work-measurement 中文意思是什麼

work-measurement 解釋
工作計量
  • work : n 1 工作,操作,勞動,作業;工件;功課;努力;行為,作用。2 (待辦的)事務,業務;職業。3 〈前有...
  • measurement : n. 1. 測量,計量,量度。2. 份量,尺寸,大小,寬度,厚度,深度(等)。3. 測量法。 measurement goods (按體積、容積計算的)體積貨物。
  1. Form that measurement environment noise, if the building return the not yet finished work, then seek the warm air, airiness and air condition hvac engineer, want them with the appearance to expect the environment noise worth

    測定環境噪音,如果建築還未完工,則找暖氣,通風與空調hvac工程師,要他們以畫面的形式預期環境噪音的值。
  2. This paper deriving the theory work inflection point in the static stage characteristics curve of small measurement range linear dimension measurement. by the way of high pressure and back pressure pneumatic measure and designed the parameter of the mainly and measure spray head, which are the key component in the spray head - baffle pneumatic sensor. the different groups for the main - spray head and the measure spray head, will effect the dynamic and static stage characteristic parameter. the author have done contrast experiment and optimization design to test and verify the theory derivation whereby made the rang of show valve of pneumatic measure system measure range up to 40 u m, the sensitivity up to 100mv / u m, resolution up to 0. 05 p m, the uncertainly of measure is less than 0. o2 u m, satisfaction of requirement of groups the carboy hatch thickness size precise measure of soft shims

    對高壓背壓式氣動測量用於小量程線性尺寸測量的靜態特性曲線的理論工作拐點進行了推導,對氣動測量系統中的噴嘴-擋板型氣動傳感器中的關鍵部件? ?主噴嘴和測量噴嘴的參數進行了理論設計,對主噴嘴和測量噴嘴的不同組合,將影響測量系統靜、動態特性指標的噴嘴參數進行了對比實驗和優化設計,並通過實驗驗證了理論推導,從而使氣動測量系統量程的示值范圍達到40 m ,靈敏度達到100mv m ,解析度達到0 . 05 m ,測量不確定度小於0 . 2 m ,滿足了壓縮機缸蓋軟體墊片厚度尺寸精密測量分組的要求。
  3. Rotation - cavitation mechanism was outlined based on the experiment results and the essential conditions for the occurrence of auxetic properties in polyolefin blends were concluded as followed : firstly there must be at least two phases, the matrix can be soft materials which were able to be networks when being stretched, as well as suitable consistence must be provided between two phases. fracture stress work measurement was optioned to characterize the force between two phases. finally, the auxtic property repeatability of the blends was measured and the fact that the auxetic property could only occur in the elastic range was certificated by the result that only the specimens which were stretched for 5s, 10s had repeatability after being retained for 1 months

    實驗工作的最後一部分研究了體系負泊松比效應的可重復性,選取穩定的負泊松比共混體系在測試數據採集時間為55 、 105 、 155 、 205條件下進行測試,將樣條放置l天、 10天、 30天進行測試,測試結果表明,在5s 、 105條件下測試的試樣在放置一個月後泊松比測試結果具有可重復性,證實了體系的負泊松比現象發生在材料的彈性形變范圍內。
  4. Backed by the group of ten governors, the members of the committee resolved to halt the erosion of capital standards in their banking systems and to work towards greater convergence in the measurement of capital adequacy

    另一種是歐洲澳大利亞和香港模式。根據這種模式,所有的附屬交易都必須在"臂長"的基礎上所達成。
  5. In large dimension measurement techniques, on the two - dimensional optical microscopy work platform displacement signals collection, the introduction of raster feet to achieve large dimension measurements designed raster signal acquisition circuits, a collection of analytical studies of the key circuits, the corresponding solutions, and discussed work platform displacement signals, image data and the actual dimension ; meanwhile driving mechanism designed electrical circuit, laying the foundation for the measurement of two - dimensional work platform automatically

    在超屏幕尺寸測量技術中,關於二維光學顯微工作臺位移信號採集,採用了光柵尺來實現超屏幕尺寸測量,設計了光柵信號採集電路,分析研究了採集電路中的關鍵性問題,提出相應的解決方案,並討論了工作臺位移信號、圖像數據與實際尺寸的關系;同時設計了電機驅動介面電路,為二維工作臺自動測量奠定基礎。
  6. Cosmic ray test was carried out to choose and optimize working parameters of full - length prototype and its data acquisition system, verify the electronics system about dynamic range, drift time measurement search window, charge measurement integral width, work stability and electronics grounding and noise. in experiment, acquired abundant experience with the solution of actual problem and verified their reliability of physical design. this lays the foundations for the successful construction of the besiii drift chamber and electrical system

    測試過程中我們調整了電子學的動態范圍、漂移時間和電荷測量參數驗證了電子學系統工作的穩定性、抗干擾能力及噪聲水平等並成功解決了實驗過程中遇到了問題。通過長時間的取數進一步檢驗了全長模型和電子學系統工作穩定性,驗證了全長模型及其數據獲取系統物理設計的可靠性,為漂移室和電子學系統的成功研製奠定了基礎。
  7. Applying varieties of work measurement methods, work study on weiber r6c full automatic linear edge bonding machine of some enterprise was carried through

    摘要應用多種作業測定方法對板式傢具生產中使用的威霸r6c全自動直線封邊機進行了作業研究。
  8. Among his many contributions to the field of turbulent thermal convection, his work in high prandtl number heat flux measurement played a pivotal role in settling a long - standing issue in the field

    他在湍流熱對流領域中有著眾多的貢獻,尤其是關于高普朗德數下湍流傳熱方面的實驗研究,此研究對于解決這個領域中長期未決的問題起了極為關鍵的作用。
  9. Firstly, the theory summarize of r & d project evaluation and performance measurement are done, the limitation and shortage of traditional evaluation and measurement is pointed out ; afterward, the purpose and content, the methodologies and classify, the basic principle and work procedure, the reporting and organizing are dissertated ; and then, the influence factor and the main parameter of the r & d project performance measurement are analyzed, the index of performance measurement are discussed emphatically, based on this, a dynamic and effective r & d project performance measurement system is developed, it comprises designing, implementing and updating performance measurement systems ; at last, the development current of r & d project evaluation and performance measurement is discussed and the conclusion of this paper is made

    首先,本文對r & d項目評估和績效測度進行了理論綜述,指出了傳統評估與測度的缺陷與不足;然後,論述了r & d項目評估的目的和內容、方法和分類、基本原則和工作程序、組織與報告工作;其次,分析了r & d項目績效測度的權變因素和主要參數,重點探討了測度指標,並在此基礎上開發了一個動態有效的r & d項目績效測度系統,包括對r & d項目績效測度系統的設計、實施和更新;最後,探討了r & d項目評估與績效測度的發展趨勢並得出了本文的結論。
  10. Hand - held portable power tools - measurement of vibrations at the handle - pavement breakers and hammers for construction work

    手持便攜電動工具.手柄振動測量.施工用路面碎石機和汽錘
  11. 3. the new microwave power supply ( mps ) can work in vacuum and its power measurement is convenient. the output power could be adjusted with the change of control voltage, and the reflecting power could be gotten by measuring the output voltage of attenuator and detector

    ( 3 )可在真空下穩定工作的新型微波源功率的測量較為方便,通過改變控制電壓的大小可以調節輸出功率,通過測量衰減檢波器的輸出電壓信號可實現反射功率的測量。
  12. The material moisture content measurement method is based on measuring the variation of electrical resistance. until now, no literature has been found to report the similar expenmental work in the world

    這些研究是國內外首次對生土建築材料的熱濕物性參數進行全面研究和探索,測試數扼和一些測試方法都具有國際先進性。
  13. The form of distortion of work piece was studied, and the software rectification method of three coordinates measurement data was pot forward accordingly

    摘要研究了工件的變形形式,並依此提出三坐標測量數據的軟體矯正法。
  14. Management services - guide to work measurement

    管理服務.第3部分:工作度量導則
  15. Methods for airborne dust measurement in work place

    作業場所空氣中粉塵測定方法
  16. Lagrange wave speed in the release process was computed from the measurement, and result shows a good agreement with the data in literature. furthermore from the lagrange wave speed, the stress - strain relationship in the release process was calculated using the impedance match solution. comparison of the stress - strain with the fluid elastic - plastic model indicates that ofhc copper exhibits a clear work - harden behavior during the release

    根據界面粒子速度剖面,計算得到了卸載過程中lagrange聲速隨界面粒子速度變化的關系,所得結果與文獻給出的數據符合很好;其次,利用阻抗匹配近似,計算分析了無氧銅卸載過程的應力-應變關系,並與流體彈塑性模型進行了比較,結果表明:無氧銅的卸載過程存在明顯的應變硬化效應。
  17. From the viewpoint of work study, all kinds of man - machine relationship in furniture production, which are the bases of methods study and work measurement, were studied

    摘要從作業研究的角度研究傢具生產中的各種人機關系,為進一步的方法研究和作業測定提供理論基礎。
  18. Is work output during the overtime period monitored against established work measurement standard

    公司是否按既定的評估準則來監察逾時工作的工作產量?
  19. Management services - guide to determination of exposure limits, recovery times and relaxation times in work measurement

    管理服務.第5部分:工作度量中考驗極限恢復時間和放鬆時間測定指南
  20. Experience in areas of material handling equipment, productivity improvement, work measurement, work methods and standards, financial analysis

    具備5年在上述其一領域工作或物料運輸方面的工作經驗。
分享友人