water storage project 中文意思是什麼

water storage project 解釋
蓄水工程
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  • storage : n. 1. 貯藏(量),存儲(量);(倉庫)保管;庫容量。2. 棧房,倉庫,貯藏所。3. 棧租,棧費。4. 貯存器。5. 【電學】蓄電(瓶)。6. 【自動化】(計算機的)存儲(器);記憶。
  • project : vt 1 投擲,拋出;發射(炮彈等);噴射。2 使突出,使凸出。3 設計,規劃,計劃,打算,籌劃。4 投影;...
  1. Those research results will be applied on some important civil engineering such as china national high level radioactive waste deposal, energy storage project, the deep exploitation of petroleum and gas, and the construction of the exceed deep and exceed long tunnel of “ south to north of waterproject

    開展大型材料模擬試驗技術、節理巖體三場耦合理論和關鍵試驗技術的研究,為國家高放廢物處置、能源戰略儲存、石油深層開采、南水北調西線超深超長隧道營建等重大工程服務。
  2. Proceeding with the analysis of water resource peculiarity of jilin province, the authors bring forward that effective gathering and using of rainwater can supplement the gross amount of rainwater in valley, probe into rainwater resources use in jilin province : first is to make rainwater resources use plan in valley program, secondly is to construct gully dam system according to water and soil conservation project, to strengthen sloping field collection rain ' s project and forest - grass construction, to increase storage space, thirdly is to fully utilize field project and water conservancy project to gather rain water, intercept rainfall on the spot so as to restore water environment

    摘要從吉林省水資源特點分析入手,提出了雨水資源的有效集蓄利用是補充流域水資源總量不足的重要因素,探討了在吉林省雨水資源主要利用途徑是首先在小流域規劃中作好雨水資源利用規劃;其次是建設以水土保持治溝骨幹工程為主的溝道壩系,強化坡面集雨工程和林草植被建設,增大貯水空間;第三是充分利用田間工程和水利工程集雨蓄水,使降雨就地就近被攔蓄,最終使水環境得以修復。
  3. The whole project comprised the building of the dam, a 2, 428 - yard tunnel driven through the wong nai chung gap valley and a 5, 500 - yard brick and stone aqueduct to connect the reservoir with the storage tank and filter beds at albany road. each day the volume of water being conveyed reached 7 million gallons. the 6 filter beds of the project were situated on the eastern side of the albany nullah ; measuring 3, 245 sq

    除水壩外,其他配套的工程包括: (一)一條長達2 , 428碼、貫穿黃泥涌峽谷的隧道; (二)一條長5 , 500碼的引水道,可連接水塘隧道的亞賓尼濾水池及配水庫,該引水道用石及磚砌成,每天可輸水700萬加侖; (三)位於亞賓尼水渠東部的六個過濾池,該濾水系統面積廣達3 , 245平方碼,深30尺,每天可過濾570萬加侖水,原水過濾后,經一條直徑18寸鐵水管,流入花園道與寶雲道交界的配水庫。
  4. Based on the project scale argumentation of letan hydropower station, the paper briefly introduces the main results of scheme ' s technical & economical comparison and the main factors of scheme option in the option and design stage of the normal storage water level and installed capacity, as well as the evaluating opinions given by the specialist group of project proposal evaluating committee ; the main technical characteristics for similar project scale argumentation are summarized up according to the project scale design argumentation of letan hydropower station

    摘要通過樂灘水電站工程規模論證,簡述該工程正常蓄水位選擇和裝機容量選擇設計階段方案技術經濟比較的主要成果、取捨方案的主要因素、以及項目建議書評估會專家組的評估意見;並根據樂灘水電站工程規模設計論證總結類似工程規模論證時的主要技術要點。
  5. The new project, dreamed up around a decade ago, would tap excess water from the white river when it floods and pump it, at the rate of about one billion gallons a day, to storage tanks on around 1, 000 rice farms

    大概十年前人們就夢想有這樣一項新的工程,能在懷特河發生洪災時對上漲的河水進行引流,並以每天10億加侖的流量將其抽入大約1000個水稻農場的蓄水池中。
  6. The overall plan for xiaolangdi project management zone is carried out to ensure the safe operation of hydraulic constructions in the zone, to make full use the advantages of location and resources of the area, and to realize the general objective of “ mainly aim at flood prevention including ice flood prevention and sedimentation reduction, and give consideration to water supply, irrigation, power generation, storage of clear water and discharge of sediment flow, alleviating disaster and bringing about benefit, and comprehensive utilization ", for the project development

    為確保小浪底水利樞紐工程管理區內水工建築物的安全運行,充分發掘管理區的區位優勢和資源優勢,實現「防洪(包括防凌) 、減淤為主,兼顧供水、灌溉、發電、蓄清排渾、除害興利、綜合利用」的工程開發總目標,對工程管理區進行了總體規劃。
  7. Underground water - sealed oil storage cave is a large scale underground project, and rockburst is one of the geologic hazards that will possibly occur during the excavation of the cave

    摘要地下水封石洞油庫屬于大型地下工程,巖爆災害是施工過程中可能引發的地質災害之一。
分享友人