water discharge 中文意思是什麼

water discharge 解釋
出水量
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  • discharge : vt 1 發射(炮等),打(槍),射(箭)。2 起,卸(貨)。3 排泄,排出,放出(水等)。4 釋放;解除,...
  1. Nerval network forecasting method and application of mine water - discharge amount based on matlab

    的礦井涌水量神經網路預測方法及應用
  2. This trap adopts parallel double valve seats, thus the capacity of water discharge is enlarged. it can satisfythe working condition of discharge frozen water in large quantity

    該閥採用平行雙閥府,因而增大了排水能力,能滿足大量排除凝結水的工況。
  3. The construction includes 31 buildings, including administration building, maintenance factory, wheel - cutting factory, signals and telecommunication facility control room, machinery and electricity equipment factory, etc. furthermore, there are also several kinds of equipments facility : such as, oil tank, gasoline station, automobile - washing factory, way dregs storage area, way dregs loading machine shelter, water discharge channel, wasted water pipe line and scenic spots facility, etc

    工程內容包含有31棟建築物如行政綜合大樓檢驗修理廠車輪鏃削廠號志及通訊設備機房機電與工務設備廠等。另有各項設備施如:油槽加油站洗車廠道渣儲存區,道渣裝卸機棚排水溝渠污水管線景觀設施等。
  4. Though the maximum of removal ratio of cod can reach 71 %, the removal ratio of cod of water discharge has been under 60 %, when hydraulic load surpasses 48. 6mg / l - d

    雖然最高去除率可達71 ,但當水力負荷人於48 . 6ml l ? d時,出水cod去除率已低於60 。
  5. In summer, when hydraulic load ranges from 7ml / l - d to 60ml / l - d, the change of the water quality of water discharge is very small, and the removal ratio is over 70 %

    夏季cod進水濃度為1500mg l左右,水力負荷在7 60ml l ? d范圍內逐漸增加時,出水水質變化不大,去除率基本穩定在70以上。
  6. Water discharge density

    噴水密度
  7. Concrete construction temperature control for water discharge culvert of tgp ' s shiplock in summer season

    三峽船閘泄水箱涵夏季混凝土施工溫度控制
  8. 1 the company has excellent production condition and public facilities such as self - provide power plant supplying high voltage wire of 35 kv, two sets 16000 kva transformers in power station, one deep well with water discharge of tons per hour, water pool with water pcapacity of 150 tons, one water tower with 100tons, two boilers with four tons, three compressed air machines to make sure the requirement of production. the company located at no. 62haozhuang st. taiyuan city and is 0. 7 kilometer away from dongshan expressway and also 2. 5 kilometer away from the railway station. the company was also equipped with communication facilities for example international telephone and fax

    該公司具有良好的生產條件及公用設施:有自備電廠供給35kv高壓進線,變電站16000kva變壓器兩臺深井一眼,每小時出水50噸蓄水池150噸水塔1個,容量100噸4噸鍋爐兩臺,空壓機三臺,保證生產需求。公司位於太原市郝莊正街62號,距東山過境公路0 . 7公里,離車站貨場2 . 5公里,交通十分便利。有國際電話及傳真機等通訊設施。
  9. A mathematic model for cooling water discharge to forked bays is established by using the boundary fitted orthogonal coordinate system to simulate the complex boundaries, the full implicit coupled solution model to discrete the base equations, and the matrix chase - after method to solve the algebraic equations

    摘要採用正交邊界擬合坐標變換模擬復雜的邊界,全隱式耦合模型離散基本方程,矩陣追趕法求解代數方程組,建立了分叉型海灣溫水排放數學模型。
  10. Rain water discharge system design for new terminal building in new baiyun airport, guangzhou

    廣州新白雲國際機場航站樓雨水系統設計
  11. The shahe pumped - storage power station with two 50mw reversible units has been in good conditions on general since it was put into operation, but there still were some defects, such as the failure of unit ' s contemporaneous device, the insufficient cooling water discharge and pressure, and the failure of static frequency converter and excitation overcurrent

    摘要沙河抽水蓄能電站兩臺50mw可逆式機組自投運以來,總體情況良好,但是也出現了一些缺陷,如機組同期裝置故障,機組冷卻水流量或壓力不足,靜止變頻器故障,勵磁過電流故障等。
  12. Reservoirs, dams, water inlet, water diversion tunnels ( including branch tunnels, water diversion canals, voltage adjustment wells ( towers ), open - air high - voltage conduits, premises, water discharge canals, communications facilities between premises and dams and other related ancillary equipment used by hydropower stations

    (三) 、水力發電廠使用的水庫、大壩、取水口、引水隧洞(含支洞口) 、引水渠道、調壓井(塔) 、露天高壓管道、廠房、尾水渠、廠房與大壩間的通訊設施及附屬設施。
  13. When the discharge volume is near the maximumdischarge volume of the trap, it issuggested that fhe sixe of the water discharge pipeline should be as large as possible

    當排量接近疏水閥的最大排量時,建議盡可能擴大排水管線的尺寸。
  14. On flow pattern in horizontal pipeline of building water discharge

    關于建築排水橫管水流研究的探討
  15. All water conveyance and water discharge structures are designed to locate at right bank strip ridge, due to special topography and land form. large excavation area and steep slope raising from close plan locations of adjacent structure lead to slope stability. in general, slope stability analysis and treatment are concerns of zipingpu project

    由於其特殊的地形、地貌,工程的各輸、泄水建築物共7條隧洞均布置在右岸條形山脊內,各相鄰建築物進出口的平面位置距離較近,開挖范圍大、坡度高且陡,存在著大量因開挖而形成的高邊坡穩定問題。
  16. Electric and pneumatic construction, weak electricity construction, fire system construction, air system construction, and water discharge - supply construction

    電氣工程弱電工程消防工程空調工程給排水工程
  17. Construction content : electric and pneumatic construction, fire system construction, weak electricity construction, water discharge - supply construction, and monitor construction

    工程內容:電氣工程消防工程弱電工程給排水工程監控工程
  18. Using the 1 - d rivernet model calculates the water discharge ratio of the two branches and also duplicates the back - flow in the north branch during flood tide. the 2 - d model with a fine grid is applied to the field of flow in the changjiang estuary and the results are well in agreement with the measured flow

    同時利用河網模型對長江口分汊河段進行一個月的水流模擬,並獲得了長江口南北支分流比,復演出北支漲潮時水體倒灌轉流現象,解決了河網模型用於分汊河道潮汐水流模擬的問題。
  19. Ancillary facilities of roads mentioned in the preceding paragraph refer to facilities, equipment and special buildings or structures for road protection, water discharge, maintenance, management, services, traffic safety, ferrying, monitoring and control, telecommunications and fee collection for the purpose of protecting, maintaining and ensuring traffic safety of roads

    前款公路附屬設施,是指為保護、養護公路和保障公路安全暢通所設置的公路防護、排水、養護、管理、服務、交通安全、渡運、監控、通信、收費等設施、設備以及專用建築物、構築物等。
  20. As the water discharge opening is below the water level. applying the water block principle, no steam leakagecan be obtained

    由於排水孔在水位以下,利用水封原理,達到蒸汽不泄漏。
分享友人