荷載作用下,土體出現明顯的塑性強化特徵; 3在豎向荷載作用下,群樁的承載力大於各基樁承載力之和; 4沿線路水平縱、橫向加載時,最大彎矩和零彎矩的位置、彎矩變化曲線的形狀以及在相同荷載作用下各樁同一截面的彎矩值都有一定差異; 5
  7. By way of these tendons, precest beams and columns can be assembled conveniently, and the joints and frame are monolithic and continuous. consequently, compared with common reinforced concrete frams, this kind of frame systems possess higher reliability and solved the problems in the process of assembling prestressed concrete frames. also it forms the framework of subassemblage and prestressed concrete frames, and explores a new way for industrial production of prestressed structures. by analyzing this system, a series of conclusion are provided, incluing modulation of bending moment produced by vertical loads within beam end, secondary internal forces produced by pretress force, shear resistance of the end of beams, the influence of lateral restrains. theresearch results of this paper are proved to be practical. some advices are also brought forward on the design process

    后張預應力筋既可作為施工階段拼裝手段,又可在使用階段承受梁端彎矩,構成整體受力節點和連續受力框架,克服了裝配式節點受力可靠性差的缺陷,解決了預應力混凝土框架難以裝配的問題,形成預制預應力混凝土裝配整體式框架,開辟了預應力結構工業化生產的新途徑。本文針對預壓裝配式預應力混凝土框架,從豎向荷載作用下的梁端彎矩調幅、施加預應力在框架中產生的次內力、梁端抗剪承載力、考慮側限的無側移框架的承載力分析四個方面對該種裝配式結構體系的性能做了詳細的研究。
分享友人