wanjiazhai 中文意思是什麼

wanjiazhai 解釋
萬家寨
  1. Dam joint grouting in wanjiazhai water complex

    萬家寨水利樞紐工程大壩接縫灌漿
  2. According to the fact of the engineering, the optimal modeling when fenhe first reservoir operated alone are first made. after getting the regularity, in order to consider fenhe second reservoir that had been finished essentially and shanxi wanjiazhai yellow river diversion project, not only the object of minimum water shortage for satisfying the water use demanded mainly by user are founded, but also the object of minimum the reservoir deposition was found. in order to prevent the water use demanded by city and industry from excessively concentrated water shortage, the object of minimum water shortage required to be the equable shortage

    本文在對來水分析基礎上,對太原市需水庫供水的用水進行了預測,結合工程實際,先對汾河一庫單獨運行時進行優化模擬,得出規律后,考慮已基本完工的汾河二庫及引黃南干工程,建立了以滿足用戶用水為主要目標的「缺水量最小」目標和減少水庫淤積的「水庫淤積量」最小的目標,其中「缺水量」最小目標要求是均勻的短缺,避免過分集中而影響了城市及工農業用水。
  3. This paper introduces the construction method used in the pccp pipeline in the linkage section of yrdp of wanjiazhai, shanxi province, advances some concrete measures for guaranteeing the quality and safety in the construction

    對山西省萬家寨引黃工程連接段pccp管道的施工方法進行了簡要介紹,提出了施工中具體的質量保證措施與安全保障措施。
  4. In this paper, based on much connected and basic data about fenhe first reservoir, second reservoir and shanxi wanjiazhai yellow river diversion project, etc, the multi - object optimal model for united operation of fenhe first and second reservoirs was found, the operation rule by using multiple regression technology in optimal outcome for them was also made

    本文參閱了大量國內外有關文獻、並全面收集了汾河一庫、汾河二庫、引黃工程等基本資判。的基礎上,建立了汾河水庫一庫、二庫聯合運用的多目標優化模型,並對優化結果用多元回歸擬合技術制定了汾河一庫、汾河二庫的運行規則。
  5. Application of fiber current differential relays in electrical power system of shanxi wanjiazhai yellow river diversion project

    光纖電流縱差保護在引黃工程供電系統中的應用
  6. Analysis of the abutment seepage on wanjiazhai multipurpose project

    黃河龍口水利樞紐壩基承壓水問題分析與滲流控制
  7. On the platform of windows xp, depending on the model of the hydraulics computer simulation and the algorithm, aiming at the general main pump station ( gmps ) of yrdp, from wanjiazhai reservoir to shentongzui reservoir, the hydraulics computer simulation program has been programmed and implemented with ms vb 6. 0, which is able to simulate the hydraulics characteristics of a series of transient working conditions between gmps1 and gmps2 of yrdp

    在windowsxp環境下,以上述模擬計算模型和演算法為基礎,使用visualbasic語言,編程實現了引黃工程從總干萬家寨水庫至申同嘴水庫水利學模擬計算程序,對總一、二級泵站的多種運行工況的水力學瞬變特徵進行了模擬計算。
  8. Water and soil conservation in migration area of wanjiazhai water control project of yellow river

    小浪底庫周與移民安置區環境影響研究
  9. Most part of the north trunk line of wanjiazhai yellow river delivery project has to pass through the zone of collapsible loess, so the collapsibility of the loess foundation becomes the main engineering geological problem therein

    摘要山西省萬家寨引黃工程北干線輸水管線大部分地段通過黃土地區,黃土地基的濕陷性已成為主要的工程地質問題。
  10. According to several engineering examples, this paper has probed and contrasted quantitatively the effect of chemical grouting. based on longyang canyon and lijia canyon, the author has concluded that chemical grouting attained satisfactory effect on strengthening fault so long as choose suitable grout ratio. based on wanjiazhai engineering ^ the author has assayed the cause that the effect was n ' t reasonable, that has the order before grouting and quantity during grouting etc. therefore, some reasonable proposals have been tabled in relations to the grouting methods and quantity methods

    針對龍羊峽、李家峽兩個工程實例的對比研究得到結論,只要選擇合適的漿液配比,化學灌漿對斷層破碎帶的加固是可以取得令人滿意的效果的;針對萬家寨工程的研究,對其效果不理想的情況,分析了其出現的原因主要可能是由於其灌漿前處理進行的順序及施工質量等,進而對以後的灌漿方法、施工方法等做一些合理化建議。
  11. Water temperature computation of drawing water line in wanjiazhai water transfer project

    南干線的水體溫度分析
  12. Pilot pre - grout for stopping water in blow section of tunnel, wanjiazhai yrdp yellow river diversion project

    萬家寨引黃工程北干線1號隧洞管片襯砌計算
  13. The instrument has been applied to spot construction for the first time on the construction site of commanding and dispatching center of channeling water from huanghe river in wanjiazhai of shanxi. digital and sensing technology is employed to accomplish the dual open loop control over the tension of prestressing tendon. because the traditional technology of prestressing construction is improved, construction accuracy and efficiency are greatly rais ed

    智能預應力張拉儀是能與普通張拉設備配套重復使用的智能化顯示與控制儀表,是本課題組研製的專利產品,本文首次在山西省萬家寨引黃工程式控制制調度中心施工現場將智能預應力張拉儀應用於現場施工中,利用數字傳感技術實現了對預應力筋張拉的雙重開環控制,改進了傳統的預應力施工工藝,大大提高了預應力施工的精度和效率,從而有效地避免了工程事故的發生。
  14. Planning of shanxi wanjiazhai yellow river diversion project

    萬家寨引黃入晉工程規劃
  15. Administration bureau of wanjiazhai yellow river diversion project of shanxi province

    省萬家寨引黃工程管理局
  16. Calculation of no1 tunnel lining in wanjiazhai water diversion from the yellow river

    引黃工程北干1號隧洞主要工程地質問題及施工對策
  17. Soil and water loss of shanxi wanjiazhai yellow river water diversion project and measures for prevention and control

    山西省萬家寨引黃工程土壤流失與防治措施
  18. The units " vibration, noise and pressure fluctuation in the draft tube are measured in wanjiazhai hydro power station. eighteen measuring points were arranged on the 2 # and 5 # units respectively

    尾水管壓力脈動以及噪聲等重要參數進行測量分析,試驗包括2 #機組和5 #機組各18個有效測點
分享友人