working power 中文意思是什麼

working power 解釋
使用動力
  • working : adj 1 工作的,從事勞動的。2 操作的,作業的。3 工人的。4 (用於)實際工作的,任事的;使用(中)的...
  • power : n 1 力,力量;能力;體力,精力;(生理)機能;〈常 pl 〉才能。2 勢力,權力,權限;威力;政權;權...
  1. It looks upon water resistant as load, simulate every instance of locomotive running and check its every parameter automatically, then collect and dispose these data of parameters, calculate the power of simulating running of locomotive, which is based on the current, and voltage of host dynamotor. afterward, it can be judged from the working state of locomotive. through experiment and adjust each parameter, it can provide important warrant to the components of locomotive whether they can work normally and credibly

    即以水阻作為負載,模擬機車運行,對機車的主發電動機的電流、電壓和柴油機的轉速等參數進行檢測,並對檢測結果進行處理,計算出模擬機車運行時的功率,並以此為依據,對機車的工作狀念進行判斷,通過水阻試驗,調整有關參數,使機車運行時能發揮所要求的功率和滿足規定的工作特性。
  2. The wdzs1 series brakes is fricative braking device automatically set to working by a spring when a power - cut occurs. it ' s widely applicable in automatic door, stage apparatus, medical appliances, offics facility, etc., to secure a prompt and accurate braking effect

    Wdzs1系列微型電磁失電制動器為通電脫離(釋放) 、斷電彈簧制動的摩擦式制動器,廣泛應用於自動門、舞臺、醫療器械、辦公設備等機械傳動系統中,實現快速停車和準確定位。
  3. But when fault was occurred, sometimes there would be great loss. for the reason, the paper put forward a microcomputer bus protection scheme suit for mv or lv power system with low current grounding based on the great researching about the working theory of current bus protections and the characteristic of mv or lv system with low current grounding. based on it, the paper has designed the platform of the hardware and the software programs

    針對國內目前中、低壓電網大都未裝設母線保護裝置,發生故障不能及時切除時造成很大損失的狀況,本文在廣泛研究當前主流的母線保護動作原理並認真分析了中、低壓小電流接地系統特點的基礎上,提出了一套適合中、低壓微機母線保護裝置的研製方案,並據此選擇、搭建了硬體平臺,設計了軟體功能程序。
  4. Based on my working experience in beijing trs information technology limited and the particularities and complexity of e - government requirement and purchasing process are studied by using modern marketing theories and methods systematically in the beginning. and the actual status and characteristic of the e - government software market in china was analyzed scientifically through comparing approach of products competing dominance and market share, increscent sales ratio. then competition status of trs e - government system was evaluated by porter five forces model and a conclusion is that trs lacks of competitions power

    本文結合筆者的實際工作,根據政府部門對電子政務軟體產品技術和服務要求的特殊性和其采購過程的復雜性,系統運用了現代市場營銷理論的基本原理和方法,首先分析了電子政務軟體市場發展狀況和特點,運用產品競爭優勢比較、市場佔有率和銷售增長率比較等方法,根據波特競爭力模型對trs電子政務系統的行業市場競爭情況進行了評價,得出了trs電子政務系統市場競爭力不足的基本結論。
  5. The myriapod s response to the holy names indicates their sacred power. this is a reminder that we should always remember to recite the holy names, particularly when we are working, driving or walking outside at night, so that all visible and invisible beings around us can benefit

    另外,小蟲對佛號的反應,印證了師父所傳佛號的神聖力量,同時也提醒我們無論在工作開車或是夜行時,都應時時記得默念佛號,以利益有形無形的廣大眾生。
  6. The effect of cutting speed, cutting thickness, cutting knife and materials on the working power capacity is discussed. finally tractive property of road plane milling machine is also studied. through the comparison of the results of theory calculation and experimental results the equation of working power capacity of milling machine is modified

    本文對冷式瀝青路面銑刨機的動力學工作過程進行了理論分析與試驗研究,並利用金屬材料切削的基本原理,研究了主切削力,並從能量轉化守恆的角度推導了銑刨機銑刨作業阻力和功率計算公式,討論了機器切削速度、銑刨厚度以及刀具與材料特性對銑刨作業阻力和功率的影響規律,最後討論了銑刨機牽引性能,且通過試驗研究驗證了銑刨作業阻力和功率公式。
  7. This thesis built the models computing the working frequency over - voltage " operation over - voltage for 220kv fugai transmission line, calculates and analyzes working frequency over - voltage " operation over - voltage using emtp program and provides reasonable protection measures for the transmission line. furthermore, regulations method, traveling wave method and striking distance method are used to study and compare lightning - enduring capabilities of different types of pole in power transmission lines aiming at the fact that the lightning strike switching rate of 220kv fugai line is higher

    本文分別建立了計算220kv復蓋線路的工頻電壓升高及操作過電壓的計算模型,利用emtp程序對220kv復蓋線路工頻電壓升高、投切空線過電壓、投切空變過電壓、單相故障過電壓進行計算分析,並提出合理的防護措施。
  8. As for it also has low working voltage and small power dissipation, it has became the ideal succedaneum of crt. furthermore, fed doesn ’ t need negative photo, large visual angle, wide working temperature extent

    另外, fed不需背光、視角大、工作溫度范圍寬等優點也對目前平板顯示器的主流產品有源矩陣液晶顯示器提出了嚴峻的挑戰。
  9. The condition - based maintenance can solve this problem perfectly. in order to detect abnormal symptom or terminative evidence of the working - life, the on - line monitor and diagnose about high - voltage electric power equipment is necessary

    這就有必要對運行中的變電設備進行監視和診斷,以便能檢測到異常情況的徵兆或使用壽命終結的跡象。
  10. The paper simulated the 10kw space solar power system, the outcome and the test data can be used as the reference to choose the facility or the working substance

    本文較完整和準確地完成了10kw太陽能熱動力電源系統的模擬工作,其模擬試驗結果有助於設備選型和工質選擇。
  11. Application : applied to electrical installation or maintenance, etc aloft work application, telecommunication technician working, electrical power maintenance technician and the similar kind of work, etc

    用途:電力安裝和維修等高空作業用,適用於外線電工,電信電工作業,電線維修工等類似工種使用。
  12. ( 5 ) " electronic controlled bypassing air + three - way catalytic converter " system used for carburetor petrol engine which " is capable of setting up working condition for three - way catalytic converter and can solve the contradiction between emission control ( controlling hc, co, nox at same time ) and power, torque, fuel consumption having been put forward

    ( 5 )建立了針對化油器式車輛的「電控補氣+三效催化轉化器」系統,通過採用雙迴路電控補氣可以為三效催化轉化器建立良好的工作條件,較好的解決了化油器式汽油機動力性、排放(同時降低hc 、 co和nox )之間的矛盾。
  13. First, it analyzes the working principle and some features of the system, such as the circulating current characteristics, power distribution characteristics, and characteristics about closed loop regulation of voltage. then it goes on to the study of some typical control methods, and designs on this basis, a parallel controller using a synchronization control strategy of racing to merging and a load - sharing strategy combined with feedback control and drooped control

    文中,首先通過建立系統的數學模型,分析了逆變電源並聯運行的工作原理以及並聯系統的一些主要特性,包括它的環流特性、功率特性和電壓閉環調節特性;在此基礎上,又研究了幾種典型的並聯運行控制方式;然後,採用搶占與並發相結合的同步控制方式和反饋與下垂特性相結合的負載均分控制設計了並聯控制器。
  14. The technical measures for deep reducing coal moisture were urgent needed due to china devoting major effort to implement the new and high technologies used for coal liquefaction and preparation high purity coal. through the analyses of current situation of technical level for coal drying and dewatering, the paper suggests to take overheat steam produced from power plant as a heat source, use the disk dryer to deeply reduce coal moisture with simple working process and low production cost

    本文針對我國人力實施煤炭液化和超純煤制備等高新技術,迫切需要將煤中水分深度脫除的技術手段,通過對我國煤炭乾燥脫水技術現狀與水平的分析,提出以電廠過熱蒸汽為熱源,利用盤式乾燥機,以簡捷的乾燥工藝、低的乾燥成本,深度脫除煤中所含水分的技術方案。
  15. The reasons of small town ’ s liability have three aspects. the first reason is that there are various reasons forming the debt ? ? slowly development of economy result in deficiency of capital, and the randomness and nonstandard expenditure cause serious waste. the second, the rigidity financial expenditure spends in wage, education, road, irrigation construct and rising in payment, and the asymmetric bread between financial power and working power in management system

    鄉鎮債務形成的原因多種多樣,客觀分析起來,鄉鎮債務形成的原因多種多樣,既有經濟發展緩慢導致鄉鎮財源不足,也有開支的隨意性和不規范導致浪費嚴重;既有工資、教育、道路、水利建設和加薪等剛性財政支出過大,也有財政管理體制方面財權和事權的不對稱留下的缺口;既有投資決策失誤背上包袱及其他歷史遺留問題,也有鄉鎮機構臃腫、冗員過多增加開支的因素。
  16. For high voltage power system, difficulties in monitoring temperature online lie in isolating the electric potential of transmission signal and obtaining the electric working power of temperature detecting device of high voltage

    對于中高壓電力系統,其溫度在線監測的困難在於高低壓間信號傳輸的電位隔離和高壓側溫度測量裝置工作電源的獲取。
  17. The hardware circuit design include : industrial control computer configuration, selection of industrial control board type, design of the power supply and monitoring interface circuit, design of signal processing interface circuit ( the constant current source circuit, the time base signal processing circuit, the processing circuit for the signal to be measured ), design of panel control circuit, design of the system self - checking circuit, and etc. the program flow hart include : main program flow chart, system boot - strap self - checking program flow chart, manual static testing program flow chart, semiautomatic static testing program flow chart, automatic static testing program flow chart, dynamic testing program flow chart, transient testing program flow chart, source voltage and current monitor program flow chart, investigate function testing program flow chart, and etc. the measure system offers six working power supplies, the signal of time base, the signal of constant current source, sine wave signal and step to leap signal, and measures the frequency of the output pulse signal of the wide range pulse convert circuit accurately under three kinds of different test state ( static form, dynamic form and transient form )

    硬體電路設計包括:工控機配置、工控板卡選型、產品電源及監控介面電路設計、信號處理介面電路(恆流源電路、時基信號處理電路、被測信號處理電路)設計、面板控制電路設計、系統自檢電路設計等。程序流程圖包括:主程序流程圖、系統開機自檢程序流程圖、手動靜態測試程序流程圖、半自動靜態測試程序流程圖、自動靜態測試程序流程圖、動態測試程序流程圖、暫態測試程序流程圖、電源電壓和電流監控程序流程圖、研究功能測試程序流程圖等。測試系統提供六路工作電源、時基信號、恆流源信號、正弦波信號和階躍信號,並對三種不同測試狀態(靜態、動態、暫態)下大量程脈沖變換電路輸出脈沖信號的頻率進行精確測量。
  18. Max working power

    最大工作功率
  19. Yet there s power, wonder - working power, in the goodness and idealism and faith of the american people

    但在美國人民的善良、理想主義和信仰中蘊藏著力量,創造奇跡的力量。
  20. 3. this test card working power source can choose

    3 .本卡工作電源可選擇
分享友人