water power and dam construction 中文意思是什麼

water power and dam construction 解釋
水力與水壩建設
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  • power : n 1 力,力量;能力;體力,精力;(生理)機能;〈常 pl 〉才能。2 勢力,權力,權限;威力;政權;權...
  • and : n. 1. 附加條件。2. 〈常 pl. 〉附加細節。
  • dam : n 1 水閘,壩,堰。2 壩中的水。3 【礦物】坑道堰。4 (牙科用的)橡皮障。5 〈比喻〉障礙。vt 1 築水閘...
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. With the further economic growth and the implement of development of the western regions, hydroelectric construction in our country is undergoing rapid growth, anumber of high - dam power - station is in building or in programming. in view of its higher - head and larger magnitude of spill structure outlet, it is difficult for conventional concrete or reinforced concrete structure of pier and pier room to support its vast water pressure. coupled with the improvement of prestressed method, it has been the noteworthy tool in solving the problem

    隨著我國經濟的加速發展及西部大開發戰略的實施,我國水電事業也迎來了迅猛發展的大好時機,一批高壩水電站正在建設或規劃之中,其泄水建築物孔口及水頭愈來愈大,常規混凝土或鋼筋混凝土閘室閘墩結構難以承受如此之大的水推力作用,隨著預應力技術的成熟,這一技術已成為解決該問題的關鍵技術措施之一。
  2. In charge of one of major subjects of the national eighth five - year plan, i. e. " study on shotcreting techniques of polyacrylate emulsion cement mortar for impermeability coating of pu ding rcc dam ", the achievement of which has been appraised by the ministry of electric power and evaluated as reaching national leading level. 2. in charge of the major subject aided by the committee of national natural science funds, " study on durability of high bolumes of fly ash concrete ", the first phase achievement of which has been commended by the committee. 3. in charge of one of major subjects of the national ninth five - year plan, i. e. " study on high performance concrete in marine engineering, design and construction ". 4. acting as one of editors - in - chief of " technical specification for abrasion and cavities resistance of concrete in hydraulic structures ", which is issued by the ministry of water resources. 5. by providing the repairing and strengthening schemes on seepage and cracks of the basement of nanjing lukou international airport, the air traffic opening of the airport was ensured as scheduled. 6. consulting services on techniques of high performance and abrasion - erosion resistance concrete for three - gorges project, anti - corrosion of reinforced concrete strutures for the ore port of shanghai baoshan iron and steel works, mass fly ash concrete for jiangyin yangtze river bridge and pumping concrete for nanjing yangtze river second bridge

    主持國家「八五」攻關項目「普定碾壓混凝土壩上游面丙乳砂漿防滲層大面積施工工藝研究」 ,成果通過部級鑒定,評價屬國內領先水平; 2 .主持國家自然科學基金重大項目「高摻量粉煤灰混凝土的長期性能研究「 ,階段成果獲國家自然科學基金委通報表彰與獎勵; 3 .主持國家「九五」攻關項目「海工高性能混凝土成套技術研究」 ; 4 .水利部「水工混凝土抗沖磨防空蝕技術規范」的主編之一; 5 .為南京祿口國際機場地下室修漏與裂縫補提出技術方案被采納並實施,為機場如期通航作出貢獻; 6 .為三峽工程抗沖磨高性能混凝土技術、上海寶鋼礦石碼頭鋼筋混凝土防腐蝕技術、江陰長江大橋大體積粉煤灰混凝土技術、南京長江二橋泵送混凝土技術等提供咨詢建議。
  3. The horizontal swirling flow internal dissipater tunnel being built in gongboxia power station will be the first one reconstructed from a diversion tunnel whose discharge reaches to 1000m vs and water head is more than 100m in china. its scheme ' s argumentation, test research and future apply will have important meanings to the design. research and engineering application of internal dissipation discharge tunnel with swirling flow, will powerfully promote engineering application of this new kind of dissipation mode, which may solve some high velocity problems in high dam construction and provide a engineering example for technological and economical augmentation in a diversion tunnel reconstruction. it is of theoretical and practical importance to promote hydraulic structure researches and development

    公伯峽水電站右岸旋流內消能泄洪洞是國內第一個泄量達1000m s 、水頭超過100m ,即將修建的旋流式內消能泄洪洞,其方案的論證與試驗研究以及建成后投入使用,將在國內外旋流式內消能泄洪洞設計、研究與工程應用中具有重要的意義,將有力的推動這一新的消能形式在工程中的應用,從而為解決高壩建設中泄水建築物的高速水流問題與導流洞改建的技術與經濟問題提供工程實例,對推動與發展水工水力學的研究與發展均具有重要的理論與實踐意義。
  4. " field observation of high rock - fill dams and feedback data analysis " and " dynamic analysis of high earth and rock - fill dams and aseismatic measures ", the concepts and methods obtained in the above two consulting items were creative and evaluated by the ministry of electric power as being of international level. the research findings were adopted in such large - scale projects as the tianshengqiao water contral project, ming tombs water control project. dahe water contral project, ming tombs water control project, dahe water control project and lianhua water control project and awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 2 ) the research on the stress - strain correlation of dam construction materials was awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 3 ) the result of the field observation test and computational analysis for the tailing dam improvement project of xuzhou power plant was adopted by the east - china design institute of electric engineering with considerable economic benefit. ( 4 ) the result of the geotechnical test and data analysis of wenfu mine project was applied in the project with considerable economic benefit. ( 5 ) the field observation and data analysis of the kezier reservoir project provided a solid base for ensuring the normal operation and management of the reservoir

    「高堆石壩原位觀測和反潰分析研究」及「高土石壩動力分析及抗震工程措施研究」咨詢項目提出了具有開拓性的觀點與方法,經電力工業部鑒定評為國際先進水平,該兩項成果已應用於天生橋、十三陵、大河、蓮花等大型工程獲電力工業部科技進步二等獎; 「壩料土動力應力應變關系的研究」咨詢項目獲電力工業部科技進步二等獎, 「徐州發電廠灰壩加固工程勘測試驗與計算分析」咨詢成果已被華東電力設計院設計采納,工程效益顯著; 「甕福磷石膏渣場工程土工試驗與數值分析」咨詢成果已應用於國家重點工程甕福礦肥基地建設,效益顯著; 「克孜爾水庫工程原型觀測數據庫與資料分析」咨詢項目為水庫運行與管理提供了有力保證。
  5. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  6. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  7. Rock - fill dam is the one chief type of soil - rock dam, there are much virtue of safety function, adaptability used the local material, be benefit to mechanical building, be short in building time and low in cost, being simple in the building during closure and diversion, etc. it suit the condition of our nation and the environment where the water conservancy works and hydroelectric power plant located, we accumulate the ample practical experience and a series of achievement in scientific research and become a model of having ample competition in the construction and development of piled rock clam

    堆石壩是土石壩的主要壩型之一,它具有適應性強,就地取材,便於機械化施工,工期短,造價較低等優點,在水利樞紐設計中被廣泛應用,而且已經積累了豐富的實踐經驗和成套的科研試驗成果,在水利樞紐的壩型選擇中具有很強的競爭力。就堆石壩而言,根據築壩方式和築壩材料的不同,也有多種壩型。