water-power scheme 中文意思是什麼

water-power scheme 解釋
水力方案設計
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  • power : n 1 力,力量;能力;體力,精力;(生理)機能;〈常 pl 〉才能。2 勢力,權力,權限;威力;政權;權...
  • scheme : n 1 計劃;方案;路線;設計。2 系統;配合;組織。3 綱目;表;清單;分類表;大綱。4 謀劃,策劃;詭...
  1. A scheme to be formulated and submitted for approval to the harbour commissioners for the exploitation of white coal hydraulic power, obtained by hydroelectric plant at peak of tide at dublin bar or at head of water at poulaphouca or powerscourt or catchment basins of main streams for the economic production of 500, 000 w. h. p. of electricity

    有個建造水力發電廠的計劃:利用都柏林沙洲的滿潮噗啦呋咔272或鮑爾斯考特瀑布273的水位差主要河流的流域來開發白煤水力發電,經濟生產五十萬水馬力的電力。擬好后,將提交港灣委員會,以便獲得批準。
  2. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡水電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。
  3. The optimal layout scheme and design scale of the plant site are determined through the analysis and evaluation of the capacity of flood control and flood discharge of the watercourse nearby the pump house of zhongning electric power plant. this will provide use for reference for the similar water - intake engineering in the future. it has great significance for theoretical research and practicable value for application as well

    本課題通過對中寧發電廠取水泵房廠址附近河道的防洪及河道行洪能力的分析和評價來確定其廠址的最優布設方案和設計規模,對今後類似的黃河上取水泵房的設計提供借鑒,因此具有重要理論研究意義和實際應用價值。
  4. The horizontal swirling flow internal dissipater tunnel being built in gongboxia power station will be the first one reconstructed from a diversion tunnel whose discharge reaches to 1000m vs and water head is more than 100m in china. its scheme ' s argumentation, test research and future apply will have important meanings to the design. research and engineering application of internal dissipation discharge tunnel with swirling flow, will powerfully promote engineering application of this new kind of dissipation mode, which may solve some high velocity problems in high dam construction and provide a engineering example for technological and economical augmentation in a diversion tunnel reconstruction. it is of theoretical and practical importance to promote hydraulic structure researches and development

    公伯峽水電站右岸旋流內消能泄洪洞是國內第一個泄量達1000m s 、水頭超過100m ,即將修建的旋流式內消能泄洪洞,其方案的論證與試驗研究以及建成后投入使用,將在國內外旋流式內消能泄洪洞設計、研究與工程應用中具有重要的意義,將有力的推動這一新的消能形式在工程中的應用,從而為解決高壩建設中泄水建築物的高速水流問題與導流洞改建的技術與經濟問題提供工程實例,對推動與發展水工水力學的研究與發展均具有重要的理論與實踐意義。
  5. In this paper according to the design scheme of yao heba power station in nan yahe river, the mathematical model with longer and complicated conduit system, elastic water hammer and pid regulating low of voter turbine adjusting system in the case of the small fluctuation has being built, which include conduit system, surge tank, draft tube, water turbine, generator and governor. the hydraulic losses are taken into account, and nonlinearization in water turbine and the governor is also taken into account

    本文根據南椏河姚河壩水電站的設計方案,對水輪機調節系統,按長引水管道復雜引水系統、彈性水擊、調速器為pid調節規律,在小波動情況下,對包括引水道、調壓井、尾水管、水輪機、發電機、調速器在內的水輪機調節系統建立數學模型,並計及引水管道水力摩阻損失,對水輪機、調速器考慮了其中的非線性,利用功能強大的matlab軟體編制了源程序進行計算機模擬計算。
  6. According to thinking relevant to the formulation of the scheme for the project of recovery of waste heat from low - temperature blown gas, the design of a short - type unit with water - cooled walls for co - production of heat and power from subhigh pressure blown gas

    摘要按編制低溫吹風氣余熱回收工程方案的有關思路,介紹了帶水冷壁的矮型次高壓吹風氣熱電聯產裝置的設計情況。
  7. The paper is committed to the research on the application of fault diagnosis and fault tolerant control in the modern power plant. the new schemes of fault diagnosis both for boiler water level control system and unit coordinated control system are presented ; moreover, based on the lqg strategy, a scheme of fault tolerant control for unit coordinated control system is also proposed

    電廠熱工控制系統的安全運行已經成為人們日益重視的課題,在這種背景下,本文致力於故障診斷與容錯控制在電廠熱工控制系統中的應用研究。主要內容是針對電廠鍋爐汽包水位控制系統和電廠單元機組協調控制系統提出兩種故障診斷的新方案;並且把lqg控制策略應用於單元機組協調控制系統,提出了協調控制系統的主動容錯控制方案。
  8. Abstract : for high arch dams in valleys with the characteristics of high water head, large discharge and large power, the problems of energy dissipation and scour prevention are serious. based on scientific studies, new comprehensive measures are proposed, including dispersion of discharge to waken wallop of the current, and reinforcement of riverbed to enhance the erosion - resistance. the measures can be used to solve the problem of energy dissipation properly. a typical layout scheme has been proposed in which slotted bucket with diversion teeth, double deck with pores, and cushion pool are considered practice has proved that the scheme is reliable and the effect of energy dissipation is obvious

    文摘:高拱壩泄洪消能的特點是壩高落差大,流量大,功率大,位於河谷狹窄地區,泄洪消能與防沖問題突出.經科學研究,採用「分散泄洪,削弱水流沖擊力,加固河床,增強河道抗沖能力」的綜合治理措施,較好地解決泄洪消能布置問題.提出了表孔大差動坎加分流齒、雙層多孔、水流撞擊、下設水墊塘聯合消能的典型布置方案,經實踐證明,方案可靠,消能效果好
  9. The difficulties of this problem are as follows : there is a grate discrepancy of geology condition of dike in middle - lower reaches of yangtze river, the facts which affect groundwater power field and water chemistry field not only include geologic structure of dike, topography and river network, precipitation infiltration and evaporation condition, but also are closely related to the design scheme of impermeable wall, construction method and construction quality

    本課題研究的難點在於長江中下游堤基工程地質條件差異較大,影響地下水動力場、水化學場的因素不僅與堤基地質結構、地形與河網分佈、降水入滲及蒸發條件,而且與防滲墻的設計方案、施工工法及施工質量等密切相關。
  10. The scheme is on the basis of the heterogeneity of soil water content ' s horizontal spatial distribution in the region and the evaporative power of relatively saturated region. if the probability density function ( pdf ) of soil water content ' s horizontal spatial distribution and the evaporative power of relatively saturated region are attainable, the mean evapotranspiration flux of the region can be calculated

    該方案以區域內土壤水分在水平空間上分佈的非均勻性和相對飽和區地表蒸發力為基礎,在已知土壤水分水平空間分佈律的概率密度函數( pdf )和飽和區地表蒸發力的前提下,實現區域平均蒸發散量的計算。
分享友人