water way 中文意思是什麼

water way 解釋
水冷腔
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  • way : n 1 路,道路,通路。2 路程;距離。3 (要走的)路線;途中,路上;進行,前進;【法律】通行權。4 方...
  1. It was restaurant industry graven topic that that of that of from input / output angle said, how advance restaurant kernel ability to compete, with the purpose of advance business economic benefit, as soon as possible brought return, accelerating demonetization end, abaft experience know clearly near twenty year stodgy state look forward to reform mechanism, our state hotel industry be around by babyhood trend maturity, by seller ' s market trend buyer ' s market, such transit should make part rational consumer enjoy to good value for money, too brought ought to part superficial restaurant taste to inevitable ; the government owned restaurant at multinational restaurant bloc and civilian battalion restaurant enterprise " dual impact down, calendar by know clearly reform of monetary system cum bank commercialization, market open cum solution control, market cum competitive mechanism three phase, owing to planned economy belated issues, structure irrationality wrought a matter of and overlapping investment wrought a matter of wait threefold cause, make government owned restaurant at market competition middle gradualness forfeiture competitive edge, in progression appearance hot water, how advance government owned hotel competitive power a matter of, toward me state tourism possess strong operation significance, hunan lotus hotel namely same family pole tool on government owned three stars level hotel behalf of the for the last years, by way of hotel industry occupy quite specific gravity

    從投入產出的角度講,如何提高飯店核心競爭能力,以達到提高企業經濟效益,盡快產生回報,加速貨幣回籠的目的,是飯店業嚴肅的話題。在經歷了近二十年步履艱難的國企改革歷程后,我國飯店業已開始由幼稚走向成熟,由賣方市場走向買方市場,這種轉變將使得部分理性的消費者享受到物有所值,也使部分膚淺的飯店品嘗到必然的失敗;近十年來,作為飯店業占相當比重的國有飯店在跨國飯店集團和民營飯店企業的雙重沖擊下,歷經了金融體制改革及銀行商業化、市場開放及解控、市場及競爭機制三個階段,由於計劃經濟遺留下來的問題、結構不合理造成的問題和重復投資造成的問題等三方面的原因,使得國有飯店在市場競爭中逐漸喪失競爭優勢,相繼出現困境,如何提高國有飯店競爭力的問題,對於我國旅遊業具有強烈的現實意義,湖南芙蓉賓館就是一家極具代表性的國有三星級飯店。
  2. The only way to pay for the owens valley aqueduct was to sell not only the water, but also the valuable by-product electric power.

    償付歐文斯各水道的唯一途徑就是不僅把水,而且把重要的副產品--電力統統出賣。
  3. The influential factor of accuracy of measured pulp beating degree, including water temperature, pulp consistency, checking instrument and so on is discussed, and one convenient way of measuring pulp consistency is introduced

    摘要初步探索影響測漿準確性的幾個因素,包括水溫、測漿濃度、儀器校準等,並介紹了一種簡單易行的濃度檢測方法。
  4. In this way the strip of water got its name bosporus, the way of the cow

    在十分悲痛之中,牛犢穿越了分隔歐亞大陸的海峽。
  5. A picturesque track it was, by the way ; lying along the side of the beck and through the sweetest curves of the dale : but that day i thought more of the letters, that might or might not be awaiting me at the little burgh whither i was bound, than of the charms of lea and water

    順便提一句,小路風景如畫,沿著小溪向前延伸,穿過彎彎曲曲秀色誘人的山谷。不過那天我想得更多的是那封可能在,可能不在小城等著我的信,而不是草地和溪水的魅力。
  6. Usage : use a capful to 1 - 30 with water ( according to the wall material and how heavy the pollution is ), and then clean with the usual way

    使用方法:將該清潔劑一份加三十份水(根據外墻面的材料和污垢的程度需要做相應的調整)用常規方式即可清洗墻面。
  7. Then i turned and went down chesnut - street and part of walnut - street, eating my roll all the way, and, coming round, found myself again at market - street wharf, near the boat i came in, to which i went for a draught of the river water ; and, being filled with one of my rolls, gave the other two to a woman and her child that came down the river in the boat with us, and were waiting to go further

    於是我轉個彎,經過栗子街和胡桃街的一段,在路上吃那一卷東西,兜一個圈子,發現我又在市場街碼頭,離開我剛來時停船處不遠,我到那裡去喝一點河水,我的三卷中的一卷已塞滿我的肚子了,於是就把另外的兩個給一個婦人和她的孩子,她是和他們一齊來的,正在等著到更遠的地方去。
  8. Round we went with the tide, until we got well under the lee of the point, when suddenly the speed slackened, we ceased to make way, and finally appeared to be in dead water.

    我們隨波逐流,四處飄蕩。到了海岬下面的避風處,速度突然減低,船慢慢停了下來。最後就好象走進了一道死水灣似的。
  9. At last, i conclude a way to increase the recognition ratio of the under - water target. the method of this dissertation is to distinguish the property of the under - water target by eradiate noise

    主要的工作是在前期研究的基礎上,利用已有水中目標的特徵提取和識別方法,應用人工神經網路技術,總結出一種水下目標識別方法。
  10. From roundwood reservoir in county wicklow of a cubic capacity of 2, 400 million gallons, percolating through a subterranean aqueduct of filter mains of single and double pipeage constructed at an initial plant cost of 5 per linear yard by way of the dargle, rathdown, glen of the downs and callowhill to the 26 acre reservoir at stillorgan, a distance of 22 statute miles, and thence, through a system of relieving tanks, by a gradient of 250 feet to the city boundary at eustace bridge, upper leeson street, though from prolonged summer drouth and daily supply of 12 1 2 million gallons the water had fallen below the sill of the overflow weir for which reason the borough surveyor and waterworks engineer, mr spencer harty, c. e., on the instructions of the waterworks committee, had prohibited the use of municipal water for purposes other than those of consumption envisaging the possibility of recourse being had to the importable water of the grand and royal canals as in 1893 particularly as the south dublin guardians, notwithstanding their ration of 15 gallons per day per pauper supplied through a 6 inch meter, had been convicted of a wastage of 20, 000 gallons per night by a reading of their meter on the affirmation of the law agent of the corporation, mr ignatius rice, solicitor, thereby acting to the detriment of another section of the public, selfsupporting taxpayers, solvent, sound

    但是由於夏季久旱,再加上每天供水一千二百五十萬加侖,水位已降到低於排水口。都市監察官兼水道局技官土木工程師斯潘塞哈蒂奉水道局的指示鑒于有可能會像一八九三年那樣被迫利用大運河和皇家運河那不宜飲用的水,除了飲用外,下令一律禁止使用市裡供應的自來水。尤其是南都柏林濟貧院,盡管限定用六英寸的計量器,每個貧民每日配給十五加侖水,然而在市政府法律顧問辯護律師伊格內修斯賴斯的監督下,經查表證實,每夜要浪費兩萬加侖水,從而使院外的社會各階層也就是自費並有支付能力的納稅者們蒙受損害。
  11. One morning we found a dead flying fish on the deck of the boat, it didn ' t make its way back to the water

    一天早晨,我們在甲板上發現了一條死去的飛魚,它沒能重返水中。
  12. Article 24 the local people ' s governments at various levels sha1l organize agricultura1 collective economic organizations and farmers to manage in a planned way the cultivated land with a slope of above 5 degrees but under the reclamation - forbidden degrees, by taking in line with different conditions such water and soil conservation measures as regulating drainage systems, building terraced fields, and practicing a method of cultivation conducive to water and soi1 conservation

    第二十四條各級地方人民政府應當組織農業集體經濟組織和農民,有計劃地對禁止開墾坡度以下、五度以上的耕地進行治理,根據不同情況,採取整治排水系統、修建梯田、蓄水保土耕作等水土保持措施。
  13. The way of land and water resources development and utilization in headwaters relates to the whole watershed sustainable development directly

    摘要水源涵養區水土資源開發利用方式直接關繫到整個流域是否可持續發展。
  14. An experimental research on notching wet beach of the yellow river with the short - delay blasting is made for eliminating the risk that the main river channel is often threatened by some horizontal and slanting streams occurred on the downstream of the river and solving the problems from the bend cut - off for river channel harnessing, water way dredging and the siltation of the water diversion outlets along the channel

    摘要為了利用爆破解決黃河下遊河道經常出現的橫河和料河威脅河道安全的險情以及河道整治中的裁彎取直、疏浚航道和河道引水口淤積的問題,在黃河濕灘上進行了微差爆破開槽試驗研究。
  15. Hotel nikko new century beijing is located along the famous xizhimen street. it is near the canal that the emperor used when going to the summer palace from the inner city. along the water - way you will find many royal gardens such as the leshan garden beijing zoo, the wuta tower, the wanshou tower, and the purple bamboo park

    北京新世紀日航飯店坐落於北京西直門外,它比鄰明清兩代帝王由市內通往頤和園的水道,故而其周邊保留了諸多皇家名苑:如樂善園北京動物園五塔寺萬壽寺福蔭紫竹院等。
  16. The preparing work before test run : first organize test run guide group consisted of supply party, demand party and installation party to check the installed qualified equipment ( machine, electricity, liquid, gas ) in an all - round way to see that circuit, water - way, gas - way and oil - way are switched on ; that all fastener, bolts and nuts are tight ; that all lubricating points and cooling points are put in position

    試運轉前的準備工作:首先應組織有關(供方、需方、安裝)等單位參加的試車領導小組,對已安裝合格的設備(機、電、液、氣)進行全面的檢查,電路、水路、氣路、油路是否接通,所有設備的緊固件、螺栓、螺母等是否擰緊,各潤滑點和冷卻點是否到位。
  17. Like the water way over there under that bridge

    就象那邊橋下的水
  18. The mississippi river gulf outlet ( at right ) merges with the gulf intra coastal water way just east of new orleans

    密西西比河的河灣出口(在晚上)與新奧爾良東面的河灣節點沿岸水路匯合。
  19. Fourthly, compared with calculate results for typical section of a culvert soft - base reinforcement project in the water way to sea of huaihe river engineering by the plane strain fem based on biot consolidation theory, measured data and simple calculation result, the simple calculation method proposed in this paper is proved to be reasonable and verified, and is more referenced by congener project

    ( )採用平面應變比奧固結有限元法對淮河入海水道某涵閘軟基加固工程進行了數值計算,通過對比數值計算結果、實測值及簡化方法計算結果,證明了本文提出的沉降計算簡化方法的正確性和適用性,所得結論對于同類工程具有一定的參考價值。
  20. There are two purposes in numerical harbor : one is to reduce the investment of harbor, it includes planning breakwater and selecting water way more reasonably, the other is to increase the benefit of harbor, the main content of which is to reduce maintenance cost and to take operation decision according to the natural conditions

    建立數值化港區的目的有兩個:一、降低港口的建設投資,更為合理地進行堤防布置和航道選取;二、提高港口效益,其中的主要內容是降低港口的維護費用,並智能化地根據當前自然條件進行港口營運決策。
分享友人