water power station 中文意思是什麼

water power station 解釋
水力發電廠
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  • power : n 1 力,力量;能力;體力,精力;(生理)機能;〈常 pl 〉才能。2 勢力,權力,權限;威力;政權;權...
  • station : n 1 站,臺,車站;航空站,機場。2 派出所;署,局,所。3 【無線電】電臺,電視臺。 4 駐地,部戍地,...
  1. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧流河水庫供水工程取水頭部由引水渡槽、節制閘、進水閘、泄水閘等建築物組成。由於本工程場地條件限制,增設旁通管后布置非常緊湊,管道急轉角度大且轉彎距離較小,對于管內水流流態是否滿足要求,需要經過模型試驗進行論證,以確保工程的可靠性。旁通管具有上水與泄水要求,對其過流能力也要經試驗確定,為碧流河水庫增建旁通管設計提供依據。
  2. Filling construction design of uockfill dam with face slab in shuanggou water power station

    雙溝水電站面板堆石壩填築施工設計
  3. According to the actuality of the studied water power station, the thesis combine the advanced fieldbus technique, ethernet and the traditional hydraulic technique together, and use them to design the supervise controlling system of the water power station. base on the gate - controlling request of the water power station, designed the gate ' s hydraulic hoist system

    文章從結合所研究的水電站的實際需要出發,將先進的現場總線技術、以太網技術與傳統的液壓技術相結合,並應用到水電站閘門監控系統的實際設計過程中。論文根據所研究水電站閘門控制的具體技術要求,設計了適合該水電站的液壓啟閉機系統。
  4. A water power station must have a dam

    水電站必須有攔河壩。
  5. Design of hydrogenerator house in tengxigou water power station

    四湖溝水利樞紐壩型比較施工導流設計
  6. This system can be used for generation operation or flood control operation in different runoff situation, whether in flood period or in non - flood period. and, it can also supports reasonable operation of water power station

    該模型集成系統對原有調度系統作了較大的技術改進,可在洪水期和非洪水期根據來水的不同情況,進行相應的發電調度或防洪調度。
  7. In foreign trade field, company focuses on the international engineering contract, project bidding, complete device exporting and other fields such as metallurgical machinery, mine machinery, universal machinery, light industrial machinery, hardware tools, foods machinery, steel structure workshop, water power station water power generator set, traffic, energy sources, communication, building materials, household apparatus and textile

    對外貿易以國際工程承包項目招標成套設備出口及冶金機械礦山機械通用機械輕工機械五金機械食品機械鋼結構廠房水力發電站水電機組火力發電站火電機組交通運輸能源通訊建築材料家用電器紡織品等領域為主。
  8. Calculation of concrete temperature control for dam in tengzigou water power station

    藤子溝水電站大壩混凝土溫度控制設計
  9. It is applied to drill heavy duty pretension anchor holes at side slope of water power station, railway or highway projects, to drill drainage holes and grouting pile holes on roof of tunnel gallery

    適用於水電站鐵路公路邊坡大噸位預應力錨固孔排水孔隧道口管棚孔的施工,以及預防滑坡巖石坍塌等地質災害治理工程。
  10. Application of ansys in analysis of water power station powerhouse

    軟體在水電廠房分析中的應用
  11. By applying the method of reliability technique, according to the eletric equipments reliability evaluate rules, this paper systematically analyzes faults which possibility or usually appear in turbine, generator, speed - adjusting controller in water power station and their reasons and effect factors. meanwhile it also uses the method of fat to study the fmea and preventive fault measures of turbine of zz500 - lh - 1020 and find out the biggest risk from all parts risk in turbine of zz500 - lh - 1020. this paper analyses the technique of reliability management of main equipments

    本論文運用可靠性技術中的有關方法,依據《發電設備可靠性評價規程》對機組的可靠性狀態進行分類,系統地分析了水輪機、發電機、調速器等三大機械主設備中可能或經常出現的故障,產生這些故障的原因及其影響因素;同時,使用故障樹分析方法,研究了zz500 - lh - 1020軸流轉漿式水輪機轉輪的故障模式及其影響,同時也分析了預防處理這些故障的措施;通過危害度分析,找出了zz500 - lh - 1020軸流轉漿式轉輪中各個部件的危害性大小與危害性最大的部件。
  12. Yg - 80a construction drilling rig is a full hydraulic operated top drive power head drill. it is used to drill heavy duty pretension anchor hole at side slope of water power station, railway or highway projects, as well as drainage holes

    Yg - 80a型錨固工程鉆機是在yg - 80鉆機基礎上研製的,科學分配鉆機性能參數,使鉆機更適合巖石潛孔錘鉆進跟管鉆進,同時兼顧土層合金回轉鉆進螺旋鉆進工藝。
  13. On the base of the popular short - term hydrologic forecast models, xin ' anjiang model, the sacramento model and the tank model are used to simulate and analyze the rongjiang river basin and result are analyzed contrastively the second part : the economic running problems are studied in the water power station, and the newest results are used in the water power station in rongjiang river basin

    第一部分,探索了入庫徑流短期預報方法,在綜述了現行常用的短期水文預報模型的基礎上,分別用新安江模型、薩克模型和水箱模型對融江流域實際資料進行模擬計算。對模擬結果進行了比較分析。第二部分,水電站廠內經濟運行理論的實例應用研究,將相關最新研究成果應用於融江流域水電站。
  14. In this paper, referring to qingju water power station, temperature control analysis and study has been done : study on the match ratio of the concrete and question of modifying of the special fine sand concrete to improve resisting ability of splitting of concrete ; study on the technology of the highly mixed fly ash to reduce the adiabatic temperature rise of concrete ; in case of the condition of resisting splitting to allow, study on the temperature control measure to strengthen and water the size of building, simplify the operational procedure, accelerate the construction speed, economize the expenses of the project

    溫控問題成為青居水電站設計和施工的關鍵技術問題。 、本文對水工大體積混凝土溫控問題進行了分析和總結,結合青居水電站閘壩工程,開展溫度應力及溫度控制研究:研究混凝土的配合比及特細砂混凝土『改性問題,提高混凝土的抗裂能力;研究高摻粉煤灰技術,降低混凝土的絕熱溫升:在抗裂條件允許的情況下,研究施工過程中溫控措施的簡化,以加大澆築尺寸,簡化施工程序,加快施工進度,節約工程費用。
  15. The liner of turbine draft tube in ankang water power station was punched by cavitation, which leads to welding crack, metal shed and concrete delve, water spurting out. the cause of the damage is analyzed, the treatment is expounded

    論述了安康水電站水輪機尾水管里襯被汽蝕破壞穿透、焊縫開裂、撕裂掉塊、混凝土掏空、大量噴水的事故原因及處理方法。
  16. Abstract : the liner of turbine draft tube in ankang water power station was punched by cavitation, which leads to welding crack, metal shed and concrete delve, water spurting out. the cause of the damage is analyzed, the treatment is expounded

    文摘:論述了安康水電站水輪機尾水管里襯被汽蝕破壞穿透、焊縫開裂、撕裂掉塊、混凝土掏空、大量噴水的事故原因及處理方法。
  17. The ascertainment of surges in surge tank and waterhammer pressure in pipe systems is the key point of the design of surge tanks and the safe function of the water power station

    調壓室中的水位波動以及壓力管道水擊壓強的確定對調壓系統的正確設計和確保電站調壓系統的正常運行至關重要。
  18. The achievement in research is adopted by the designs and constructions for the qingju water power station

    研究成果為青居水電站設計施工所採用。由於經濟效益顯著,受到業主單位的嘉獎。
  19. Immersion forecast of houyaoying village in shilong water power station

    石龍水電站庫區后腰營村浸沒預測
  20. Application yg - 30 construction drilling rig is used for drilling anchor holes in deep base pit of high building, anchor and reinforce side - slope for water conservatory project, water power station project, railways and highways

    Yg - 30型工程鉆機適用於高層建築深基坑錨固水電工程鐵路公路錨固護坡,尤其適用於高邊坡治理錨桿孔,排水孔的施工。
分享友人