working under capacity 中文意思是什麼

working under capacity 解釋
開工不足
  • working : adj 1 工作的,從事勞動的。2 操作的,作業的。3 工人的。4 (用於)實際工作的,任事的;使用(中)的...
  • under : adv 1 在下,從屬著,服從著。 bring under get under keep under 等〈參看各該動詞條〉。 The ship wen...
  • capacity : n 1 包容力,吸收力,收容力。2 容積,容量;【電學】電容,負載量。3 能力,才幹,本領;性能,機能。4...
  1. The shear mechanism, failure mode, deformation capacity, bearing capacity and the reliability of the anchored angle steels of the wrapped steel concrete cast - in - site frame typical story exterior joints under the middle and high axial compression ratio ( n = 0. 3, 0. 5, 0. 6 ), the working performance, failure mode, and the shear capacity of top story joints under the crack moment, the hysteresis characteristic and the dissipation energy capacity of the test joints are all analysed based on the 1 / 4 model pseudo - static tests of five specimens of wrapped steel concrete cast - in - site frame exterior joints, which varied in axial compression ratio, distribution of the beam angle steels and the stirrup ratio

    基於上述分析,本次試驗通過五個外包鋼混凝土邊節點1 4比例模型的偽靜力試驗,以柱的軸壓比、梁角鋼布置形式、配箍率等為主要參數,分析外包鋼混凝土現澆框架一般層邊節點在中高軸壓比( n = 0 . 3 、 0 . 5 、 0 . 6 )條件下,節點的抗剪機理、破壞模式、變形能力、承載能力和角鋼錨固的可靠性;分析了頂層邊節點在張開彎矩作用下的工作性能、破壞模式和抗剪承載力;分析了試驗節點的滯回性能和耗能能力。
  2. The stressing mechanism of steel tubular piles is analyzed and the methods to improve the bearing capacity of steel tubular piles under the same working conditions are proposed and described in the light of the construction practice of steel tubular piles for piling wharfs for many years

    結合多年來的高樁碼頭鋼管樁基的施工工程實例,分析了鋼管樁的受力機理,介紹了在同等條件下提高鋼管樁承載力的方法。
  3. Abstract : based on the systematic analysis of the shear behavior for r. c. beams, the tests of 11 simple supported beams under the top concentrated loads and the uniform loads are supplemented. the prime variable is shear span ratio, span depth ratio, horizontal web reinforcement ratio and vertical web reinforcement ratio. according to the test results, the working behavior, the prime shear failure modes, the effect of concrete and web reinforcement ( horizontal web reinforcement and vertical web reinforcement ) and other aspects of r. c. beams are analysed. the uniform calculation method for shear capacity of deep beams, short beams and shallow beams for practical is presented

    文摘:在對國內外鋼筋混凝土梁的受剪性能進行較系統分析的基礎上,補充了11根鋼筋混凝土簡支短梁在頂部集中荷載和均布荷載作用下的試驗,試驗梁的主要變化參數為剪跨比、跨高比、水平腹筋率和垂直腹筋率.根據試驗結果,對試驗梁的工作性能、主要的剪切破壞形態、混凝土項的抗剪作用、抗剪腹筋(包括水平腹筋、垂直腹筋)的作用等進行了較為深入的分析,提出了可適用鋼筋混凝土深梁、短梁和淺梁相互協調的受剪承載力的統一計算方法
  4. The detail procedures of the loading test on the ultimate bearing capacity under different load cases and the author ' s first - hand experience during the tests are documented in the paper. based on the experimental performance, it has been verified that the superposed floor assembled by the precast - prestressed sandwich slab working under the design and the reliability of the lateral connecting character of the slab

    在板側縫內施加后張法無粘結預應力,在構造上利用板側伸出的鋼筋相互搭接實現橫向傳力,變單向受力為雙向受力形成裝配整體式樓蓋結構,可明顯改善樓蓋結構的受力性能。
  5. In view of the technical problems of softening of foundation soil and reduction of bearing capacity of the breakwater under the action of repeated wave loads during the execution of the second phase of the deepwater waterway regulation project in the changjiang estuary, tianjin port construction corporation has successfully developed safer, higher quality and highly efficient technology and special - purpose marine craft and machinery for laying deepwater sand blankets and offshore installation of prefabricated drains, which were more suitable for the working conditions in the changjiang estuary, and has also explored the construction technology for prefabrication of caissons with rubber anti - sliding plates, to ensure the efficient implementation of the engineering measures against softening of foundation soil

    摘要針對長江口深水航道治理二期工程施工過程中遇到的堤身在波浪重復荷載作用下地基土出現軟化、承載力降低的技術難題,第一航務工程局成功開發了適合長江口工況的安全、優質、高效的深水砂被鋪設和海上塑料排水板打設施工工藝及專用船機設備,探索了一整套帶橡膠阻滑板的沉箱預制施工工藝,確保了抗軟化工程措施的有效實施。
分享友人