井下斜井 的英文怎麼說

中文拼音 [jǐngxiàxiéjǐng]
井下斜井 英文
inside slope
  • : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
  • : 下動詞1. (用在動詞后,表示由高處到低處) 2. (用在動詞后, 表示有空間, 能容納) 3. (用在動詞后, 表示動作的完成或結果)
  • : 形容詞(跟平面或直線既不平行也不垂直的) oblique; slanting; skew; bevel; diagonal; askew; inclined; tilted
  1. It occurred many times on the ocean of shengli oil field that driving piles were defeated, artesian well flat roof leaned, oil transport pipe brook and oil leaked in the year of 1984, 1987, 1994 and 1998

    勝利油田在1984年- 1987年、 1994年、 1998年多次發生海上插樁失敗和暴風浪採油鉆平臺傾、輸油管破裂漏油。
  2. And the reefs can be divided into three types : reefs developed in the margin of platform, mud mound in the low slope and patch reefs within the platform

    黃泥塘一帶屬紅椿灣邊緣坡的泥丘礁或生物灰泥丘。建7區、石寶寨、老龍洞等生物礁則屬于臺內點礁。
  3. Different drilling fluid systems have been used in the horizontal well drilling in north tarim area, more specifically, polymer drilling fluid is used in the top hole of large size, and polysulfide drilling fluid for the lower interval ; for the building section and horizontal interval, polysulfide drilling fluid mixed with oil is used

    塔北地區水平上部大眼採用聚合物鉆液體系、段採用聚磺鉆液體系、造段及水平段採用聚磺混油鉆液體系。
  4. The construction techniques of sinking well and explode in water are introduced. auto climbing form panel technique is applied in the construction of main tower

    拉橋主橋墩設計為鋼筋混凝土圓端型沉結構,其中詳細介紹了沉沉施工技術,同時介紹了水松動控制爆破技術。
  5. The curves of the consolidation settlement in soft clay base of flood land are gained, which compare the effect of sand drain. the settlement - time curves in different period are also gained, which increase the height of embankment to 8m, based on the test data of hang - yong highway. furthermore, the consolidation settlement characters of these entity engineering are analyzed, and, the variation rules of the rate of grade and degree of the curves in different period in the whole section, the maximal settlement and the liner regression relations between the rate of grade and degree are calculated

    本文利用大變形固結有限元分析程序( lscfea )中的小變形平面固結分析單元( sse2 ) ,結合實體工程項目進行了地基固結沉降的有限元計算,分別得出河灘相軟土地基在考慮砂和未考慮砂作用的固結沉降曲線及杭甬高速公路試驗段在高堆載情況的固結沉降曲線;並對以上曲線特徵進行了分析,得出各時間段曲線率、角度在整個斷面的變化規律,以及沉降最大值與率、角度變化之間的線性回歸關系。
  6. Company has expertise on multi - lateral well, rotating liner hanger cementing, geosteering, vertical drilling, dexpandable pipe, casing open window, verious completion, repairing, incident handling, special tubing running, special connection maching and so on

    有能力進行分支多底、旋轉尾管固、地質導向、防打直、膨脹管、套管開窗,各種完、修、事故處理、特種油管套管入、特種絲扣加工等。
  7. This paper, based on normalizing well logging data while drilling and correcting depth into true vertical depth and calculating reservoir parameters and etc, combining the practical ease of mobei oilfield, extracted logging and geological pattern characteristic of target oil - gas formation and geosteering mark formation, and used bp neural network and regressive analysis to create predicting mode of geosteering parameter to build relevant contrast curve ; adopted geometry geosteering method to fix on die drilling direction of bit upper and declination, the position in reservoir, to judge the real drilling case. all finely solved the problem to follow the geological target while drilling for three horizontal well these methods improve the drilling horizontal well ability by using the techniques to follow the geological target while drilling, and then it is convenient and practicable

    本文在開展隨鉆測資料的標準化和校正及儲層參數解釋與含流體性質判釋等工作的基礎上,結合研究工區莫北油田的實際情況,提取了目標油(氣)層和導向標志層的測地質模式特徵,並採用bp神經網路法和回歸分析法建立了地質導向參數的預測模型、構造了相應的對比曲線;採用幾何導向法確定鉆頭上傾鉆進方向及其在目標層的位置,以判斷實際鉆進地層情況,很好地解決了研究工區三口水平的隨鉆跟蹤地質目標的問題。
  8. Water invasion bursten out during the railway - tunnel construction is usually the mainly problem in constructing or operating, also which brings surface water to exhaustion and pollutes environment or effects ecology, etc. the geleshan tunnel which crosses through guan - yin gorge anticline which trend is near south north, is located between tuanjie village and jingkou village of the shapingba zone, chongqing city, which is belongs to the inducting segment of yu - huai railway. the guan - yin gorge anticline appears to ridge and slot interlacing in land form, and is composed of clastic rock and carbonate rock from jurassic xintiangou group to triassic

    歌樂山隧道位於渝懷線引入段重慶市沙坪壩區團結村至口村之間,隧道穿越近南北向的觀音峽背,地貌上表現為脊、槽相間,觀音峽背由侏羅系新田溝組至三疊系統碎屑巖和碳酸鹽巖組成,歌樂山頂大部分出露可溶巖地層,地表巖溶發育,有大量泉水和暗河出口,並修建有多個中小型水庫、大量池塘和水
  9. No way, he left the well and came back his own tablet

    韋馱急忙放回歸神位。結果這就成了
  10. In this article, we use idea of turning dispersion into convergence and put all the well ' s points into the same unit net to think about it. and answer three questions of the distribution of well drilling by the way of searching for groups of points. fincite - step - searching underthe condition of translationg fcoordinate system or revolving coordinate system. to first question. we find two algo - rithms and make use of data that is given to find the solution. we seek coorlinate of net point is co. 361, 0. 461 ) and mostly four old well ' s points are utilized at the same time by first algorithim, which are no. 2, no, 4, no. 5, no. 10. by second algorithm, we rechon the coordinate of net point is co. 390, 0. 505 ). and that mostly four old well ' s points are utilizld which are no. 2, no. 4, no. 10. to second question, we turn it into the first question by angling awt the center of net point. we seek that mostly six old well ' s points are utilized at the same time, which are no. 1, no. 6, no. 7, no. 8, no. 9, no. 11, when net is angled 0. 78 radian. and net point is translated to ( 0. 75, 0. 076 ) ( at nwe coordinate system ). to third question, wefind a necessary and sufficient condition and affer algorithms, at last, we analyse algorithms

    運用化分散為集中的思想,把所有的點都放在同一個單位網格內考慮.在坐標可平移、旋轉的條件,利用尋找點群、有限步驟搜索法,對鉆布局的三個問題進行了解答.對問題一,給出了兩個不同演算法.並對題目提供的數據進行了求解,演算法1得到的結點為( 0 . 361 , 0 . 461 ) ,最多有4個舊點被同時利用,它們是第2 、 4 、 5 、 10個點;演算法2得到的結點為( 0 . 390 , 0 . 505 ) ,最多有4個點被利用,它們是第2 、 4 、 5 、 10個點.對問題二,以結點為中心旋轉一定的角度后,歸結為問題一進行求解,求解結果為當網格傾角為0 . 78弧度(相對原坐標系) ,結點平移到( 0 . 75 , 0 . 076 )點(在新坐標系) ,可被同時利用的最多舊點為6個,它們是第1 、 6 、 7 、 8 、 9 、 11個點,對問題三,我們給出了充要條件,並給出了演算法.最後還分析了演算法的優劣性
  11. ( 5 ) based on the integrated sequence stratigraphy analysis of typical wells section and many well - to - well section, the control of hinge fault is confirmed. system tracts of downfaulted block perfectly develop, from lower position to higher position, upfaulted block ( west - north region of the gentle slop ) is in turn pgc, tst, hst, overlapping in sb

    ( 5 )通過典型剖面及眾多連剖面的層序地層分析,證實樞紐斷層的控製作用,斷層降盤各體系域發育完整,而其上升盤(西北坡區)由低處向高處,依次是pgc 、 tst 、 hst超復于sb之上。
  12. There have been many questions about the petroleum pool formation conditions and models for this area since the first well was drilled in 1988, which has had an great influence on the further petroleum exploration and development. in this study, a method with the combination of petroleum geology, sequence stratigrapy, organic geochemistry and geophysics, based on drilled core analysis data, well data and seismic sections, has been applied to investigate the petroleum pool formation conditions and models in this area, and the following results and recognition have been obtained : ( 1 ). the lower tertiary strata are subdivided into two sequences and seven systems

    本研究以鉆取心分析資料、測數據、地震資料為基礎,綜合利用沉積學、層序地層學、石油地質學、地球物理學、有機地球化學等多門學科的有關理論和研究方法,通過對埕島東坡區油氣藏形成條件和模式研究,主要取得了以幾個方面成果和認識: ( 1 )埕島東坡地區第三系共劃分兩個層序、七個體系域,其中沙一段至東三段中部沉積為層序,東三段上部至東一段為層序。
  13. On the illustration of mining in deeply inclined coal seam under buildings in muchengjian colliery in beijing, the confirmation method of coal pillar dimension and the united layout of pseudo - dip strip pillar and boundary pillar were put forward to provide theory foundation for the control of surface movement and subsidence in the mining of deeply inclined coal seam

    摘要以北京木城澗煤礦大臺建築物壓煤開采為例,提出了急傾煤層開采條件條帶煤柱尺寸的確定方法和傾條帶煤柱與邊界煤柱相結合的條帶布置方案,為急傾煤層開采地表沉陷控制提供了理論依據。
  14. Moreover, a series of solution to these difficulties are brought forward : applying the theory of fold related to fault to interpret complex structural belts in piedmont : analyzing the features of the surface and underground seismic reservoir prediction and porosity model construction to predicate effectively the texture and quality of sandbodies ; using structural model to direct the construction of velocity model and process prestack migration imaging of seismic data ; utilizing interval velocity to forecast reservoir pressure : improving the drilling technology for pressure detection and prompt protection of vertical well against incline well

    並針對主要難點提出了解決對策:正確應用斷層相關褶皺理論解釋山前復雜改造、開展地表地震儲層與孔隙建模有效預測砂體結構與質量,利用有效構造建模指導速度建模與疊前偏移成像、開展層速度預測地層壓力與鉆壓力檢測及快速防打直配套鉆技術攻關等。
  15. ( 4 ) a veries of depositional system of early cretaceous have been identified firstly : basin floor fan, slope fan, leveed channel, subparallel facies, slump facies, lowstand wedge, tst, hst. combining with seismic reflection and log response, this paper discusses distribution of above facies, microfacies and reservoir characteristics

    ( 4 )首次確定了白堊統的各種沉積體系:盆底扇、坡扇、有堤水道、亞平行相、滑塌相、低位楔、 tst 、 hst ,結合地震反射和測響應,討論了它們的分佈,微相和儲層特徵,對今後勘探開發上作無疑有重要價值。
  16. According to the hydrogeology character, water point distributed rule and water amount dynamic in balitang coal mine, for mining steep coal seam under water, the prevention and cure measures were provided, which were " , dredging " , and " , drawing " , are main and " , blocking " , and " , hinding " , are auxiliary

    從礦水文地質特徵、出水點分佈規律及水量動態入手,對於水體開采急傾煤層的八里塘煤礦,針對性地提高「疏、排」為主、 「堵、躲」為輔的綜合水害防治措施。
  17. In order to get it to fall in, you would have to lift one side of the cover, then rotate it 30 degrees so that the cover would clear the ledge, and then tilt the cover up nearly 45 degrees from horizontal before the center of gravity would shift enough for it to fall in

    要使蓋能掉去,就必須先撬起蓋的一邊,然後旋轉30度,使蓋脫離緣,再將蓋從水平位置向上傾近45度,這樣蓋的重心就會發生轉移以使它能落。
分享友人