work requisition 中文意思是什麼

work requisition 解釋
作業申請單
  • work : n 1 工作,操作,勞動,作業;工件;功課;努力;行為,作用。2 (待辦的)事務,業務;職業。3 〈前有...
  • requisition : n 1 要求,請求,命令,必要條件;【國際法】引渡犯人的要求。2 需要;【軍事】征購,徵用,征發。3 通...
  1. All the work of this paper can be concluded as follows : 1 to research the ways of quota calculating 2 to build up the mode of data stream, analyze and introduce the work principle of system 3 to research of the structure of system and accomplish the function 4 to research the relationship between the system and tache of production and management, to research the pontes of system ( including man and computer, bom designing and maintenance system, capp, process aided designing system, others ) 5 to research the ways of software designing, database designing and accomplishment this system can finish the quota calculating and editing of parts and components, make requisition, examine and approve of the quota list and provide the data maintenance and management, and print various quota lists and classified collect lists

    本文主要進行了以下幾方面的工作: 1 、材料消耗定額制訂方法的研究2 、建立數據信息流程模型、系統的工作原理的分析和介紹3 、計算機輔助材料定額系統結構的研究開發與系統功能實現的研究4 、在工藝數字化系統中材料消耗定額與其他生產管理環節和系統的關系(包括人機介面、 capp系統介面、工藝行程輔助編制系統介面及其它系統介面)的研究5 、軟體設計方法和系統數據庫設計和結構實現的研究系統可以實現零部件主要材料和車間輔助材料消耗定額的計算機輔助編制、修訂,修改通知單輔助生成。定額明細表瀏覽審批並提供定額制訂基礎數據維護管理功能,按要求列印輸出各種定額明細表和分類匯總表。
  2. Answer : preparative job includes : understands workplace one, the moving circumstance of 2 equipment, this job has with moving equipment without direct connection, have the job that cooperates without need with other team and group ; makes working priority discipline and the blemish that prepare to solve and weak point ; the staff member makes clear to divide the work and be familiar with the concerned data such as blueprint and test gauge cheng ; should be had the blueprint that agrees with actual state, record that examines last, newest rectify spare parts of the instrument that decides requisition, test gauge cheng, qualification, machine parts or tools kept in reserve, tool and join lead to wait ; is a few righter important equipment, especially complex protector or couplet jumps loop protector, should weave test program, working controller should fill in ticket of protection safety precaution, examine and approve via technical chief, just can carry out

    答:預備的工作包括:了解工作地點一、二次設備的運行情況,本工作與運行設備有無直接聯系,與其他班組有無需要配合的工作;制定工作重點項目及預備解決的缺陷和薄弱環節;工作人員明確分工並熟悉圖紙與檢驗規程等有關資料;應具備與實際狀況一致的圖紙、上次檢驗的記錄、最新整定通知單、檢驗規程、合格的儀器、備品備件、工具和連接導線等;對一些重要設備,非凡是復雜保護裝置或有聯跳迴路保護裝置,應編制試驗方案,工作負責人應填寫繼電保護安全措施票,並經技術負責人審批,方能實施。
分享友人