water anchor 中文意思是什麼

water anchor 解釋
浮錨
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  • anchor : n 1 掛錨;錨狀物。2 樁,支架。3 〈比喻〉依靠。4 【體育】一隊運動員中最後參加比賽的人;殿後的人〈...
  1. Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports

    首先,在前人研究成果的基礎上,對錨桿與圍巖的相互作用機理進行研究,利用全長錨固錨桿的中性點理論,從等效均化的角度來考慮錨桿對圍巖的加固作用,並推導了在簡單荷載作用下,含有襯砌、等效加固后的圍巖、原始圍巖三者的彈塑性解析解,對工程設計有著重要的參考意義;在數值模擬方面,以考慮錨固圍巖滿足規則化庫侖摩擦模型為基礎,利用虛功原理推導了接觸問題的有限元方程的計算格式,為開發運用大型商用有限元軟體msc . marc提供了理論根據,也形成了本文的理論基礎:最後,論文以南水北調東線穿黃隧洞穩定性分析項目為工程實例,利用本文所述的接觸問題的摩擦模型理論,對錨桿支護結構的應力場、位移場的變化規律進行了研究,分析了加錨支護對隧洞圍巖應力、變形的影響。
  2. 3. the magnitudes of anchor chain tension caused by heave and pitch is small. so is the effect on dragging anchor. 4. the depth of water, which anchored ship requires, is to large extent affected by heave and pitch

    水深對橫蕩和首搖運動影響較大,水深增加,橫蕩和首搖運動幅度增大,因此,對錨鏈沖擊力增大,即對走錨的影響較大。
  3. He advanced several paces towards the point whence the light came, and to all the excitement of his dream succeeded the calmness of reality. he found that he was in a grotto, went towards the opening, and through a kind of fanlight saw a blue sea and an azure sky. the air and water were shining in the beams of the morning sun ; on the shore the sailors were sitting, chatting and laughing ; and at ten yards from them the boat was at anchor, undulating gracefully on the water

    他向光線透進來的那個地方走前幾步,在夢的興奮激動過后,跟著就來了現實的寧靜,發覺自己是在一個巖洞里,他向洞口走去,透過一座拱形的門廊,他看到一片蔚藍色的海和一片淡青色的天空,空氣和海水在清晨的陽光里閃閃發光,水手們坐在海灘上,在那兒嘰哩咕嚕地談笑著,離他們十碼遠的地方,靜靜的停著那艘小船。
  4. They were, says mr stephen, and the end was that the men of the island, seeing no help was toward as the ungrate women were all of one mind, made a wherry raft, loaded themselves and their bundles of chattels on shipboard, set all masts erect, manned the yards, sprang their luff, heaved to, spread three sheets in the wind, put her head between wind and water, weighed anchor, ported her helm, ran up the jolly roger, gave three times three, let the bullgine run, pushed off in their bumboat and put to sea to recover the main of america

    「此語不差」 ,斯蒂芬先生曰, 「其結果,本島男子發現負情女子異口同聲,無可救藥。遂建造舟筏,攜家財登船,桅桿盡皆豎起,舉行登舷禮,轉船首向風,頂風停泊,揚起三面帆,在風與水之間挺起船首,起錨,轉舵向左,海盜旗迎風飄揚,三呼萬歲,每次三遍,開動艙底污水泵,離開兜售雜物之小舟,駛至海面上,航往美洲大陸。 」
  5. Based upon the present regulation, the design and construction check and structure strength check, the electric power generation water inlet anchor gate crane platform ' s hydro - engineering structure of fushui power plant were conducted and an analysis for the reasons of building structure fracture was carried out

    摘要進行了富水電廠發電進水口閘門啟閉機平臺安全檢測,依據現行規?對其建築物進行了設計與施工復核、結構的強度復核和建築物的裂縫成因分析。
  6. It serves to anchor the plant and absorb water and nutrients

    可以固定植物,吸收水分和無機鹽類。
  7. Citing five - meter - high nanfei river rubber dam in hefei, one of the highest double - anchor water rubber dam in china as an example, while deeply analyzing some representative rubber dam projects in china, the article theoretically exploits the relationships among some technical parameters such as anti - pull intensity, internal pressure ratio, circum - oriented relative extending rate, etc. also has the author brought up his own opinion on rubber dam design & calculation theory, which is of high theoretical and applicative value for parameter optimization and combination of water rubber dam with a height of above 3. 5 meters. it also helps when building over - five - meter - high rubber dam using seamless rubber dam and rubber dam with steel wire as its frame. this article also exploits safety measures for designing & building rubber dam in navigation areas

    本文以充水式雙錨固橡膠壩目前國內最高(壩高5m )之一的合肥市南淝河橡膠壩工程為例,並在對全國目前已建橡膠壩代表工程進行深入分析的基礎上,對壩袋的抗拉強度、內壓比、環向相對伸長率等技術參數之間的關系進行了理論探討和研究,並對橡膠壩設計計算理論提出了自己的見解和看法,對指導設計壩高3 . 5m以上的充水式橡膠壩技術參數的優化組合具有重要的理論和應用價值,特別對應用無搭接縫橡膠壩、鋼絲網骨架橡膠壩建造壩高大於5m的橡膠壩具有指導意義。
  8. Before that, we had got the treasure stowed, and had shipped enough water and the remainder of the goat meat, in case of any distress ; and at last, one fine morning, we weighed anchor, which was about all that we could manage, and stood out of north inlet, the same colours flying that the captain had flown and fought under at the palisade

    我們在島上無需再做什麼了,我們把財寶裝上了船,貯備了足夠的淡水,把剩餘的山羊肉也帶走了,以防萬一。在某天早上,我們一切都準備妥當,終于起錨登程,把船駛出北汊。這面曾被船長升上屋頂且在其下同敵人作戰的旗子又重新迎風飄揚在我們上空。
  9. It is applied to drill heavy duty pretension anchor holes at side slope of water power station, railway or highway projects, to drill drainage holes and grouting pile holes on roof of tunnel gallery

    適用於水電站鐵路公路邊坡大噸位預應力錨固孔排水孔隧道口管棚孔的施工,以及預防滑坡巖石坍塌等地質災害治理工程。
  10. The results show that after water is successfully blocked, the roadway deformation is controlled using the highly - prestressed anchor combined bolting system and the supporting invalidation is avoided

    結果表明,在成功阻斷泥化誘因「水」之後,高強預應力錨桿組合支護體系可有效控制巷道變形,避免泥化導致隨后的錨固失效。
  11. It is difficult to use pre - stress anchor technique to the deep excavation pit on the coast, in which the stra - tum is highly filled with water and subjected to the penetration of sea water, therefore there is no suc - cessful experience

    瀕臨海邊的深基坑,地層含水量高,滲透性大,易受海水滲透影響,在這類基坑中應用預應力錨桿技術困難極大,鮮有成功的工程經驗。
  12. Yg - 80a construction drilling rig is a full hydraulic operated top drive power head drill. it is used to drill heavy duty pretension anchor hole at side slope of water power station, railway or highway projects, as well as drainage holes

    Yg - 80a型錨固工程鉆機是在yg - 80鉆機基礎上研製的,科學分配鉆機性能參數,使鉆機更適合巖石潛孔錘鉆進跟管鉆進,同時兼顧土層合金回轉鉆進螺旋鉆進工藝。
  13. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  14. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  15. Abstract : anchor packer is one of the important downhole tools which areused in oil production and waterflood technical operation, such as layer waterflood, layer fracture or acidation, mechanical water block. after anchor is fixed in the simulated test unit, the invasion depth of the casing can be known with the help of the sensor around the casing wall, and then the failure degree is concluded. this is very important for the anchor packer design and site operation

    文摘:在油田開發中封隔器是實施機械採油、分層注水、分層壓裂或酸化、機械卡堵水等注采工藝作業的主要井下工具之一,封隔器上的卡瓦是保證工作可靠性的重要元件,把卡瓦安裝在模擬試驗裝置中,通過在套管壁周圍分佈位移傳感器,測得卡瓦錨定后切入套管壁深度,判斷卡瓦對套管的損傷程度,這對封隔器的設計和現場使用具有十分重要的意義。
  16. The results are of more precision by adopting the latest achievements. conclusions are drawn by a large number calculation. 1. to large extent, the magnitudes of sway and yaw are affected by the depth of water, so is that of anchor chain tension ; the magnitudes of sway and yaw are smaller in the shallows than in the deep, so is that of anchor chain tension ; 2. to small extent, the magnitude of heave and pitch is affected by the depth of water

    該數學模型突破了以往數學模型的局限性,不僅考慮了縱蕩、橫蕩、首搖運動,還考慮了垂蕩、縱搖運動;在該數學模型中還考慮了淺水的影響,對模型中受淺水影響較大的部分作了淺水修正;在計算各外力時,採用最新研究成果,使計算結果更加準確;通過大量計算得出一些很有意義的結論: 1
  17. Elastic - plastic analysis for soil around anchor jacked pile in this paper, the course of penetration is regarded as expansion of cylindrical cavity in infinite soil mass. combining with the knowledge of elastic mechanics and plastic mechanics, we can make analysis for soil around pile. finally, we can educe the cylindrical cavity pressure, radius of plastic zone, radical displacement in elastic zone, excess pore water pressure in soil around pile and spherical cavity pressure at the end of pile

    錨桿靜壓樁樁周土體的彈塑性分析該部分是文章的主要工作所在,本文把壓樁過程樁周土體的本構關系看作是水平面的平面應變小孔擴張問題,利用小孔擴張原理,結合彈性力學以及塑性力學的知識,對壓樁後土體的性狀作出分析,得出樁對土的擠擴作用力、樁周土體塑性半徑、彈性區的位移,壓樁完成瞬時樁周土體彈性區和塑性區的超孔隙水壓力以及樁端球形孔擴張的擴張力。
  18. Application yg - 30 construction drilling rig is used for drilling anchor holes in deep base pit of high building, anchor and reinforce side - slope for water conservatory project, water power station project, railways and highways

    Yg - 30型工程鉆機適用於高層建築深基坑錨固水電工程鐵路公路錨固護坡,尤其適用於高邊坡治理錨桿孔,排水孔的施工。
  19. Walk out the port anchor chain on the water surface

    松出左錨錨鏈到水面
  20. Let go one shackle of starboard port anchor into water

    松出右左錨鏈
分享友人