water-pressure regulation 中文意思是什麼

water-pressure regulation 解釋
水壓變動率
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  • pressure : n 1 壓;按;擠;榨。2 【物理學】壓力,壓強;大氣壓力;電壓。3 精神壓力,政治[經濟、輿論等]壓力。4...
  • regulation : n 1 規則,規程,規章,條例。2 控制,管理,限制,(情慾等的)節制。3 調整,調節,整頓。4 校準;穩...
  1. Verification regulation of water meters at high pressure

    高壓水表檢定規程
  2. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  3. For the sake of the research about hydroelectric interfere among machines, the article utilized the simulink in matlab as simulating tool, meanwhile established the simulating model about two high head diversion water turbines regulation system in violent fluctuating pressure sharing one head race tunnel and surge tank and one penstock. then calculated the load rejection transition process by means of the real parameters of a hydro power station, analysed the interfere of hydro power station safety and stable nenring brought by hydroelectric interfere and put forward a series of measures that lightening the hydroelectric interfere

    為了研究機組間的水力干擾,本文採用matlab下的simulink作為模擬工具,建立共用有壓引水管道、調壓井、壓力主管的兩臺高水頭引水式水輪機調節系統大波動時的模擬模型,引入實際電站的參數,對甩負荷過渡過程進行了模擬計算,分析水力干擾對電站安全、穩定運行所造成的影響,並提出了一系列減輕水力干擾的措施。
  4. Technical regulation of design for high pressure water injection fittings

    高壓注水管路配件設計技術規定
  5. Lv switchboard, lsnh low smoke non - halogen cabling, fire pump, boost pump, fire alarm, water hammer, pressure regulation valve, 5 " brass main pipe, 2272l water tank

    車站:低壓開關箱低煙無毒電纜配置ups消防泵加壓泵火警系統水錘防止器調壓閥5 」銅質干管2 , 272l水箱。
  6. Lv switchboard, lsnh ( low smoke non - halogen ) cabling, fire pump, boost pump, fire alarm, water hammer, pressure regulation valve, 5 " brass main pipe, 2272l water tank

    車站:低壓開關箱、低煙無毒電纜配置、 ups 、消防泵、加壓泵、火警系統、水錘防止器、調壓閥、 5 」銅質干管、 2 , 272l水箱。
  7. With negative pressure gauge, neutron instrument and monitor research for depth of embedment of groundwater, we can obtain the changeable regulation of the soil moisture change in field and moisture use efficiency in field at childbearing period ; in five irrigation water, every time all has deep seepage, and the soil all can reach to saturation ; in childbearing period, the mutual change relation of irrigation water and groundwater is active

    摘要通過負壓計、中子儀、地下水埋深監測研究,得出生育期田間水分變化規律及土壤水分利用效率; 5次灌水均有深層滲漏,土壤都能達到飽;在生育期間,土壤水和地下水相互轉換關系活躍。
分享友人