water storage dam 中文意思是什麼

water storage dam 解釋
蓄水壩
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  • storage : n. 1. 貯藏(量),存儲(量);(倉庫)保管;庫容量。2. 棧房,倉庫,貯藏所。3. 棧租,棧費。4. 貯存器。5. 【電學】蓄電(瓶)。6. 【自動化】(計算機的)存儲(器);記憶。
  • dam : n 1 水閘,壩,堰。2 壩中的水。3 【礦物】坑道堰。4 (牙科用的)橡皮障。5 〈比喻〉障礙。vt 1 築水閘...
  1. The first power station of jinping mountain lies in the west section of the yanglongjiang river from santan to shoupagou gully, with a double - curved arch dam of 305 - meter height and a normal water storage of 1880metres. the exposed strata of the damsite are marbles and arenaceous rocks of triassic and solution fissures have been developed in the marbles of the left - bank ' s dam abutment, and they have become a stratum of strong leakage. as a result, it has been an important problem for the dam foundation to stop leakage

    錦屏一級電站位於西雅礱江的三灘至手爬溝河段,壩型為305米高雙曲拱壩,正常蓄水位標高1880米。壩址區出露的地層為三疊系雜谷腦組二段大理巖和三疊系雜谷腦組三段的砂板巖。在勘探過程中,發現左岸壩肩大理巖體中的構造裂隙和溶蝕裂隙發育,且成為強滲透地層,為此壩基的防滲成為重要問題。
  2. The results are as follows : ( 1 ) if we increase the pumping water by 493 x 104m3, the amount of leakage recharge of rubber dam will rise by 231x 104m3 ; which indicates pumping by rubber dam can excite much more surface water infiltrate so as to supply groundwater. thus the utilization ratio of water source is increased, and it provides the reliable guaranty for enough supply of the groundwater storage in wet year. ( 2 ) under the condition of present status, the groundwater exploitable resource in wet year is 3670 104m3

    最後,通過數值法反復調算計算出本區地下水的允許開采量,計算結果表明,在現狀開採的條件下,大沽河地下水庫豐水年( p = 20 )時地下水允許開采量為13670 10 ~ 4m ~ 3 ,平水年( p = 50 )時地下水允許開采量為12054 10 ~ 4m ~ 3 ,枯水年( p =加% )時地下水允許開采量為10951xl了砰。
  3. The change of adiabatic temperature rise along with age and the effect on temperature field of dam body made by pouring lift by lift, work suspension in summer and water storage are considered in the analysis

    分析中考慮了混凝土的絕熱溫升隨齡期的變化和分層澆築、夏季停工及蓄水對壩體溫度場的影響。
  4. Proceeding with the analysis of water resource peculiarity of jilin province, the authors bring forward that effective gathering and using of rainwater can supplement the gross amount of rainwater in valley, probe into rainwater resources use in jilin province : first is to make rainwater resources use plan in valley program, secondly is to construct gully dam system according to water and soil conservation project, to strengthen sloping field collection rain ' s project and forest - grass construction, to increase storage space, thirdly is to fully utilize field project and water conservancy project to gather rain water, intercept rainfall on the spot so as to restore water environment

    摘要從吉林省水資源特點分析入手,提出了雨水資源的有效集蓄利用是補充流域水資源總量不足的重要因素,探討了在吉林省雨水資源主要利用途徑是首先在小流域規劃中作好雨水資源利用規劃;其次是建設以水土保持治溝骨幹工程為主的溝道壩系,強化坡面集雨工程和林草植被建設,增大貯水空間;第三是充分利用田間工程和水利工程集雨蓄水,使降雨就地就近被攔蓄,最終使水環境得以修復。
  5. The whole project comprised the building of the dam, a 2, 428 - yard tunnel driven through the wong nai chung gap valley and a 5, 500 - yard brick and stone aqueduct to connect the reservoir with the storage tank and filter beds at albany road. each day the volume of water being conveyed reached 7 million gallons. the 6 filter beds of the project were situated on the eastern side of the albany nullah ; measuring 3, 245 sq

    除水壩外,其他配套的工程包括: (一)一條長達2 , 428碼、貫穿黃泥涌峽谷的隧道; (二)一條長5 , 500碼的引水道,可連接水塘隧道的亞賓尼濾水池及配水庫,該引水道用石及磚砌成,每天可輸水700萬加侖; (三)位於亞賓尼水渠東部的六個過濾池,該濾水系統面積廣達3 , 245平方碼,深30尺,每天可過濾570萬加侖水,原水過濾后,經一條直徑18寸鐵水管,流入花園道與寶雲道交界的配水庫。
  6. Feasibility study on dam construction for water storage in poyanghu lake

    鄱陽湖建閘蓄水的可行性研究
  7. In this article, according to heat conduction theory and finite element theory, the temperature field in the arch dam during construction and operation are simulated and analyzed by means of three dimensional finite element relocating mesh method, and the distribution law of the temperature field in the arch dam during construction and operation are systematically studied, and according to the construction process of concrete arch dam, the effect of lamination placement, construction interval, thermal insulation change, surrounding temperature change and water storage on temperature field in the arch dam are also considered

    論文根據熱傳導理論及有限元理論,用三維有限元浮動網格法對施工期和運行期溫度場進行了全過程模擬分析,較為系統的研究了混凝土拱壩施工期和運行期溫度場分佈規律,在分析中按照混凝土拱壩施工過程,考慮了混凝土分層澆築、施工間隙時間、絕熱溫升過程及壩體材料分區、水庫分期蓄水和環境溫度變化等因素對壩體溫度場的影響。
  8. Aiming at the recharge capacity of rubber dam to the groundwater storage, the excited water supply of the dam caused by the exploitation of industry is discussed by mathematical simulation

    並針對橡膠壩的補給能力,通過數值模擬探討了壩內蓄水因工業開采而激發的補給量。
  9. Analyses on effect of sediment - storage dam construction on water resource of north shannxi and the yellow river

    陜北地區淤地壩建設對項目區及黃河水資源的影響分析
分享友人